I can't put a positive spin on this. All that single track on mostly double track bed :( Shame on the Scottish Government / Transport Scotland.

It's called value engineering, the scheme would have never got off the ground if it had been to a higher specification. Be grateful for what we have.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

fegguk

Member
Joined
11 Sep 2012
Messages
181
Location
Hawick
Had the value engineering approach been taken more seriously in 1968 the line would never have closed North of Hawick. The ideal is often the enemy of the good.
 

Pinza-C55

Member
Joined
23 May 2015
Messages
1,035
It's called value engineering, the scheme would have never got off the ground if it had been to a higher specification. Be grateful for what we have.

Not arguing with the single track if it keeps costs down but building single track over or under bridges is just silly cost cutting.
 

PaxVobiscum

Established Member
Joined
4 Feb 2012
Messages
2,410
Location
Glasgow
Check out :D those guard rails protecting structures eg at 00:15 to 00:27

I did but I can't understand what you are saying - could you expand please?

Check out:
A feeble and unnecessary pun (the terms 'guard rails' and 'check rails' are often confused)

:D:
An acknowledgement of the above

those guard rails protecting [newly built or refurbished railway] structures:
A reference to http://www.railforums.co.uk/showthread.php?t=117035]this thread also currently active on the Infrastructure & Stations forum, and of which some at least of those reading this will be aware. 4 sets of guard rails can be seen in the linked 4' 44" video.

eg 00:15 to 00:27:
An example, in elasped time, of where the guard rails might be seen in the video

HTH
(Hope this helps)
 

HowardGWR

Established Member
Joined
30 Jan 2013
Messages
4,981
Check out:
A feeble and unnecessary pun (the terms 'guard rails' and 'check rails' are often confused)

:D:
An acknowledgement of the above

those guard rails protecting [newly built or refurbished railway] structures:
A reference to http://www.railforums.co.uk/showthread.php?t=117035]this thread also currently active on the Infrastructure & Stations forum, and of which some at least of those reading this will be aware. 4 sets of guard rails can be seen in the linked 4' 44" video.

eg 00:15 to 00:27:
An example, in elasped time, of where the guard rails might be seen in the video

HTH
(Hope this helps)

Sadly no PV. I understood all that you have just explained before you have explained it, but I don't understand what was your point. Perhaps you were not making one, in which case I was trying to read into what was not there. Apologies.
 

PaxVobiscum

Established Member
Joined
4 Feb 2012
Messages
2,410
Location
Glasgow
My last try: :D

Perhaps someone will recall if there were any such precautionary trackwork measures on bridges on the original Waverley route; a cursory look at old photographs and films of likely places has failed to find any. Trap points abound and check rails can be seen on curves but I have not so far been able to find evidence of any guard rails on this part of the Waverley route.

This is, for me at least, an interesting contrast of safety standards between then and now. For some, used to the older standards, the new arrangements might appear 'over engineered' - not that I am suggesting they actually are.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,594
Location
Nottingham
My last try: :D

Perhaps someone will recall if there were any such precautionary trackwork measures on bridges on the original Waverley route; a cursory look at old photographs and films of likely places has failed to find any. Trap points abound and check rails can be seen on curves but I have not so far been able to find evidence of any guard rails on this part of the Waverley route.

This is, for me at least, an interesting contrast of safety standards between then and now. For some, used to the older standards, the new arrangements might appear 'over engineered' - not that I am suggesting they actually are.

Guard rails are a standard precaution on underbridges and viaducts where the parapet isn't considered solid enough to prevent a derailed train going off the edge. They are likely to be a reasonably practicable means of preventing a minor derailment becoming a major disaster.

I don't know how long they have been used, but I suspect a long time.

Your comment about trap points should I think refer to catch points (used to derail divided trains rolling back down a gradient, whereas trap points derail trains exiting loops and sidings when not signalled to do so).
 

Ploughman

Established Member
Joined
15 Jan 2010
Messages
3,097
Location
Near where the 3 ridings meet
A friend of mine has this comment about the You Tube clip -
Is it just me, or is all that ‘riot fencing’ utterly depressing?
..and why plant all those trees just to have to cut them down when leaf fall becomes a problem?
.. and as for the modern method of having one standard tubular pole for speed restriction signage and then not trimming the top off. Obviously aesthetics is not a word in the Network Rail manual, or Highways authorities these days either.
 

ADRboy

Member
Joined
13 Jul 2008
Messages
160
A friend of mine has this comment about the You Tube clip -
Is it just me, or is all that ‘riot fencing’ utterly depressing?
..and why plant all those trees just to have to cut them down when leaf fall becomes a problem?
.. and as for the modern method of having one standard tubular pole for speed restriction signage and then not trimming the top off. Obviously aesthetics is not a word in the Network Rail manual, or Highways authorities these days either.

The plants picked are ones which don't shed leaves. Fences do look brutal just now.
 

PaxVobiscum

Established Member
Joined
4 Feb 2012
Messages
2,410
Location
Glasgow
Your comment about trap points should I think refer to catch points (used to derail divided trains rolling back down a gradient, whereas trap points derail trains exiting loops and sidings when not signalled to do so).

No, it was indeed trap points on sidings I was meaning. The photos and films of the Waverley line I was looking at earlier today had trap points, but no catch points (though considering how heavily graded other parts of the line were I imagine there were some catch points used in places on the line).
 
Last edited:

Pinza-C55

Member
Joined
23 May 2015
Messages
1,035
No, it was indeed trap points on sidings I was meaning. The photos and films of the Waverley line I was looking at earlier today had trap points, but no catch points (though considering how heavily graded other parts of the line were I imagine there were some catch points used in places on the line).

If there were Catch Points they would have to have Catch Point signs in case Wrong Line working was in force eg during engineering works.
 

QueensCurve

Established Member
Joined
22 Dec 2014
Messages
2,195
Quote:
Originally Posted by Altfish View Post
It's called value engineering, the scheme would have never got off the ground if it had been to a higher specification. Be grateful for what we have.
Not arguing with the single track if it keeps costs down but building single track over or under bridges is just silly cost cutting.
Pinza-C55 is offline Report Post Reply With QuoteNot arguing with the single track if it keeps costs down but building single track over or under bridges is just silly cost cutting.

Both positions have an elephant of truth in them.

It is true that the best option for reopening the route was to select the adopted mix of single and double track.

It remains true that it might have been sensible to make passive provision for later conversion to double track - and electrification come to that.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
It remains true that it might have been sensible to make passive provision for later conversion to double track - and electrification come to that.

Passive provision for electrification has been made, in that any new bridges will certainly have the headroom (as do virtually all new bridges over railways), and that where the line is single and goes under an old arched bridge, it has been aligned under the centre of the arch.
 

Pinza-C55

Member
Joined
23 May 2015
Messages
1,035
Passive provision for electrification has been made, in that any new bridges will certainly have the headroom (as do virtually all new bridges over railways), and that where the line is single and goes under an old arched bridge, it has been aligned under the centre of the arch.

Passive provision for electrification isn't the same as passive provision for doubling. If you have a new single track bridge and you wish to electrify it "as is" you simply electrify it, job done. I would suggest that for a single track railway to justify the cost of electrification then it would need to be carrying a lot of passengers - so many in fact, that it would warrant doubling. In that case old bridge + centre single track is a false economy because you may need to slew the single track, lay a 2nd track, electrify AND rebuild the bridge.
 

HowardGWR

Established Member
Joined
30 Jan 2013
Messages
4,981
Passive provision for electrification isn't the same as passive provision for doubling. If you have a new single track bridge and you wish to electrify it "as is" you simply electrify it, job done. I would suggest that for a single track railway to justify the cost of electrification then it would need to be carrying a lot of passengers - so many in fact, that it would warrant doubling. In that case old bridge + centre single track is a false economy because you may need to slew the single track, lay a 2nd track, electrify AND rebuild the bridge.

I think they knew that, but decided to take the risk that the New Waverley would not be as successful as we here would hope. Thanks to Pax Vobiscum for further post.
 

clc

Established Member
Joined
31 Oct 2011
Messages
1,326
Both positions have an elephant of truth in them.

It is true that the best option for reopening the route was to select the adopted mix of single and double track.

It remains true that it might have been sensible to make passive provision for later conversion to double track - and electrification come to that.

Would it have been a mammoth undertaking to make provision for double tracking?
 