Apologies if this has been covered before on here, but I couldn't find anything obvious when searching.
Having looked at this, I can see a number of benefits if both curves were re-instated and at least the southern curve electrified. (If the new Merseyrail stock is dual voltage, then this would be on an overhead basis).
The obvious benefits are:
1. Through services from Preston to Southport;
2. Additional services to Southport from Liverpool;
3. Easier travel from Ormskirk to Southport;
4. Only Merseyrail to serve New Lane, Bescar Lane and Meols Cop therefore speeding up Southport - Manchester services;
5. Easier connections from Southport and Ormskirk lines to the North via Preston.
The current line from Rufford to Burscough Junction could be removed and re-used between from where the curves diverge to go to Burscough Bridge and the bridge removed, aiding electrication from Manchester.
While the journey time between Preston and Southport is likely to be longer than Preston - Ormskirk, if this were to be electrified as well, then an hourly service could be possble using one EMU or half-hourly using 2.
The Ormskirk line beyond Ormskirk would probably not justify a service greater than half-hourly, which would probably mean that you would only need two additional EMUs for this service.
Thoughts?
Having looked at this, I can see a number of benefits if both curves were re-instated and at least the southern curve electrified. (If the new Merseyrail stock is dual voltage, then this would be on an overhead basis).
The obvious benefits are:
1. Through services from Preston to Southport;
2. Additional services to Southport from Liverpool;
3. Easier travel from Ormskirk to Southport;
4. Only Merseyrail to serve New Lane, Bescar Lane and Meols Cop therefore speeding up Southport - Manchester services;
5. Easier connections from Southport and Ormskirk lines to the North via Preston.
The current line from Rufford to Burscough Junction could be removed and re-used between from where the curves diverge to go to Burscough Bridge and the bridge removed, aiding electrication from Manchester.
While the journey time between Preston and Southport is likely to be longer than Preston - Ormskirk, if this were to be electrified as well, then an hourly service could be possble using one EMU or half-hourly using 2.
The Ormskirk line beyond Ormskirk would probably not justify a service greater than half-hourly, which would probably mean that you would only need two additional EMUs for this service.
Thoughts?