Iskra
Established Member
For anyone needing to cover the line, or just wanting a trip; on Saturday 16th of May 4 trains per day are operating on the line in each direction due to engineering works on the more common route via Scunthorpe.
That’s interesting, Retford is normally one of the busiest stops on this route. It shows that this train is more aimed at end to end journeys then.Seem to be running non-stop between Sheffield/Gainsborough C too
To reduce potential overcrowding concerns?What would be the reasoning behind NOT calling at Worksop or Retford?
Possibly, but the only problem with getting WCR traction is it would probably still end up with the same capacity as a 2car unit for the travelling public as the rest of it would be taken up by enthusiasts.Yes, well, if it's Northern (which it is) it will probably end up being a 2 car 150 or something similarly (potentially) inadequate. But then - it rather defeats the object of providing a "rail replacement" service using a train, if it isn't intended to do exactly that. Better to have engaged WCR or similar, perhaps.