from http://www.nwrail.org.uk/nwnews.htm



Pont Briwet (Briwet Bridge), across the Afon Dwyryd, on the Cambrian Coast line between Penrhyndeudraeth and Llandecwyn stations, is an original Cambrian Railways wooden structure, with a carriageway for light vehicles, drivers of which must pay privately-collected toll (40p for cars) to cross, alongside the railway, and avoid a eight-mile detour via Maentwrog for travellers between the Harlech and Porthmadog areas.

The local press is reporting that a replacement bridge, suitable for heavier traffic, is to be constructed. Work on the new crossing will, we are told, start in autumn 2011 [or 2012 in other reports]. The joint project between Network Rail, Gwynedd Council, Snowdonia National Park and Countryside Council for Wales will, it is said, take two years to complete.



In one press article, it Gwynedd Council’s transport engineer Dafydd Wyn Williams was reported as saying: 'During the building, the road will have to be closed to vehicles for 12-18 months and the rail service replaced with a bus service from Harlech for around a week. The old bridge will be kept as a footpath.' However. some confusion seems to have arisen, as the same Mr Williams is quoted the following day as saying 'To set the record straight, provisions for pedestrians will be included in the new bridge. It is proposed that the new bridge will follow the line of the old bridge and listed building consent will now be sought to demolish the existing structure.'

So it seems that the granting of permission to demolish the bridge, listed Grade II as a structure of historic importance, is being taken for granted., even though it has apparently yet to be designed. Presumably Gwynedd Council will apply to Gwynedd Council to grant permission to demolish it. Also strange is the statement that the road will be closed for 12-18 months but the railway for only 'around a week.' The new bridge will no doubt be welcomed by many, although from the point of view of the railway it is likely to lead to diversion of some passenger traffic away from the trains when buses can make the shorter crossing. At least (let us hope) Barmouth Bridge is too long to replace.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Greenback

Emeritus Moderator
Joined
9 Aug 2009
Messages
15,268
Location
Llanelli
I hope that this idea does not go ahead. How they can spend money on this sort of thing when all sorts of other services are being cut is beyond me!

Only last year, when we were in Talsarnau, was a lot of work being undertaken on the bridge. It was closed to road traffic every night from 9, reopening at around 7 in the morning. If the old bridge is going to be demolished, what was the point of spending that money?

Any new bridge would have a big impact on jounreys by train. Currently, it's much quicker and easier to get the train from Harlech to Porthmadog compared to the bus, which involves a change and a wait at Oakley Arms. Watch Arriva run buses over the enw bridge, taking money away from itself as pensioners desert the railway in droves for a free journey!
 

merlodlliw

Established Member
Joined
8 Mar 2009
Messages
5,852
Location
Wrexham/ Denbighshire /Flintshire triangle
I hope that this idea does not go ahead. How they can spend money on this sort of thing when all sorts of other services are being cut is beyond me!

Only last year, when we were in Talsarnau, was a lot of work being undertaken on the bridge. It was closed to road traffic every night from 9, reopening at around 7 in the morning. If the old bridge is going to be demolished, what was the point of spending that money?

Any new bridge would have a big impact on jounreys by train. Currently, it's much quicker and easier to get the train from Harlech to Porthmadog compared to the bus, which involves a change and a wait at Oakley Arms. Watch Arriva run buses over the enw bridge, taking money away from itself as pensioners desert the railway in droves for a free journey!

Like a lot of workings in Wales with listed buildings, they will have to involve
CADW, that alone will delay the plan,if it ever gets off the ground.
I like your Arriva pun,we have similar here, free bus to Chester Station every 12 minutes from Wrexham, one train an hour and pay.
 
Status