Broken Level Crossings

Status
Not open for further replies.

Sunset route

Established Member
Joined
27 Oct 2015
Messages
1,223
Something I've often wondered. Is there a minimum time that a level crossing must be kept open to road traffic once the barriers have been raised?

One of our MCB-OD crossings has a MROT of 20 seconds from fully raised until the sequence starts again that I know off and I’m not sure about the second one that we look after.

MCB-OD, Man controlled barriers - obstacles detection

MROT, minimum road open time
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,227
The crossing that began this thread is one of about 15 in almost 12 miles between Berwick and Alnmouth, some very quiet, others like the one at Beal for Holy Island very busy.

This is the telephone at Liitle Mill. This stretch of line must be a nightmare to control, especially with extra services now being added.
Interesting that the signage is basically duplicated.

Isn‘t that a problem with some level crossings, that there’s sometimes too much signage saying the same thing?
 

Gloster

Veteran Member
Joined
4 Sep 2020
Messages
12,940
Location
Up the creek
Interesting that the signage is basically duplicated.

Isn‘t that a problem with some level crossings, that there’s sometimes too much signage saying the same thing?
This seems to be a never ending problem: having all the necessary signage in places where it can be seen from all angles of approach versus having too much signage for the approaching motorist to take in. I doubt if there will ever be an entirely satisfactory compromise.
 

6Gman

Established Member
Joined
1 May 2012
Messages
9,185
Not always easy to answer that. It depends on the particular signaller/crossing keeper on duty at the location that supervises the crossing. However, in my experience, with so many trains a three minute separation would probably not be sufficient to raise the barriers. Management always wield the big stick of performance at signallers for delaying trains. The crossing sequence will require about 20-30 seconds to lower, and after a train about 10-15 seconds to raise. A train will travel a considerable distance in that time, and the driver would be expecting to see proceed aspects, unless of course they are closely following another service. A motorist sat waiting may lose perception of time when they see one train pass and another is already approaching. I've had people complain to me they've been sat waiting for "20 minutes" whilst two train pass the crossing, when in reality it's probably been no more than about 2-3 minutes. The speed of a train will also have an effect on things.
I would also be concerned that opening for brief periods between trains could increase the risk of vehicles stationary on the crossing. (We have an AHB here where queueing traffic can occur beyond as well as before the crossing and it worries me every time we use it.)

AHB - Automatic Half Barrier

(I realise this is a different matter to operator controlled crossings)
 

norbitonflyer

Established Member
Joined
24 Mar 2020
Messages
5,660
Location
SW London
The crossing that began this thread is one of about 15 in almost 12 miles between Berwick and Alnmouth, some very quiet, others like the one at Beal for Holy Island very busy.

This is the telephone at Liitle Mill. This stretch of line must be a nightmare to control, especially with extra services now being added.
And as has been mentioned on another thread, some parts of the country are isolated from the rest by a level crossing, so thgere is no possibility of a go-around. Holy Island is one such - and people naturally get antsy if they are delayed on their way to the Island when the tide is coming in.
 

ricoblade

Member
Joined
28 Sep 2015
Messages
539
I was at an ECML crossing recently waiting 25 minutes with the barriers down, as 7 trains went over at 2-4 minute intervals. So a 10 minute ‘call in’ rule isn’t going to work there.
My record is 6 at Botany Bay crossing, north of Retford, and about a 15=20 minute wait. It's always a gamble whether to risk that (more direct) road as a 2-3 train wait is common.
 

GB

Established Member
Joined
16 Nov 2008
Messages
6,549
Location
Somewhere
I would also be concerned that opening for brief periods between trains could increase the risk of vehicles stationary on the crossing. (We have an AHB here where queueing traffic can occur beyond as well as before the crossing and it worries me every time we use it.)

AHB - Automatic Half Barrier

(I realise this is a different matter to operator controlled crossings)

AHBs have a minimum road open time of 10 seconds.
 