Isn't the box at Halifax listed?
Basically the lines that pass through Huddersfield will once again be treated to the nightmare that was the 12th and 13th August with rail replacements everywhere. Halifax seems to keep its rail services as I would have thought that it would have lost them through this resignalling work.
Probably worth mentioning that Huddersfield box is going as well.
There's two different sets of blockades.
Huddersfield PSB is being recontrolled to York ROC, when this work is ongoing its area of control is subject to closure, the boundary is somewhere around Greetland Junction. That means that Huddersfield doesn't control any of the Calder Valley route, and vice versa, so that if one is closed the other can remain open.
The second project is a resignalling, which is going to see closure of Bradford Mill Lane, Halifax, Milner Royd and Hebden Bridge boxes. This involves new signals and some slight track alterations. It will mean that this new 'Halifax panel' will border
Manchester ROC Preston PSB and York IECC.
Healey Mills I believe is a recontrol which will be added to the Huddersfield panel at York ROC.
What I'm not sure of is what, if anything, is happening with Batley box.