• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Brighton mainline capacity proposal

Status
Not open for further replies.

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,515
Location
Northampton
Looking at RTT, Platform 5 sees a few odd down trains on the slow side today but mostly it hosts London Bridge and Watford terminators. Even these are a bit of a pain as on northbound departure you can't have a simultaneous run in to 4 at the same time.
its really not a problem, the terminator wont be holding the overlap so you get a suitsble gap between two up trains and follow the P4 departure.
Couldn't find any up passenger arrivals from the south in 5 on a cursory look, although there were occasional up freight paths.
Freight is usually recessed at P5, so it will have the parallel overlap (towards the Down Slow) and the 2 minute timeout will have elapsed by the time its path is available.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

MarkyT

Established Member
Joined
20 May 2012
Messages
7,565
Location
Torbay
its really not a problem, the terminator wont be holding the overlap so you get a suitsble gap between two up trains and follow the P4 departure.

Freight is usually recessed at P5, so it will have the parallel overlap (towards the Down Slow) and the 2 minute timeout will have elapsed by the time its path is available.
At least with the closely spaced 4-aspect signalling you can depart 5 on a yellow very quickly after a platform 4 departure. The downside is that if there's a delay in 5 up departure due to doors/punters or similar after route is set, the next 4 up arrival could end up held south of the station. If there was a restricted overlap on platform 4, at least the next arrival might be brought in at restricted speed on a warning aspect, but there really is not enough room even for that with only about 30m from the gantry to the fouling point of the crossover. CARS really solves all these problems, with not only more platforms on both slow and fast sides, but unrestricted free overlaps for all routinely used moves.
 
Status
Not open for further replies.

Top