315801
Member
- Joined
- 12 Jul 2022
- Messages
- 201
Moderator note: Split from
The way I see it is that perhaps if a suggestion I put on rmweb when I was a member hadn't been ridiculed as badly as it was, it is possible that the service might have been running much sooner and probably better.
What I suggested was about using either 25Kv AC or 750v DC along the entire route.
I must point out her before anybody comes down on me like a ton of bricks that I do not know which of those power supply systems is cheaper to install and maintain. The thought was that even as the 3 coach units they are mow, the D78 stock could have been converted to 3 rail operation like the 5 x 2 coach class 484s for the Isle of Wight or if not using the D78 stock, the current class 507 and 508 units could have been providing a service on the Wrexham line.
From the comments I have seen and read since I joined the forum, it appears ( and I may be wrong here in which fair enough if I am ) that the D78 / Class 230s were possibly not the best selection of stock to use on the line at least that is the impression I am getting.
Admittedly I have not rode on the Wrexham line for a good few years ( the last time was when 150250 was the unit working the route ) but the 150 unit ran well and from what I was told by the guard at the time I think the unit was not even 1 minute down by the time I got off at shotton to change for a main line service to Llandudno.
If required bybthe moderators I might start a new thread once I know where it would need to be posted regarding whether forum members think that 25Kv AC or 750v DC would be better for yse on the Wrexham line, if the moderators could advise me regarding this I would be grateful.
Class 230 units training/introduction on the Borderlands line.
Today looking better. +9 leaving Bidston on the last run. It’s only got to last another 3 ish hours and its completed the day
www.railforums.co.uk
The way I see it is that perhaps if a suggestion I put on rmweb when I was a member hadn't been ridiculed as badly as it was, it is possible that the service might have been running much sooner and probably better.
What I suggested was about using either 25Kv AC or 750v DC along the entire route.
I must point out her before anybody comes down on me like a ton of bricks that I do not know which of those power supply systems is cheaper to install and maintain. The thought was that even as the 3 coach units they are mow, the D78 stock could have been converted to 3 rail operation like the 5 x 2 coach class 484s for the Isle of Wight or if not using the D78 stock, the current class 507 and 508 units could have been providing a service on the Wrexham line.
From the comments I have seen and read since I joined the forum, it appears ( and I may be wrong here in which fair enough if I am ) that the D78 / Class 230s were possibly not the best selection of stock to use on the line at least that is the impression I am getting.
Admittedly I have not rode on the Wrexham line for a good few years ( the last time was when 150250 was the unit working the route ) but the 150 unit ran well and from what I was told by the guard at the time I think the unit was not even 1 minute down by the time I got off at shotton to change for a main line service to Llandudno.
If required bybthe moderators I might start a new thread once I know where it would need to be posted regarding whether forum members think that 25Kv AC or 750v DC would be better for yse on the Wrexham line, if the moderators could advise me regarding this I would be grateful.
Last edited by a moderator: