• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Bombardier

Status
Not open for further replies.

Jatos

Member
Joined
5 Oct 2012
Messages
108
I've noticed the odd jab about bombardier and heard various other things, so just wondering, what is the general opinion of Bombardier?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Manchester77

Established Member
Joined
4 Jun 2012
Messages
2,628
Location
Manchester
The impression I've got is that stuff from Derby can be a bit shoddy but is still a quality product
Up in manchester we get our new bombardier trams from Vienna and are quite good
 

Jatos

Member
Joined
5 Oct 2012
Messages
108
Impression I got is the Clubman/Turbostar/Electrostar family is good, but outside of that, perhaps not so.

I know they have been having a lot of reliability problems with the s-stock trains they made!
 

Wath Yard

Member
Joined
31 Dec 2011
Messages
864
My impression is they don't serve as tasty snacks as the other manufacturers for press launches! Railway journos don't like them and the sheep follow.

All manufacturers of trains for the UK market have had their problems and produced some shoddy stuff (possibly excluding Hitatchi) but certain people like to conveniently forget about some of Alstom's and Siemens's problems and highlight Bombardier's.
 

Jatos

Member
Joined
5 Oct 2012
Messages
108
I seee, whats are Alstoms and Siemens? I have noticed our government is starting to get cosey with Hitachi and letting make inroads in the British rail industry.
 

Wath Yard

Member
Joined
31 Dec 2011
Messages
864
Is your question what are some of the problems experienced by Alstom and Siemens?

Alstom - everything they have produced for the UK.
175s were awful until they had significant work on them. SWT almost returned the whole 458 fleet to the ROSCO, though they also have had significant work on them and are now exceptionally reliable. 390s were late and unreliable. 334s were late and unreliable. 180s were and still are very unreliable.

Siemens - 350s were late, 380s were late, bits fell off them and ScotRail refused to accept them and their initial reliability was very poor.
 

Eagle

Established Member
Joined
20 Feb 2011
Messages
7,106
Location
Leamingrad / Blanfrancisco
Alstom - everything they have produced for the UK.
175s were awful until they had significant work on them. SWT almost returned the whole 458 fleet to the ROSCO, though they also have had significant work on them and are now exceptionally reliable. 390s were late and unreliable. 334s were late and unreliable. 180s were and still are very unreliable.

You forgot 460s. :P
 

fgwrich

Established Member
Joined
15 Apr 2009
Messages
10,616
Location
Hampshire
Is your question what are some of the problems experienced by Alstom and Siemens?

Alstom - everything they have produced for the UK.
175s were awful until they had significant work on them. SWT almost returned the whole 458 fleet to the ROSCO, though they also have had significant work on them and are now exceptionally reliable. 390s were late and unreliable. 334s were late and unreliable. 180s were and still are very unreliable.

Siemens - 350s were late, 380s were late, bits fell off them and ScotRail refused to accept them and their initial reliability was very poor.

However, both of those companies seem to have accepted that their trains have had issues and are prepared to work on them - Alstom has recently brought one of their most experienced managers back over here to sort out any UK Issues, and from the work on the Pendolinos & Junipers, seems to be working very well. Whilst Siemens on the other hand seem very good at getting on with the job in hand, supplying rolling stock with their own depots and increasing the reliability very well. Bombardier on the other hand doesn't seem to particularly show much effort / care & attention towards the UK Market until someone such as LUL is prepared to go raise it in such a way (especially when it's affecting their service). All new rolling stock will have it's faults and niggles, but Bombardier seem to be taking on the role that Alstom once had 10 or so years ago.

My opinion of Bombardier rolling stock, poorer quality rolling stock compared to what's available / offer from other rolling stock producers (Siemens, Alstom, Rotem & CAF), with some designs which i would say are becoming rather outdated (well, they were inherited from ABB/BREL). And then there's issues such as the exhaust problem on the delayed the 172s, the issues with the 09 stock on the vic line with the over sensitive door sensors, and the constant issues with the S Stock.

Im sure others will have comments on the quality of Bombardier's stock too.
 

Eagle

Established Member
Joined
20 Feb 2011
Messages
7,106
Location
Leamingrad / Blanfrancisco
Bombardier produced some of the most reliable and best-performing units in the country: the 22xs.

(But that wasn't in Derby so who cares :P)
 

fgwrich

Established Member
Joined
15 Apr 2009
Messages
10,616
Location
Hampshire
Bombardier produced some of the most reliable and best-performing units in the country: the 22xs.

(But that wasn't in Derby so who cares :P)

True, but then Siemens & Alstom also produces some of the best performing rolling stock in the country too. I would personally put the blame on Bombardiers UK Management - What Bombardier seems to produce over in Europe is impressive (Including the Croydon & Manchester Trams - a design based on the Cologne Tram), and reliable. But when you have cases such as Southern ordering more 377s, and Bombardier trying to sell them the more expensive (and less compatable) 379s, you do have to wonder.
 

starrymarkb

Established Member
Joined
4 Aug 2009
Messages
5,985
Location
Exeter
Siemens - 350s were late

I thought the 350s were late by 1 week by the time the order was complete (and that was due to pathing from Wildenwrath to the Tunnel) and were going straight into service within a couple of days of delivery...
 

Wath Yard

Member
Joined
31 Dec 2011
Messages
864
I can't recall the exactly how late the 350s were but it wasn't 1 week. Silverlink resurrected the Cobbler trains with 90s - Northampton due to their late arrival.

And then there's issues such as the exhaust problem on the delayed the 172s...

Indeed, the ficticious exhaust problem. There never was an exhaust problem and the problem that did exist with the early 172s was later identified as contaminated fuel.

As for Bombardier trying to flog 379s instead of 377s, is that a fact or just something you read from a journo on the internet? As I initially said, there are some journos who seriously dislike Bombardier and one, who Siemens allowed to drive a 350 on their German test track, who can never find any fault whatsoever with Siemens - I wonder why.
 

Jatos

Member
Joined
5 Oct 2012
Messages
108
Interesting! I wonder why then are government is going for foreign train manufacturers quite often?
 

Eagle

Established Member
Joined
20 Feb 2011
Messages
7,106
Location
Leamingrad / Blanfrancisco
Interesting! I wonder why then are government is going for foreign train manufacturers quite often?

Because they're all foreign. There is no British train manufacturing company.

Bombardier Transportation are German (although the conglomerate is Canadian), they just happen to have a plant in the UK. Hitachi are going to build a plant here too, at Newton Aycliffe.
 

Jatos

Member
Joined
5 Oct 2012
Messages
108
Good! I must admit, I have confidence in Hitachi to build some good stuff, would be nice if Newton Aycliffe supplied stuff outside of Britian!
 

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,070
Location
Redcar
Good! I must admit, I have confidence in Hitachi to build some good stuff, would be nice if Newton Aycliffe supplied stuff outside of Britian!

I wouldn't be so sure it's all that good. We can barely sustain one factory how we're going to sustain two will be interesting to see. Also worth bearing in mind that we're building this factory even though we've ordered less than the DfT said was the absolute minimum to make a UK factory worthwhile.
 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,664
I wouldn't be so sure it's all that good. We can barely sustain one factory how we're going to sustain two will be interesting to see. Also worth bearing in mind that we're building this factory even though we've ordered less than the DfT said was the absolute minimum to make a UK factory worthwhile.

Yes that is a valid point. However one thing that may help Newton Aycliffe over Derby.
Hitachi have no other factory in the area so it will be Hitachi's only one, bombaridier and siemens both have more factories in Europe.
Newton Aycliffe is a lot closer to a port to export continental gauge stock too.

Not saying that it will be a huge success neccesarily but it does have some benefits over derby.
 

bronzeonion

Member
Joined
1 Apr 2009
Messages
673
Location
West London
Personally I quite like Bombardier trains, the modular design makes sense and the trains are very aesthetically pleasing (apart from the recent LU stock)

My personal favourites are the
Southeastern Class 375, excluding the /9's.
London Overground Class 378
Class 168/170's in general
London Midland Class 172

The build quality is not the best in the world I can admit that but in general their trains are more comfortable and nicer to travel in.
 

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,070
Location
Redcar
Not saying that it will be a huge success neccesarily but it does have some benefits over derby.

Which of course means that it could be Derby that ends up closing. My point was just a general one that if we can barely sustain one plant how on earth are we going sustain two? The likelihood it seems to me is that one of them is going to end up closing its doors.

The only way I can see us keeping both is if Bombardier wins Crossrail (though it might be more logical for Siemens to get this) and Hitachi win both additional IEP orders and some export orders into Europe. Not impossible but by no means guaranteed and of course that only really secures their future out to around 2020.
 

bronzeonion

Member
Joined
1 Apr 2009
Messages
673
Location
West London
Which of course means that it could be Derby that ends up closing. My point was just a general one that if we can barely sustain one plant how on earth are we going sustain two? The likelihood it seems to me is that one of them is going to end up closing its doors.

The only way I can see us keeping both is if Bombardier wins Crossrail (though it might be more logical for Siemens to get this) and Hitachi win both additional IEP orders and some export orders into Europe. Not impossible but by no means guaranteed and of course that only really secures their future out to around 2020.

I think Bombardier will get Crossrail because of the bad press the rail industry got because of the Thameslink saga. I'm not a fan of Siemens anyway :P
 

Pumbaa

Established Member
Joined
19 Feb 2008
Messages
5,022
I thought the 350s were late by 1 week by the time the order was complete (and that was due to pathing from Wildenwrath to the Tunnel) and were going straight into service within a couple of days of delivery...

/1s were well over 6 months late - but that was a result of DfT/SRA whatever it was then faff. The delivery schedule completed quicker than expected.

/2s finished 8 weeks ahead of schedule. Their initial reliability was shocking though.
 

MCR247

Established Member
Joined
7 Nov 2008
Messages
10,290
But it did then improve and they became one of the most reliable EMUs didn't they? I seem to remember reading that in a magazine
 

Pumbaa

Established Member
Joined
19 Feb 2008
Messages
5,022
Which of course means that it could be Derby that ends up closing. My point was just a general one that if we can barely sustain one plant how on earth are we going sustain two? The likelihood it seems to me is that one of them is going to end up closing its doors.

The only way I can see us keeping both is if Bombardier wins Crossrail (though it might be more logical for Siemens to get this) and Hitachi win both additional IEP orders and some export orders into Europe. Not impossible but by no means guaranteed and of course that only really secures their future out to around 2020.

It would be utterly bonkers for Siemens not to get Crossrail now. The signalling packages were awarded to the Siemens consortium last week. The consortium that's doing the signalling for Thameslink... Put 2 and 2 together and let's have some efficiency!
 

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,070
Location
Redcar
It would be utterly bonkers for Siemens not to get Crossrail now ... Put 2 and 2 together and let's have some efficiency!

Which of course means it will go to someone like CAF :lol: Totally agree though, it seems totally logical for Siemens to provide the Crossrail fleet what with them having supplied the Thameslink fleet and the signalling.
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,160
Which of course means it will go to someone like CAF :lol: Totally agree though, it seems totally logical for Siemens to provide the Crossrail fleet what with them having supplied the Thameslink fleet and the signalling.

This may seem a bit dumb, but would communication between the Siemens Mobility rolling stock and signalling departments be any better than, say, Siemens signalling and Bombardier rolling stock?

Also, could somebody remind me of the problems with the thirty or so first S8s are and the causes? I recall something about signalling and a late change to Bombardier...
 

Jatos

Member
Joined
5 Oct 2012
Messages
108
Oh, this thread is interesting, certainly nice to know what is really going in train manufacturing.

What was the late change to the S8s? I also quite the Meridian trains, and even the Voyagers, but I never look under the surface of one so don't know the exact build quality.
 

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,070
Location
Redcar
Well the Voyagers are amongst the most reliable trains in the country so I'd suggest the build quality is probably pretty reasonable (though they aren't a product of Derby).
 

Yew

Established Member
Joined
12 Mar 2011
Messages
7,213
Location
UK
I pearsonally think that the problems with bombardier are a top down thing. Since derby has no UIC guage link to the channel it can only make UK guage trains, reducing the market they can deliver to cost effectively. Because of that the long term plan may be to close derby down, hence they dont care about trying to make more 379's and competing for tenders with bespoke(ish) trains, jsut taking the closest star.

I would hope that if derby where to close down, the government would look at funding some sort or BREL thing again, albeit on a smaller scale. Or maybe they could be bought out by the other derby based british engineering firm, that is part owned by the government, Rolls Royce :D

[/conspiriacy mode]
 

Jatos

Member
Joined
5 Oct 2012
Messages
108
Hmm, I would like to see another train manufacturer round here to be honest! Just wants the cash from somewhere..

Ideally could do with been largely immune to foreign takeovers...
 
Status
Not open for further replies.

Top