• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Bridge Hit at Bramley (West Yorkshire)

Status
Not open for further replies.

CalderRail

Member
Joined
21 Aug 2013
Messages
281
I'm on the York-Blackpool service, and we've been stopped just after leaving Leeds station.

Guard has told us that Network Rail have stopped all trains so they can inspect the bridge.
--- old post above --- --- new post below ---
Now moving at 5mph; guard says it's so we can "inspect the line as we go", which is quite unlikely - especially in the dark!
--- old post above --- --- new post below ---
Looks like they are only permitting one train at a time to be on the bridge just west of Bramley station.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

CalderRail

Member
Joined
21 Aug 2013
Messages
281
An hour late getting to Hebden Bridge (not entirely due to this - we were 10 mins late leaving York)
 

wensley

Established Member
Joined
29 Jun 2008
Messages
2,045
Location
On a train...somewhere!
I'm on the York-Blackpool service, and we've been stopped just after leaving Leeds station.

Guard has told us that Network Rail have stopped all trains so they can inspect the bridge.
--- old post above --- --- new post below ---
Now moving at 5mph; guard says it's so we can "inspect the line as we go", which is quite unlikely - especially in the dark!
--- old post above --- --- new post below ---
Looks like they are only permitting one train at a time to be on the bridge just west of Bramley station.

Quite likely that if you're train was immediately in the vicinity of the bridge the driver would be asked to examine the line whilst passing over the bridge at reduced speed.

There are special instructions applied to bridges (dependent on which category they fall into out of red, amber or double amber). The local NR Mobile Ops Manager and a bridge examiner will also be summoned and they have the final say regarding the bridge's condition. Most of the 'bashes' I've known of result in superficial damage and the MOM will generally be able to to authorise linespeed.
 
Last edited:
Status
Not open for further replies.

Top