• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Caledonian Sleeper discussion

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
can the 66 & 67 work in multiple together? They both use AAR multiple working.
 

rick pike

Member
Joined
6 Jan 2013
Messages
158
Location
Grimsby
RE. can the 66 & 67 work in multiple together? They both use AAR multiple working.
If you look at DarloRich2009 on flickr (Sorry I cant find the shortcut to the pic) there is a shot of 66710 at Milton Keynes Central that shows the AAR multiple working cable is plugged into both locos. Ive seen pairs of 66s working in multi and pairs of 67s in multi before but never a mix of the two.
 
Last edited:

Bungle965

Established Member
Associate Staff
Buses & Coaches
Joined
2 Jul 2014
Messages
3,373
Location
Calder Valley

marks87

Established Member
Joined
23 Jun 2010
Messages
1,658
Location
Dundee
Which seems to have confused RTT, with the "Planned to terminate at" with no station shown if you check the listing :P

Not a good few days is it!
And if you look at the Aberdeen and Fort William portions, they say that they join with 1M16 at Edinburgh "towards Aviemore".

Presumably, though, the Aberdeen and Fort William portions did continue to Euston?
 

87015

Established Member
Joined
3 Mar 2006
Messages
5,078
Location
GEML/WCML/SR
1M16 (yes, last nights) is reported back at Inverness after spending the night at Slochd - passengers forward on the 09xx Inverness-Edinburgh. Having waved at the tram and other early southbounds going flying past.
What a complete Grade A farce. Again.
 
Last edited:

causton

Established Member
Joined
4 Aug 2010
Messages
5,504
Location
Somewhere between WY372 and MV7
1M16 (yes, last nights) is reported back at Inverness after spending the night at Slochd - passengers forward on the 09xx Inverness-Edinburgh. Having waved at the tram and other early southbounds going flying past.
What a complete Grade A farce. Again.

Christ that's bad... I thought at the worst they would get the East Coast!

Edit: Looking at it, following minimum connection times etc, if they went down the East Coast they would get back to London at 1945!
 
Last edited:

sprinterguy

Veteran Member
Joined
4 Mar 2010
Messages
11,562
Location
Macclesfield
66s are indeed pretty impressive machines.
Well, I wouldn't go that far. ;) They're not a patch on the haulage capabilities or technological advancement of a class 60 from ten years previously, for example. As others have pointed out, it would have required both 66s taking power to shift the HOBC.

They're competent bread and butter machines, really, which is okay seeing as that is what the freight operators are asking of them.
 
Last edited:

LeylandLen

Member
Joined
28 Oct 2013
Messages
779
Location
Leyland Lancs
1M16 (yes, last nights) is reported back at Inverness after spending the night at Slochd - passengers forward on the 09xx Inverness-Edinburgh. Having waved at the tram and other early southbounds going flying past.
What a complete Grade A farce. Again.

See this new thread :Caledonian Sleeper 30 July, in UK Railway Discussions, interesting read x
 
Last edited:

GM228

Member
Joined
9 Feb 2015
Messages
154
One thing I've noticed lately is there seems to be a fairly large amount of failures of one degree or another with the Caledonians since Serco have taken over, what I'm curious of is it just a case of noticing it more as GBRf, Serco, the 92s etc are being watched more at the moment or is it due to the 92s finding their feet etc?

I'm also curious of the recent failure of the 66 (with 67 for ETS)-could the 67 have taken over or would the rake have been too much for it to handle?

Has the failure rate actually increased or again is it just because we are taken more notice?

GM228
 

Bungle965

Established Member
Associate Staff
Buses & Coaches
Joined
2 Jul 2014
Messages
3,373
Location
Calder Valley
Allot of the 92 have been in stores for the last years so are not going to be at the best there is also something about them have channel tunnel wiring in them to make them less prone to brake down in the tunnel, but that has a adverse effect while on the main line in England and Scotland making them harder to fix if they trip out lets say on a neutral section. In regards to the 66 it ran out of coolant so had to be stopped at Milton Keynes Central, reasoning why the 67 did not just carry on is I think because it had already lost its path and trying to negotiate getting into euston+ the ecs would be to difficult so it is better to just cape the train there. My opinion on the 92 is that they should be given time to settle in and with the required modifications to the electrical wiring they should be as good as the 90.
Sam.
 

hibtastic

Member
Joined
19 Oct 2014
Messages
288
Allot of the 92 have been in stores for the last years so are not going to be at the best there is also something about them have channel tunnel wiring in them to make them less prone to brake down in the tunnel, but that has a adverse effect while on the main line in England and Scotland making them harder to fix if they trip out lets say on a neutral section. In regards to the 66 it ran out of coolant so had to be stopped at Milton Keynes Central, reasoning why the 67 did not just carry on is I think because it had already lost its path and trying to negotiate getting into euston+ the ecs would be to difficult so it is better to just cape the train there. My opinion on the 92 is that they should be given time to settle in and with the required modifications to the electrical wiring they should be as good as the 90.
Sam.

I thought the 92s have started to settle down a bit now anyway.
 

Bungle965

Established Member
Associate Staff
Buses & Coaches
Joined
2 Jul 2014
Messages
3,373
Location
Calder Valley
Modifications to make them as good as a older locomotive? When I first popped my head above the parapet to tell people that 92s are inherently unreliable, everyone scoffed...

The 92s were meant to work in the tunnels on freight and passenger sleeper services but the sleeper service never materialized and there was not enough freight work for the whole class so they just sat in store, with not enough work for them. Gb railfright and Serco properly saw the potential in them but did not realize that they would need so much work needed to make them more reliable.
Things can only get better
Sam
 

sprinterguy

Veteran Member
Joined
4 Mar 2010
Messages
11,562
Location
Macclesfield
When are the 73s due for the north of Edinburgh services?
Mid-October if the conversion/overhaul programme is still on schedule.
--- old post above --- --- new post below ---
Allot of the 92 have been in stores for the last years so are not going to be at the best there is also something about them have channel tunnel wiring in them to make them less prone to brake down in the tunnel, but that has a adverse effect while on the main line in England and Scotland making them harder to fix if they trip out lets say on a neutral section.
More specifically, a piece of electrical equipment that detects stray electrical currents was being tripped when the locos were travelling through neutral sections on the WCML (I'm not sure why this hasn't been identified as an issue in their years of freight use?), as the equipment treats the neutral section as an interface issue between the overhead wire and the loco. The levels at which this equipment had been set were higher than necessary for the national network in order to allow operation through the Channel Tunnel, and have now been relaxed.
 

PHILIPE

Veteran Member
Joined
14 Nov 2011
Messages
13,472
Location
Caerphilly
Serco, new operator, going for 92s instead of proven 90s and 73/9s, a completely unknown and untried commodity, instead of retaining use of 67s already proven to be reliable apart from the odd blip.
 

Observer

Member
Joined
3 Nov 2014
Messages
798
Serco, new operator, going for 92s instead of proven 90s and 73/9s, a completely unknown and untried commodity, instead of retaining use of 67s already proven to be reliable apart from the odd blip.
It's what GBRf could only offer.

Obviously DBS had the upper hand in locomotives suitable for sleeper operation and at least they've been willing to offer 90s and 67s for the time being.

If DRS were operating it as an example, they would have had to have hired in 90s from somewhere as they don't own anything electric until the 88s arrive.
 

GM228

Member
Joined
9 Feb 2015
Messages
154
Mid-October if the conversion/overhaul programme is still on schedule.
--- old post above --- --- new post below ---

More specifically, a piece of electrical equipment that detects stray electrical currents was being tripped when the locos were travelling through neutral sections on the WCML (I'm not sure why this hasn't been identified as an issue in their years of freight use?), as the equipment treats the neutral section as an interface issue between the overhead wire and the loco. The levels at which this equipment had been set were higher than necessary for the national network in order to allow operation through the Channel Tunnel, and have now been relaxed.

So do the regular tunnel 92s still have this or have all 92s been relaxed? The reason I ask is because GBRf seem to be rotating all their 92s on the Caledonians and if it's only the dedicated fleet to be modified then their will be a failure risk each time they used any other 92?

Are Caledonian 92s still able to operate through the Tunnel if required not that that's likely to happen?
 

CosherB

Established Member
Joined
23 Feb 2007
Messages
3,041
Location
Northwich
Serco, new operator, going for 92s instead of proven 90s and 73/9s, a completely unknown and untried commodity, instead of retaining use of 67s already proven to be reliable apart from the odd blip.

Point the finger at Scot Rail - they chose Serco / GBRf to operate the franchise. No doubt they undercut the others tenderers on cost, including the option where DBS would continue to provide 90's and 67's.

DBS were probably having to consider running 92's eventually due to the increased ETS required to run the new CAF stock coming online in a few years, or create a microfleet of 'Super ETS' 90's.

I'm sure GBRf will get it sorted eventually (both the 92's and 73's), although the 92's will need more TLC to keep them 'reliable'. Frankly, they'll have to sort it as hiring in 90's and 67's from DBS will no doubt be financially prohibative.
 
Status
Not open for further replies.

Top