Walking along the coastal path at Huntcliff south of Saltburn today, where the freight line makes that enormous loop around the hillside, I was struck by how close the track is to the cliff edge. From old photos it appears that the line used to be double-track, now singled, which has bought some space, but even so the route looks vulnerable to coastal erosion in the longer term. Given that the railway is 200+ feet above the sea at this point it would surely mark the end of the route if it were ever breached.

The route in itself is a precarious survivor given the parlous state of Teesside steelmaking but it is hanging on and well worth a visit even if the trains are few and far between; today the skylarks were singing and the fulmars soaring above the cliffs.But I won't be surprised if one day the route is no more, there's certainly less room to spare than on the ECML at Burnmouth for instance.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

PHILIPE

Veteran Member
Joined
14 Nov 2011
Messages
13,472
Location
Caerphilly
If you travel up or down Gresford Bank between Chester and Wrexham over the single line, it makes me wonder now how on earth it could ever have been double track in the past when you look down and see a big drop from the embankment down onto the A483. There is high banking on the opposite which looks like a tight squeeze. I use to use the route to and from work when it was double track with a speed restriction due to mining subsidence
 

RichmondCommu

Established Member
Joined
23 Feb 2010
Messages
6,906
Location
Richmond, London
The route in itself is a precarious survivor given the parlous state of Teesside steelmaking but it is hanging on and well worth a visit even if the trains are few and far between; today the skylarks were singing and the fulmars soaring above the cliffs.But I won't be surprised if one day the route is no more, there's certainly less room to spare than on the ECML at Burnmouth for instance.

Does the route serve the potash mine? How frequent are the trains? One a day?
 

4973

Member
Joined
21 Feb 2017
Messages
55
Does the route serve the potash mine? How frequent are the trains? One a day?


It varies according to the ships that are in to receive the traffic, but you can expect 2 or 3 during office hours. Some go to Tees Dock, others to Middlesboro.

There is also one or two to Skinningrove.
 

bearhugger

Member
Joined
17 Mar 2015
Messages
688
Location
Middlesbrough

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
32,909
Location
Fenny Stratford
Does the route serve the potash mine? How frequent are the trains? One a day?

It serves the potash mines at boulby and the British steel special profiles division at Skinningrove - there are a couple of trains a day ( try crag Hall signal box on rtt)
 
Last edited: