thetangoman
Member
Just read on the EastCoast website that there are a few delays caused by a broken down train between Darlington & York. Does ayone know what train caused this?
Cheers
Russell
Cheers
Russell
I think we are starting to get to the stage where we need more thunderbirds positioned around the country to be honest. It takes far too long to rescue a stranded train. I am aware that we don't have as many depots anymore and this is going to be a problem i just honestly think we should look at ways of speeding up recovery time.
How about measures are put in place to reduce the failures such as fix them
6Z21 is operated by DCR using a class 56 for traction.IIRC that freight train is normally a Class 60, which probably explains a lot.
GA Have decided not to have thunderbird cover at Colchester any more ???
In the old days...the station pilot would've been commandeered to recover the train to the station, or the nearest available loco would be utilised. However with this fragmented system we have the situation has changed. I know a couple of times where a freight loco has been allowed to recover a failed passenger service, but 'head in the sand' mode from the TOC is commonly more the norm. In some cases it may just be that the next passenger service in the same direction will be the train that recovers a failure (usually more common on local, less well used routes.That's because our trains never break down anymore. Oh hang on...
...Let's not mention 90001 on the 07.00 Nrw-Lst this morning & the ensuing chaos& that was within spitting distance of Crown Point. Not helped by signalling probs I will add.