• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

BR Standard Block Instrument

Status
Not open for further replies.

Phil25

Member
Joined
17 Sep 2025
Messages
24
Location
Poland
Hello. When looking at signal boxes I came across some weird differences. A lot of people probably recognize the famous BR standard block instrument, but I've seen that a lot of them have their TOL (Train On Line) indication on the right whilst some of them on the left. AI I used mentions that the standard position for block instruments is TOL on the right, so I was wondering why are there so many pictures of these block instruments with TOL indication on the left? Below is an interesting picture of a signal box with two such different instruments (you need to look closely).

Kirkby%20Stephen%20Signal%20Box%20Interior%20050306g-L.jpg
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

PhilH

Member
Joined
4 Feb 2017
Messages
16
The instruments came in both hands. When BR replaced older instruments with its standard type, it matched the orientation of TOL (left or right) with the replaced instruments so that the signaller would see no difference.
 
Status
Not open for further replies.

Top