Bottesford and Aslockton platforming

Status
Not open for further replies.

Rob F

Member
Joined
17 Dec 2015
Messages
453
Location
Notts
Came back from Skegness to Nottingham yesterday on a 3 car ex-Southern EMR Turbostar. Between Grantham and Nottingham we were sat at the very rear of the train in the former first class area. Upon leaving Grantham, the guard announced that passengers for Bottesford and Aslockton should travel in the front two coaches as the doors in the rear coach would not be released due to platform lengths. However at both stations the train was easily fully in the platform (by at least 20m) and there seemed to be no reason for this restriction at all. Can anyone shed any light on it?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

CyrusWuff

Established Member
Joined
20 May 2013
Messages
5,436
Location
London
Whilst the platforms may have physically accommodated the train, the full length may not be available for operational use.

For planning purposes, Aslockton's platforms are 76m in the Down direction (towards Nottingham) and 73m in the Up direction (towards Grantham/Sleaford), and Bottesford's are 139m/121m.

A three car 170 is just short of 72m long, so Bottesford should have been fine, but Aslockton would have been a bit tight.

It also seems that some platform lengths may have changed, as those given in the Timetable Planning Rules don't match the Sectional Appendix (last updated December 2006.)
 

HarryF

Member
Joined
31 Jul 2022
Messages
162
Location
UK
Having used Bottesford around 5 years ago, I seem to remember only part of it had been raised to a height that was similar of that to the train. The rest of the platform was much lower, and I wonder if this section is out of use.
 

The exile

Established Member
Joined
31 Mar 2010
Messages
9,353
Location
Somerset
Having used Bottesford around 5 years ago, I seem to remember only part of it had been raised to a height that was similar of that to the train. The rest of the platform was much lower, and I wonder if this section is out of use.
There was a bit of rebuilding work going on a few months ago at Bottesford - whether that has any bearing on things I have no idea.
 

High Dyke

Established Member
Joined
1 Jan 2013
Messages
5,003
Location
Yellabelly Country
It will also depend what information is in the station notes for guards. The suggestion about low sections of platform makes sense. Whilst a 3-car unit does fit, a number of guards prefer not to take the risk in a passenger accident at Bottesford. The building work at Bottesford is complete. Some of that was new access arrangements and replacing some of the support walls.

Bottesford: A recent notice issued to staff states: "Down platform will take a 4-car 15x and 3-car 170."
 

LowLevel

Established Member
Joined
26 Oct 2013
Messages
8,905
The layout for the stations is tricky.

Aslockton:
Up platform towards Grantham would physically fit 3 coaches if you drew up to the end, but you have to stop short of the signal on the platform so in practice it is a 2 coach platform, the 3rd coach has over half a coach off the back.

Down platform: has a particularly low height at the Grantham end and whilst it can in theory be used most guards will just use the front 2 coaches which are on the raised section.

Bottesford has just been totally rebuilt, the build work looked complete but wasn't at the time of the OP on the down so only the front 2 coaches were permitted to be used. It's now been commissioned.
 