Waiting for air pressure to build up. Split air pipe was the issue which I assume is related to the brakes, I'm not super well-versed in that technical side.Once a rescue train arrived to couple up, that also had difficulties so now it has to wait for a fitter.
The rescue train has broken down as well?A rather bizarre evening, I was stuck on 2H42 (two trains behind the failure) for over four hours.
It seemed the first priority was to rescue the passengers stranded on 1B88 - the defective train - via a cross-transfer, rather than prioritise the vast majority of affected passengers across the rest of the network. That cross-transfer took some time.
Once a rescue train arrived to couple up, that also had difficulties so now it has to wait for a fitter.
As I type, the defective train is still there…
Waiting for air pressure to build up. Split air pipe was the issue which I assume is related to the brakes, I'm not super well-versed in that technical side.
Compare and contrast with SWR who i frequently use and taxi authorisation is usually issued as soon as there is a major issue.
Telling people to make their own arrangements then dodging the specific question about reimbursement was shameful by GA tonight
Services are currently severely disrupted and customer are advised to not travel and make your own arrangements back home. You can contact our customer services online to see if they can reimburse you for a taxi but this is by a case by case basis.
Precisely what I was hinting at in my last post.There's just been a ridiculous response to a customer on X where GA have replied to a customer telling them that if they want to know if they will get reimbursed they need to fill in the contact form basically. It should be something that could be answered there and then. I would guess the answer would be no but they don't want to say that and they don't want to say yes either, so you have these ridicolous amigibious answers that show absolutely no care in the world about people.
Someone’s in for a very very slow journey back to Crown Point tonight.Unable to maintain air pressure, train is going to be rescued as a swinger (unbraked) from what I’ve last heard, obviously this is absolutely last resort
Someone’s in for a very very slow journey back to Crown Point tonight.
Serious stewards enquiry needed
In my personal experience, the reliability of the WAML has fallen off a cliff since nationalisation. Pre-nationalisation, I've had dozens of journeys, at most 2 minutes late. Post nationalisation, at least 10% of my journeys have been delayed over an hour.
Also I see they just updated Journeycheck at 23:04 (previous update was at 21:08), the only thing that changed is the last updated time, literally nothing else has changed.
I've just checked my records, and out of my 23 journeys post nationalisation, I've had delays of: 176. 60, 26, and 8 minutes.These seem like odd comments and about 30 years old. The second one seems like some serious rose-tinted glasses! 10% of your journeys taking longer than 1 hour?? That would make you deeply deeply, unlucky.
I've just checked my records, and out of my 23 journeys post nationalisation, I've had delays of: 176. 60, 26, and 8 minutes.
In the year pre-nationalisation, I reckon I made about 2 dozen journeys (I can't be bothered to go through my bank statements month by month), and 2 minutes was genuinely my largest delay.
The update has been saying that the 'fleet technicians are now coupling up a rescue train to move the train off of the line.' for many hours now, it has clearly moved on from that, as some people in this thread have said a while ago and an update should be given about that but it isn't. People don't expect to be given chapter and verse, but if you give people even an update to say that it's taking longer than normal and there were complications (it doesn't need to be technical) they at least are going to feel like the organisation cares a bit more.These seem like odd comments and about 30 years old. The second one seems like some serious rose-tinted glasses! 10% of your journeys taking longer than 1 hour?? That would make you deeply deeply, unlucky.
If the line is blocked, the line is blocked. You could argue it's longer than usual to recover a train but it also sounds like an unusual failure.
== Doublepost prevention - post automatically merged: ==
Sometimes there is nothing to update if the circumstances remain identical. But there is mandate to keep it ticking over.
It's being hauled by a locomotive AIUI, so it would be able to be driven to Crown Point once the brakes work.Unless it is hauled by a bi-mode it won’t be getting back to Crown Point until Monday as the line between Ipswich and Norwich is closed this weekend for engineering works. it does seem that the Stadlers are much more unreliable on the Stansted’s than they are on the GEML or the branches, I wonder what the actual stats are?
Turns out the freight train at Bury/Chippenham Jcn isn’t really broken downMore fun this morning.
Points failure caused a number of cancellations on Stansted services coupled with several more due to train crew shortages probably as a result of yesterday.
Meanwhile a broken down freight train is causing disruption at bury.