Point taken. I didn't realise it hit something.
However, I think most people would recognise that their introduction has been far from a success so far.
Does anyone know when they were originally scheduled to take over the sleeper?
The GBRf press release in Feb 2017 announcing the traction contract stated the 73s would be in use "from Oct 2015". I know they weren't ready/first introduced until some time after this date - into 2016 I think; I'm sure someone can elaborate...
Interestingly, with the 73/9s (and refurbed 92s) I think the challenges GBRf have faced have been from trying/needing to get them into service TOO quickly, rather than them taking a long time - in doing this, it's resulted in problems that ultimately have taken the length of time they have to get things right.
At the time the contract was won both main traction options weren't 'ready to go' and hence GBRf/Wabtec Brush et al were under pressure to get 6x 92s and 6x 73/9s out and working ASAP. A lot of the rebuilt 73/9s were in a very bad way previously; so evidently needed a lot of work. Where the 92s were concerned, it was probably always a bit ambitious to expect 20 year-old locos which were somewhat temperamental when in regular service to come of long-term store (in many cases), have a quickish overhaul and then perform reliably.
What's since happened is what maybe would have happened had GBRf/Wabtec Brush had more time in the first place; i.e. issues with the initial rebuild/refurb being thoroughly tested and resolved (e.g. the multiple mods on the 92; alternator problem on the 73/9s). They're eventually now getting the planned traction options back on the rails and in a reliable state [from what I've seen the 92s and 73s that have been back through Loughborough have shown decent reliability, bearing in mind things do breakdown sometimes].
Unfortunately, it's been a somewhat long and painful route getting there. However, looks like they'll be there or thereabouts for the new stock, which maybe was the ultimate aim all along...!?