Not enough demand we're struggling to keep one factory in work let alone more (and of course that'll soon be two).
Not enough demand we're struggling to keep one factory in work let alone more (and of course that'll soon be two).
Which of course means it will go to someone like CAFTotally agree though, it seems totally logical for Siemens to provide the Crossrail fleet what with them having supplied the Thameslink fleet and the signalling.
As Southern have Bombardier personnel who work in the depots to help with maintanence, I thought it would have made sense having Bombardier win the TL stock order as it could save a bit not having two different teams only able to look after certain stock from a certain manufacture. But this could only make a minor cost savings in future, i guess.
Unless I'm very much mistaken the TL contract is a total service provision contract which includes the provision for brand new depots. Which means, of course, that the experience of current depot personnel is not really an issue as they'll be hiring new staff anyway.
But it did then improve and they became one of the most reliable EMUs didn't they? I seem to remember reading that in a magazine
...SWTs 455s down in Bournemouth.
Unless I'm very much mistaken the TL contract is a total service provision contract which includes the provision for brand new depots. Which means, of course, that the experience of current depot personnel is not really an issue as they'll be hiring new staff anyway.
Its 2 new depots, isnt it? One in Three Bridges and the other somewhere around Hornsey?
I guess Selhurst will only be used for stabling for the new stock. (if its used at all)
Three Bridges is certainly correct as it is go nearby the site that was used and possibly still is used by Bombardier for the Voyagers when they were doing services from Brighton.
Its 2 new depots, isnt it? One in Three Bridges and the other somewhere around Hornsey?
I guess Selhurst will only be used for stabling for the new stock. (if its used at all)
Unless I'm very much mistaken the TL contract is a total service provision contract which includes the provision for brand new depots. Which means, of course, that the experience of current depot personnel is not really an issue as they'll be hiring new staff anyway.
Now, for its time, take the 375 - that came into service nearly two years before Siemens' offering of the 450. To this date, out of the two classes, which one has proper SDO across working multiple-units, and which one has "SDO" such that you can only release the doors of a single unit? The WAT- WNR service really suffers from this affliction - at least, until they bother to lengthen Sunnymeads.
It just feels like Siemens were trying to save money, and even to this date, while it feels like Bombardier aren't going anywhere by using the same body shell, they've kept their technical specs up to where they should be.
As a fusspot, I beg to disagree. Some versions of the Electrostar and Turbostar are excellent, though they could have been very much better. My main criticisms of these trains are the bouncy ride, the small radius lower bodyside curvature and the lack of an end-door version for longer-distance routes. The 375/377 is a very successful implementation of a front end with gangway connection.Personally I'm not a fan of Bombardier at all. I find their trains to be very uncomfortable, and the rattling of loose panels and shoddy ride quality says it all about the build quality if you ask me. Electrostars and Turbostars are probably my least favourite trains in the UK, if not the world. However, I must admit that their trams are not bad at all. The new Blackpool Flexities, as much as I don't like the fact that they replaced the more interesting old fleet, are pretty good trams overall.
Edit: I'll also add that some of their continental units are pretty good too, it's largely the Electrostars and Turbostars that make me dislike them.
It's a bit like the "New" cars they put out. CHange a few trims and it's apparently a new car.
Plus, besides the above, it's one thing making a visualisation and another actually bnuilding it.
I personally don't see anything wrong with Bombardier. Now, they technically inherited the Electrostar design from ADtranz, and while the fundamentals haven't changed, it's a sound design that works - very modular, and very flexible. If it ain't broke, then why fix it?
Then we come to the Victoria '09 Stock. Loved by all, but unlike the tried-and-true Electrostar series, the new tube stock is very much a "new" venture. There were bound to be one or two teething problems at release, and in this case, it happened to be an over-sensitive safety feature. It cost them a bit to fix, but now they're not stopping in the tunnels every 5 minutes, they seem to be very good at what they do.
(I still believe, though, that the sensitive edges should be replaced by sharpened blades that threaten to slice anyone who dares hold the doors open - still a big problem for trains on Victoria Northbound.)
Now, for its time, take the 375 - that came into service nearly two years before Siemens' offering of the 450. To this date, out of the two classes, which one has proper SDO across working multiple-units, and which one has "SDO" such that you can only release the doors of a single unit? The WAT- WNR service really suffers from this affliction - at least, until they bother to lengthen Sunnymeads.
Which one also had memory limitations in regards to the CIS, resulting in passenger announcements being chopped-off half way?
It just feels like Siemens were trying to save money, and even to this date, while it feels like Bombardier aren't going anywhere by using the same body shell, they've kept their technical specs up to where they should be.
Don't get me wrong - I don't mind Siemens, but I definitely prefer what Bombardier (and Hitachi, for that matter) have to offer.
The Aventra, like the Desiro City, is a bit more than a change of body... They are brand new products, significantly different to their predecessors.
If I offered you a car that was clearely more reliable than anything else would you pay double for it ?.
I wonder how relatively cheap/expensive Bombardiers products are ?.
Bombardiers weakness was that they did not have the financial muscle behind them to support the Thameslink bid. What was required was a total train service provision which meant being able to borrow a lot of money at a REASONABLE interest rate. The winner then gets paid back monthly/yearly over the life of the trains not one payment on delivery/acceptance. Siemens could do it. Thats my understanding of it but then again thats probably more than the decision makers (DAfT) understood.
The Aventra, like the Desiro City, is a bit more than a change of body... They are brand new products, significantly different to their predecessors.
Ride quality is very good overall on the 'Stars whilst Desiro ride quality is perfect on good track, encounter any bad track or some bad points and you get thrown from side to side, the ride on the 'Stars is much more conventional and overall it is is better.
How do you come to that conclusion on something that doesn't exist outside of a 3D model/technical drawings? I note you say products rather than anything else, which is a wise choice of words.
If you are in the know or can direct me to some more substantial information on the design, I will believe the spin Derby is spitting out. Until then, I keep my reservations.
...Because even in its concept stage, the design is significantly different... Bombardier wouldn't invest in developing a train that won't meet the requirements for a high-performance EMU. That may also be why the Electrostar has been made for so long; if it meets the requirements for a suburban EMU, then why change it?
...Because even in its concept stage, the design is significantly different... Bombardier wouldn't invest in developing a train that won't meet the requirements for a high-performance EMU. That may also be why the Electrostar has been made for so long; if it meets the requirements for a suburban EMU, then why change it?
Derby..
http://www.youtube.com/watch?v=b_ZeJqNt4Hk
In fairness the last good thing that came out of Litchurch Lane was the 158/9.. Everything else since is....
--- old post above --- --- new post below ---
That would be why Irish Rail told them no chance.. Derby offered a 170 for the Irish Intercity units...
Irish Rail said no, we want something different..
Derby said its a 170 or nothing else..
Irish Rail went to Japan/Korea for their DMU's as they gave what the customer asked for..
Thats why they lost the ThamesLink contract.. Not willing to build something that has been asked for. And unwilling to change the production line..