The Waverley should have been rebuilt as a trunk route.
No that would have been a Jumbo undertaking.
The Waverley should have been rebuilt as a trunk route.
No that would have been a Jumbo undertaking.
It's called value engineering, the scheme would have never got off the ground if it had been to a higher specification. Be grateful for what we have.
I would suggest that for a single track railway to justify the cost of electrification then it would need to be carrying a lot of passengers - so many in fact, that it would warrant doubling.
You mean like the Windermere branch?
(Yes, I know it's not quite the same situation, as leaving that single track line unelectrified would leave a diesel island and a lot of diesel-running running under the wires).
I get the value engineering, but most of the track in the video looks like it's been put in the centre of the double track bed. Wouldn't it at least have made sense to put it to one side, so that in the event that double-tracking is required at some point in the future, the existing track doesn't then have to be ripped up again?
--- old post above --- --- new post below ---
You mean like the Windermere branch?
(Yes, I know it's not quite the same situation, as leaving that single track line unelectrified would leave a diesel island and a lot of diesel-running running under the wires).
I get the value engineering, but most of the track in the video looks like it's been put in the centre of the double track bed. Wouldn't it at least have made sense to put it to one side, so that in the event that double-tracking is required at some point in the future, the existing track doesn't then have to be ripped up again?
I'm very pleased to I know this subject comes up time and time again, but I feel that there's doing a job on the cheap to get it done quicker and cheaper, or doing a job to last a lot longer and to be more capable of future proofing.
Sadly it has. Don't get me wrong, I'm very pleased to see the Borders Railway finally come to fruition, but disappointed in the Dynamic Loop near Stow being reduced in length, and even more disappointed to see the amount of track which has been centred - not least on the Northern Section where there are aspirations to run 4TPH to Gorebridge. The track through Eskbank being a prime example of the former Double Track layout being reduced to single with the new track running down the centreline of the former double, and concrete beams/troughs shoring up the former stone platform walls either side. Or both viaducts through Gala which are both Single. I know this subject comes up time and time again, but I feel that there's doing a job on the cheap to get it done quicker and cheaper, or doing a job to last a lot longer and to be more capable of future proofing.
Sadly it has. Don't get me wrong, I'm very pleased to see the Borders Railway finally come to fruition, but disappointed in the Dynamic Loop near Stow being reduced in length, and even more disappointed to see the amount of track which has been centred - not least on the Northern Section where there are aspirations to run 4TPH to Gorebridge. The track through Eskbank being a prime example of the former Double Track layout being reduced to single with the new track running down the centreline of the former double, and concrete beams/troughs shoring up the former stone platform walls either side. Or both viaducts through Gala which are both Single. I know this subject comes up time and time again, but I feel that there's doing a job on the cheap to get it done quicker and cheaper, or doing a job to last a lot longer and to be more capable of future proofing.
RAIL passengers in the north of Scotland can expect to travel in “inferior, outdated” carriages once the new Border railway opens, it has been claimed.
Union officials and politicians, as well as some rail staff in the Highlands, believe that the most up-to-date carriages currently used on north rail lines are to be switched to the Borders to “tart up” the new operation when it is launched in September.
Abellio ScotRail has admitted that only one of its fleet of trains on the Borders Railway will be upgraded in time for Britain’s longest line re-opening.
However, last night a spokeswoman could not confirm the controversial transfer of carriages.
I honestly cannot believe they are turning their noses up at Class 158s even in an unrefurbished state.
I would think only limited truth (if any) since it would mean transferring RETB-equipped 158s down south, and fitting portable equipment to the 158s that transfer up North.Does anyone know if there is the slightest truth in this story?
The Borders people aren't objecting to 158s. The moaning is from folk in the North (and of course Mick Cash) that they may lose their good 158s to the Borders and get rubbish 158s instead.
Does anyone know if there is the slightest truth in this story?
20140731_063243 by Julian Whitby, on Flickr
158725 at Inverness by Julian Whitby, on Flickr
37401 stabled at Aberdeen by Julian Whitby, on FlickrThere is one other solution.
Send them some Pacers, then the moaning about 158's will disappear.
Wasn't the borders railway meant to be electrified in the original plans? What a waste electrifying to Newcraighall with catenary that won't be used.
Seriously though Class 158s are fairly decent units which I think would fit the line perfectly given its linespeed.
If they don't want 158s on their railway, then let's rip it all up and put it somewhere where trains of any sort would be welcome.
20140731_063243 by Julian Whitby, on Flickr
Yep, I couldn't help using my own photos to demonstrate my point!
Wasn't the borders railway meant to be electrified in the original plans? What a waste electrifying to Newcraighall with catenary that won't be used.