Caledonian Sleeper

31160

Established Member
Joined
18 Mar 2018
Messages
1,268
Are we any nearer to a list of forthcoming diversions to the beds yet, I know there are more ECML diversions in the works but I haven't seen a list of dates
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

trebor79

Established Member
Joined
8 Mar 2018
Messages
4,886
What exactly produces that noise on mk3s, I agree that it's really quite irritating? You get it at very low speeds as well.

Can't say I've ever noticed a metallic thrumming noise. There's sometimes an electric motor like noise which I've always assumed to be either air conditioning or the motor generator.
 

Mag_seven

Forum Staff
Staff Member
Global Moderator
Joined
1 Sep 2014
Messages
11,935
Location
here to eternity
Are we any nearer to a list of forthcoming diversions to the beds yet, I know there are more ECML diversions in the works but I haven't seen a list of dates

They are being diverted via the ECML at weekends right now up to and including 16/17 June.
 

district

Member
Joined
4 Aug 2011
Messages
1,109
Location
SE16
Often wondered how well its used , Theres one at Leuchars and at Perth too. How many passengers board the sleeper at Dundee??
I will be on Thursday night! Looking forward to the probably last chance I'll get on the old coaching stock.
 
Last edited:

68000

Member
Joined
27 Jan 2008
Messages
832
I wonder if they were advertising that fact onboard some of the inaugral journeys when it went belly up ?

Could hardly have been a profitable enterprise if everyone claimed !!

As the first night problems were mainly caused by infrastructure issues, Network Rail will be paying CS compensation
 

Dr Hoo

Established Member
Joined
10 Nov 2015
Messages
5,605
Location
Hope Valley
As the first night problems were mainly caused by infrastructure issues, Network Rail will be paying CS compensation
Always worth bearing in mind that the performance regime is related to future revenue loss (I.e. passengers deciding to travel less often) rather than Delay Repay (refund of the fare for the specific journey). Broadly speaking TOCs still take Delay Repay on the chin.
I recognise that Caledonian Sleepers’ business model isn’t exactly typical.
 

greatkingrat

Established Member
Joined
20 Jan 2011
Messages
3,289
Because they want to keep it full? Positive press coverage in the right places will bring in more customers.

They are assuming the sort of people who read railway magazines already know about the sleeper. They are trying to attract new customers who may not have considered the sleeper previously.
 

Statto

Established Member
Joined
8 Feb 2011
Messages
4,053
Location
At home or at the pub
When the sleeper is diverted via the East Coast Main Line, is it not possible to start/terminate at Kings Cross, rather than travising through inner North London then reversing at the Euro Freight Depot in Wembley, seems rather cumbersome route?
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,264
When the sleeper is diverted via the East Coast Main Line, is it not possible to start/terminate at Kings Cross, rather than travising through inner North London then reversing at the Euro Freight Depot in Wembley, seems rather cumbersome route?

No, not if you want to run it with 16 coaches.

It runs into Kings Cross on Saturday mornings when Euston is shut - 12 coaches for Edinburgh / Glasgow and two 8 coach trains for the Highlands. There isn't room at Kings Cross for that on a Monday morning.
 

30907

Veteran Member
Joined
30 Sep 2012
Messages
21,922
Location
Airedale
On ensuites: I am surprised that CS do not follow the example of Nightjet (and predecessors) and supply a bathmat (NJ now use thin cloth ones which come in handy at home... as do the slippers!). Doesn't seem thought-through.
 

Scotrail84

On Moderation
Joined
5 Jul 2010
Messages
2,977
Are we any nearer to a list of forthcoming diversions to the beds yet, I know there are more ECML diversions in the works but I haven't seen a list of dates

Via Bolton and Manchester in July for a period when Acton Grange is blocked.

19th July and the 26th July to the 9th August.
 

Scotrail84

On Moderation
Joined
5 Jul 2010
Messages
2,977
No, not if you want to run it with 16 coaches.

It runs into Kings Cross on Saturday mornings when Euston is shut - 12 coaches for Edinburgh / Glasgow and two 8 coach trains for the Highlands. There isn't room at Kings Cross for that on a Monday morning.

All services into Kings X tomorrow morning and departing from Kings X tomorrow night.
 

trebor79

Established Member
Joined
8 Mar 2018
Messages
4,886
Well tomorrow is a Bank Holiday, so effectively a Sunday rather than a typical weekday.
 

Journeyman

Established Member
Joined
16 Apr 2014
Messages
6,295
When the sleeper is diverted via the East Coast Main Line, is it not possible to start/terminate at Kings Cross, rather than travising through inner North London then reversing at the Euro Freight Depot in Wembley, seems rather cumbersome route?

The Highland Sleepers were diverted into King's Cross for quite a long period following the flood damage to Lamington Viaduct. They had to be shortened for the duration and it caused quite serious capacity problems.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,264
The Highland Sleepers were diverted into King's Cross for quite a long period following the flood damage to Lamington Viaduct. They had to be shortened for the duration and it caused quite serious capacity problems.

Yes, the point being that they ran one 12-coach train rather than two 8-coach trains.
 

Mathew S

Established Member
Joined
7 Aug 2017
Messages
2,167
Via Bolton and Manchester in July for a period when Acton Grange is blocked.

19th July and the 26th July to the 9th August.
Crewe - Stockport - Manchester Piccadilly - Chat Moss - Golborne Junction - Wigan - Preston is the diversion route for this blockade (and vice versa, of course) according to the paths in RTT.
 

33Hz

Member
Joined
2 Dec 2010
Messages
513
I don't think it's the arrival time that's a problem in this case, it's more that passengers who have paid for a "hotel on wheels" level of service are standing around a drafty station concourse until gone 12:30 at night because once again the depot can't get the set out on time.
 

Mathew S

Established Member
Joined
7 Aug 2017
Messages
2,167
I don't think it's the arrival time that's a problem in this case, it's more that passengers who have paid for a "hotel on wheels" level of service are standing around a drafty station concourse until gone 12:30 at night because once again the depot can't get the set out on time.
Indeed. If I'd booked a hotel room only to be told I couldn't get into my room until after midnight, I'd be expecting a full refund and alternative accommodation. I'd love to see CS try to defend a Consumer Rights Act claim over the non-availability of a customer's paid for, and really quite expensive, 'hotel room'.
 