Looks like a train has failed at Bridgend this evening, causing major disruption west of Cardiff...

Even worse, access to the VoG diversion line is restricted due to speed restrictions over defective track down the line.

== Doublepost prevention - post automatically merged: ==

Image shows the signalling map around Cardiff West, with a BLOK at Grangetown.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

SuperLuke2334

Established Member
Joined
23 Oct 2021
Messages
1,898
Location
Welsh Marches
Looks like a train has failed at Bridgend this evening, causing major disruption west of Cardiff...

Even worse, access to the VoG diversion line is restricted due to speed restrictions over defective track down the line.

== Doublepost prevention - post automatically merged: ==

View attachment 137330
It's 175114, reported to be low on fuel.
 

Topological

Established Member
Joined
20 Feb 2023
Messages
4,331
Location
Swansea
Are we talking about the two trains marked **** on the signal map?


There was a freight went through Bridgend 264 late, I was assuming at first that might be a sign movement was possible.
 

Techniquest

Veteran Member
Joined
19 Jun 2005
Messages
21,841
Location
Nowhere Heath
Cardiff Central was certainly a bit chaotic today, what with all the delays this event caused, plus a points failure affecting trains through Queen Street.

Is it still ongoing?
 

Topological

Established Member
Joined
20 Feb 2023
Messages
4,331
Location
Swansea
Any idea why they have 2F20 occupying the platform at Bridgend?

2F20 in Platform 1 at Bridgend and then 1B21 (17:40 ex CDF) and 1B24 (18:42 ex CDF) GWR at the two signals just outside Bridgend.
 

Topological

Established Member
Joined
20 Feb 2023
Messages
4,331
Location
Swansea
I hope at some point someone will be able to say what happened. That was a long delay, including a seemingly large gap between the first trains moving from the East into Bridgend station, anything being sent from Cardiff and then 2F20 finally clearing the platform for the Swansea trains stuck behind.

My 19:30 from Manchester was cancelled, presumably as a consequence of this incident, although RTT had a set swap planned at Cardiff to a 175/1 from the 2 x 153 which had done the Milford Haven to Cardiff part of the inward working.
 

father_jack

Established Member
Joined
26 Jan 2010
Messages
1,557
1V40 got to Bridgend at 1520. https://www.realtimetrains.co.uk/service/gb-nr:W26525/2023-06-14/detailed

The failed unit was moved as this in the end after being sent up the Maesteg line to get out of the way https://www.realtimetrains.co.uk/service/gb-nr:68740/2023-06-14/detailed, the only available rescue unit intended was 2 trains behind the failure with a freight in the way. There was a buckled rail in the mix at Grangetown which was on the route of the rescue train indeed and then that train also had issues.
 