CalderRail
Member
- Joined
- 21 Aug 2013
- Messages
- 281
I'm on the York-Blackpool service, and we've been stopped just after leaving Leeds station.
Guard has told us that Network Rail have stopped all trains so they can inspect the bridge.
--- old post above --- --- new post below ---
Now moving at 5mph; guard says it's so we can "inspect the line as we go", which is quite unlikely - especially in the dark!
--- old post above --- --- new post below ---
Looks like they are only permitting one train at a time to be on the bridge just west of Bramley station.
Guard has told us that Network Rail have stopped all trains so they can inspect the bridge.
--- old post above --- --- new post below ---
Now moving at 5mph; guard says it's so we can "inspect the line as we go", which is quite unlikely - especially in the dark!
--- old post above --- --- new post below ---
Looks like they are only permitting one train at a time to be on the bridge just west of Bramley station.