InterCity:125
Member
is the plan to re-open Brunels old platforms as a terminus for London trains still around?

View attachment 50577

Ahr.co.uk said:TEMPLE MEADS REGENERATION
![]()
![]()
- AHR HAS WORKED WITH NETWORK RAIL FOR SEVERAL YEARS AT BRISTOL TEMPLE MEADS PRODUCING CONCEPTS AND GRIP STAGE 2 MASTERPLANNING FOR THE REGENERATION OF THE STATION. CONCEPTS PROVIDED A SERIES OF IDEAS TO ENABLE THE STATION TO BECOME A WORLD CLASS GATEWAY TO THE CITY AND ITS CENTRE.
![]()
![]()
- Our initial work included enhanced passenger facilities and retail uses within and around the Grade 1 Listed Digby Wyatt Shed, alongside reducing station congestion and enhancing the operational performance. The study options ranged between zero costs to upwards of £30m.
Commercial opportunities were identified and the study addressed opening up pedestrian links across the rail corridor and improving the transport interchange facilities at the station.
Consultation with adjacent land owners, English Heritage and the

View attachment 50577

Last edited: