ASharpe
Member
Someone didn't at Enfield Town![]()
Careful on discussing that here, I think it is still before the courts.
Someone didn't at Enfield Town![]()
Certainly should do, surely.
Yes but that's not because there is a red signal ahead, that's because I'm immobilising the cab and leaving it.Do you set the DRA at a buffer ? If it doesn't have a red light on it do you still set it ?
Cheers in advance.
However, I have spoken with other TOC Drivers and they don't set the DRA at buffers.
. So the next driver who accesses the cab will find the DRA not set.
Connected to the signaling system.Are the associated TPWS grids connected to the signaling system, or are they, too, just permament fixtures set to a single state?
I set the DRA at a buffer simply because there will be no further movement from that end and it's part of my process for securing the cab.Do you set the DRA at a buffer ? If it doesn't have a red light on it do you still set it ?
Cheers in advance.
Interesting as our TOC is the opposite. You are required to set the DRA when leaving a cab (and on entering, if you discover it is not set). You have to then check the signal before you turn the DRA off.I believe the theory behind it is that the new Driver sets the DRA to remind them of the signal.
To be quite honest it never crossed my mind to consider reporting it to the signaller. Maybe next time I'm bored and arrive into platform 1 I'll report it and see how the signaller reacts...I've been stopped and cautioned once for a buffer stop which had its red light out. To be honest I think it's a bit stupid and unnecessary. Drivers know where the stops are.
All buffer stop TPWS installations are part of the signalling system. Normally they will be energised continuously. These systems are also normally proved, but how this is done may vary.Are the associated TPWS grids connected to the signaling system, or are they, too, just permament fixtures set to a single state?
Normally they will be energised continuously. These systems are also normally proved, but how this is done may vary.
If there was a failure? In which case an alarm that the OSS was no longer protecting the stops would be quite a handy thing for signallers and drivers to be made aware of.When would a buffer stop TPWS not be energised ? I thought they were standard OSS set to "10" mph
Cheers in advance.
*OSS - Over Speed Sensor
If there was a failure?
TPWS systems are classed as safety systems, but are not classed as fail safe systems. So there is always the possibility that a system may fail.When would a buffer stop TPWS not be energised ?
The standard design is to arrange for the proving system to be included in the interlocking requirements of any signal reading up to the buffer stops. However, how and if this is indicated to the signal varies.
I was just being lazy in the amount of detail I went into as we are veering off the point of the original post somewhat, although with anything signalling there's almost always an exception somewhere (although I don't know where in this case) so probably shouldn't have been so broad.Totally understand that but @Annetts key said 'normally' and @alxndr says they are connected to the 'signalling system' so I'm kinda curious if there are different kinds of TPWS installations at buffers or indeed if there are various and odd exceptions to what I understand as being the norm.
To the signaller, yes. Depending on the age of the installation it might appear as the same as a lamp out when the signal is at danger, or might be its own indication. In older installations it was deemed too intrusive/risky to add additional indications to the panel so the TPWS proving was cut into the lamp proving circuits.If there was a TPWS failure; buffers or otherwise, would there be an alarm ? As a Driver I wouldn't know if TPWS was working or not unless I had a spurious activation (which does happen)
Usually the one for the buffers will be associated with the buffers and not the signal.Does this mean that a signal sending you into a terminal platform/Buffer would potentially have two TPWS grids associated with it ? (one before the Signal and the one for the buffers)
Yes. It’s possible that there could actually be more.Does this mean that a signal sending you into a terminal platform/Buffer would potentially have two TPWS grids associated with it ? (one before the Signal and the one for the buffers)
I’ve got Edinburgh Waverley in my remit, which as you can imagine has a lot of buffer lights, and I’ve never ever maintained one. They are definitely under the remit of E&P (as they are “high voltage” by the letter of the law) and are ran to failure (ie Not maintained).I've never maintained one, although I can't say that there won't be somewhere in the country where they fall under S&T. I know for certain that the white light above the buffer stops at the end of the turnback sidings at Bedwyn are 240V and therefore fall under the remit of the Distribution and Plant department.