Arrived off the service from Binche into Brussels Midi this morning at about 10:35 to find that there was a complete meltdown as smoke/fire had been detected.

Nothing really moving or going anywhere, but my train to Lokeren was still advertised so I went and sat down on it. To my surprise, we departed 8 minutes behind schedule and went via Brussels-West and rejoined the intended route south of Jette. At present we're down to a mere 4 minutes late. (Long dwell at Dendermonde should cancel that out too)

Conductor didn't know much more than us, but said that 'decisions have to be made very quickly' when I remarked that we seemed to be underway faster than expected. Considering the scale of the disruption, I was impressed nonetheless!

I'm not sure what other services can take the diversion via Brussels-West and Simonis, and most passengers on the concourse just looked bewildered. One passenger was noted screaming and kicking the side of a cancelled train- clearly everything was a bit much for him :lol:

I was just wondering (maybe not this second, as it's a fresh ongoing disruption) whether anyone more au-fait with the Belgian system had any further details on how this has occurred?

My one gripe was the lack of staff and information. The only staff member I encountered was my own conductor telling passengers we were diverting, and information on the ground was essentially "there's problems" rather than any sort of advice on what to do (make your own way to Brussels Nord, etc).
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

snookertam

Member
Joined
22 Sep 2018
Messages
932
Interesting that during disruption there the staff on the ground weren't kept completely updated. I think that's probably just a practical issue with things happening so quickly, but it's also one of the main criticisms of the service here.

Wonder how the passenger who was screaming would cope with ScotRail?
 
Joined
9 Apr 2016
Messages
1,909
Unfortunately we seem to have the same problem here in the UK of very little information being available to passengers during disruption.
 

Segedunum

Established Member
Associate Staff
International Transport
Joined
22 Dec 2013
Messages
4,760
Location
Up North
Does anyone know how serious the problem is?

From what I've been able to gather (I've escaped to Antwerp for the afternoon to keep well away from disruptions) at least two of the six tracks are now open. At least it's not a weekday so come 4pm you won't have P trains coming out of Schaerbeek every three minutes.

I assume two tracks means the likes of NS International and IC will be kept running.
 

AlexNL

Established Member
Joined
19 Dec 2014
Messages
1,721
Was just wondering if there was any long term damage as I have a trip to the area at the end of next month!
It was a small lineside fire, according to SNCB normal operation has resumed.
 

MarcVD

Established Member
Joined
23 Aug 2016
Messages
1,247
Fortunately Infrabel decided, some time ago, that the 6 tracks tunnel between Brussels North ans South should be divided into 3 sealed tunnels, so that a serious disruption (fire, trespassing) in one of the 3 leaves the two others available to traffic. So once the source was localized, 4 tracks immediately went back in service.
 