davetheguard
Established Member
- Joined
- 10 Apr 2013
- Messages
- 1,939
There's a lot of work being done in this part of the West Midlands, namely:
Building of a new larger Bromsgrove station on a new site;
New dynamic passing loop at Alvechurch on the single track Redditch branch to allow an enhanced timetable;
Cross City Line electrification extended from Barnt Green to Bromsgrove.
I know that the first two (at least) are under construction, but I'm hoping someone can provide an update, as the only applicable threads seem to be old and closed. How advanced is construction (any photos would be welcome), and what are the expected completion dates? Has physical work (rather than planning work) on the extension of electrification started yet?
Thanks in advance for any news.
Building of a new larger Bromsgrove station on a new site;
New dynamic passing loop at Alvechurch on the single track Redditch branch to allow an enhanced timetable;
Cross City Line electrification extended from Barnt Green to Bromsgrove.
I know that the first two (at least) are under construction, but I'm hoping someone can provide an update, as the only applicable threads seem to be old and closed. How advanced is construction (any photos would be welcome), and what are the expected completion dates? Has physical work (rather than planning work) on the extension of electrification started yet?
Thanks in advance for any news.