SuperLuke2334
Established Member
Still the 15 sets. As sd0733 mentioned above, at somepoint this month there should be a batch of units accepted which will improve matters. With running through to Cardiff, I expect that the fleet is very tightly stretched.Are there still only 15 of the 2 carriages accepted into passenger service? No sign of any 3 cars yet?
If they have all of the North Wales-Manchester, Liverpool, Conwy Valley, Crewe-Chester plus now 3 on Cardiff-Holyhead that doesnt leave a lot of capacity for double sets running on the North Wales Coast.
3 cars still a while due to ongoing issues. I'm not sure but hoping that some are in the batch to be accepted this month.
