The X1 runs via Bower Ashton and Long Ashton. The X2 is the one that stays on the main road.I think there is just enough capacity for 34 bph, well this was the frequency mentioned in the metrobus documents. 20bph (m2) 10bph (A1) and 4bph (X1)
The X1 runs via Bower Ashton and Long Ashton. The X2 is the one that stays on the main road.I think there is just enough capacity for 34 bph, well this was the frequency mentioned in the metrobus documents. 20bph (m2) 10bph (A1) and 4bph (X1)
Back at the time it was the X1!The X1 runs via Bower Ashton and Long Ashton. The X2 is the one that stays on the main road.
It's going to become the C3 when the Congresbury local scheme gets launched in November.Back at the time it was the X1!
Oh no not more renumbering !!!!!!!!!It's going to become the C3 when the Congresbury local scheme gets launched in November.
They have been for a couple of months now, since changes at the end of May.The 78/79 are the Ts 1&2 now.
It's going to become the C3 when the Congresbury local scheme gets launched in November.
It took 30 when I tried it!go between the City Centre & UWE in under 20 minutes.
The buses are the new model of enviro 500, you can still see the old model operating the x services and the 50.On a more positive note, the buses themselves seem very well built. I’m no fan of ADL products but there were no squeaky and rattling panels (like on every other bus I’ve ever been on, aside from the “Borismasters” in London), and despite the hot weather they were very cool; normally the top deck especially is unbearable during hot weather. It seems to have some kind of air cooling/conditioning system, but I’m not sure why they have openable windows as that means such systems don’t actually work as effectively as they should. A significant amount of water was pouring out of the outlet at the side of the bus at the top of the stairs where there was some kind of cooling equipment.
They're actually the Enviro 400 MMC bodywork - the Enviro 500 isn't sold over here any more, only in Asia and North America. The Enviro 400 MMC is for two axles, whilst the Enviro 500 is for three.The buses are the new model of enviro 500, you can still see the old model operating the x services and the 50.
I stand correctedThey're actually the Enviro 400 MMC bodywork - the Enviro 500 isn't sold over here any more, only in Asia and North America. The Enviro 400 MMC is for two axles, whilst the Enviro 500 is for three.
Same applies to Great Meadow N/W bound. Have all the stops on the m2 been done yet?Harry Stoke northbound doesn't even yet have a shelter. Or flag. Or timetable. Or filled-in-hole-in-the-ground.
OK, they have unitl January, but you would've thought that with the T1 going that way something would have been done by now. The orange barriers haven't moved since the T1 started in May!
They are E400s with a Scania chasis. These were chosen as apparently the guide wheels can't be attached to the regular E400MMCs. They are also lower height, which is quite evident when upstairs to fit under the old Ashton swingbridge. The A1 E400s are the same, albeit fitted out to a different internal specification and minus the centre door.The buses are the new model of enviro 500, you can still see the old model operating the x services and the 50.
Yes it has had it since it was accessable. It's not really a surprise considering its location and lack of surveillanceDriving pass I noticed the metrobus flyover in Ashton gate already has graffiti on it.
See my comment #130They are E400s with a Scania chasis. These were chosen as apparently the guide wheels can't be attached to the regular E400MMCs. They are also lower height, which is quite evident when upstairs to fit under the old Ashton swingbridge. The A1 E400s are the same, albeit fitted out to a different internal specification and minus the centre door.

I know, I was adding that they have a Scania chasis, and low height bodywork unlike the regular E400MMC and the justification for this.See my comment #130![]()
Had a ride on Bristol newest roller coaster today. The positive thing is that it's open, the new infrastructure is all there and working and it's going to be free to use on Saturdays 22nd and 29th September.
However!
I used it purely as a replacement for the Long Ashton Park and Ride and, even in the middle of the day, it's a poor replacement. Despite having limited bus priority the 903 did a reasonable job of getting from Long Ashton to Bristol and back again quickly. It also encouraged group travel (the usual issue with cars) by having two children free. Metrobus takes longer and (for anybody with children) is more expensive.
The original plans for the link has been changed a few times and originally it would have used a different approach to Bristol which would have been quicker (and would have needed more guided sections). Now it runs along unprioritised roads for a lot of the time and (today) got caught up in the Temple Meads traffic both ways. Eventually this will improve (hopefully!) but not in the short term. Even without this it's slow as, instead of a direct park and ride, it's a local bus service.
The new bridge sections are great to ride across however the guided sections slow the service down (this isn't a shakedown issue where the drivers will be able to go faster as they get used to it, the guided sections are all short and few appear to offer any better acceleration opportunities than are already being used, however every one needs the additional slowing to engage/disengage with some needing it mid section as well because of footpaths!) and the majority appear unnecessary. I'd go so far as to say they'll all unnecessary if the footpath over the Ashton bridge was restricted to pedestrians (i.e. build a seperate bridge here then make the whole thing unguided).
I'd been hoping to be able to report a more positive experiance (as the m3 was and still is).
I assume they still do in Brislington or Avonmouth which are now cheaper for a family, and for anybody off peak.The reason for the new fares being £4 return (Bristol Day Ticket) rather than £3 return on the 903 is because it is no longer subsidised by the council and being run 100% commercially. Why should people in Bristol have their Council tax paying for people from outside to use the P&R?
The reason for the new fares being £4 return (Bristol Day Ticket) rather than £3 return on the 903 is because it is no longer subsidised by the council and being run 100% commercially. Why should people in Bristol have their Council tax paying for people from outside to use the P&R?
On my lunchtime trip on the way in the bus arrived at the light at the end of the bus lane just as it went red so all the traffic then overtook the bus and on the way back out again the car traffic had tailed across the Redcliffe roundabout in the outside lane so the bus couldn't get out to go up Redcliffe Hill.Seems to be some bunching this evening with buses running in pairs on the m2.
I noted Carl mentioned that traffic around Temple Gate. It’s good to see the bus lane down from St. Mary Redcliffe towards Temple Gate has been reinstated with temporary lights.
Surely it ought to be possible to ensure that the bus always gets a green light.On my lunchtime trip on the way in the bus arrived at the light at the end of the bus lane just as it went red so all the traffic then overtook the bus and on the way back out again the car traffic had tailed across the Redcliffe roundabout in the outside lane so the bus couldn't get out to go up Redcliffe Hill.