Despite engineering work meaning trains to Upminster were only half hourly last night (with passengers for stations to Basildon changing to bus at Upminster) and West Ham playing at home, trains were only 4 coaches.
The 22.55 came into Barking with many already standing and the platform packed. It waited five minutes while people tried to squeeze in but many were left on the platform to wait another 30 minutes. The 23.25 was also very full put I think everyone got on this time.
Surely C2C could have run 8 coach trains.
The 22.55 came into Barking with many already standing and the platform packed. It waited five minutes while people tried to squeeze in but many were left on the platform to wait another 30 minutes. The 23.25 was also very full put I think everyone got on this time.
Surely C2C could have run 8 coach trains.