• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Buffer stop lights

Status
Not open for further replies.

Railsigns

Established Member
Joined
15 Feb 2010
Messages
2,754
I wonder if anyone can help me to pin down a few dates. During the 1980s, it was practice for electric buffer stop lights to comprise two lights on the left and one on the right as shown in the example below, but when did this originate? I'm guessing around mid-1970s.

bstop1.jpg


At some point in time, it was decided to dispense with the right-hand light, as shown below. Again, does anyone have an idea of the date that this change occurred (1990s?)?

bstop2.jpg


Finally, when was the red and white reflectorised marker plate (as seen in the first photo) first fitted to buffer stops? It's mentioned in a standard dated 1996, but might it have been introduced a few years earlier?

Thanks for any information.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Peter Mugridge

Veteran Member
Joined
8 Apr 2010
Messages
17,842
Location
Epsom
I can't answer the question I'm afraid, but I am wondering if that top picture is the one at Chester that got demolished by a Voyager last year?
 

185143

Established Member
Joined
3 Mar 2013
Messages
5,361
Peter Mugridge:2031502 said:
I can't answer the question I'm afraid, but I am wondering if that top picture is the one at Chester that got demolished by a Voyager last year?
Definitely isn't Chester.
 

Railsigns

Established Member
Joined
15 Feb 2010
Messages
2,754
I can't answer the question I'm afraid, but I am wondering if that top picture is the one at Chester that got demolished by a Voyager last year?

It's Largs (where a buffer stop, and the station building behind it, got demolished by a 318 in 1995).
 

Aictos

Established Member
Joined
28 Apr 2009
Messages
10,403
When Hertford North got resignalled last year, Network Rail removed the existing plate attached to buffers in Platform 3 (bay platform), a example is supplied as seen in your photo and simply painted the buffers white, not sure if this is a new standard though?
 

Railsigns

Established Member
Joined
15 Feb 2010
Messages
2,754
When Hertford North got resignalled last year, Network Rail removed the existing plate attached to buffers in Platform 3 (bay platform), a example is supplied as seen in your photo and simply painted the buffers white. Not sure if this is a new standard though?

Strange. The red and white board is definitely still standard as it's mentioned in Railway Group Standards GK/RT0057 and GK/RT0058, which don't come into force until March 2015.
 

Aictos

Established Member
Joined
28 Apr 2009
Messages
10,403
Strange. The red and white board is definitely still standard as it's mentioned in Railway Group Standards GK/RT0057 and GK/RT0058, which don't come into force until March 2015.

Very strange, I think the buffers in the yard are done like that too.
 
Status
Not open for further replies.

Top