They are but I don't know if EMT stop at any stations with wires north of STP

It becomes irrelevant though if the system Bombardier come up with allows switching mode on the go.

London - Bedford is around 50 miles I think?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,072
Location
Redcar
It would be nice for them to make the 22x's electric and diesel, I wonder what class they would be then? Will they be renumbered into 3xx's?

I would have thought they will stay the same. Whilst there are no longer hard and fast rules regarding numbering sequences (if there ever were :lol:) 2xx sequence is for Diesel-Electric trains which the 22xs would remain.
 

Pumbaa

Established Member
Joined
19 Feb 2008
Messages
5,022
How many miles is under the wires at the southern end of the MML?

Are the MML platforms at St Pancras wired?

All MML platforms at STP are wired, and they are at Bedford to. The distance is just short of 50 miles (49m53ch)
 

ukrob

Established Member
Joined
15 Jan 2009
Messages
1,810
All MML platforms at STP are wired, and they are at Bedford to. The distance is just short of 50 miles (49m53ch)

So that is a minimum of say 200 miles per diagram per day under the wires which could in theory be removed. Call it 20 (Meridan) diagrams - 4000 miles per day under the wires.

It certainly adds up.
 

MCR247

Established Member
Joined
7 Nov 2008
Messages
10,290
If it can't be done on the move, won't pax be unhappy to have their Journey times made around 5 minutes longer? Also I'm not sure FCC will be happy if every EMT train calls at Bedford...
 

ukrob

Established Member
Joined
15 Jan 2009
Messages
1,810
If it can't be done on the move, won't pax be unhappy to have their Journey times made around 5 minutes longer? Also I'm not sure FCC will be happy if every EMT train calls at Bedford...

It needs to be done on the move or it isn't viable for the Meridans in my opinion.
 

Bastiaan

Member
Joined
7 Dec 2005
Messages
195
Location
Netherlands
Why should the train stop to switch from overhead to diesel? Isn't it just a matter of turning the diesel engines on and putting the pantograph down? That can also be done while running. Or am I thinking too far out of the box now?
 

ukrob

Established Member
Joined
15 Jan 2009
Messages
1,810
Why should the train stop to switch from overhead to diesel? Isn't it just a matter of turning the diesel engines on and putting the pantograph down?

Because current trains can't switch from 3rd rail to overheard without a total reboot whilst stopped.

It can be done of course - just not with existing new stock.
 

westcoaster

Established Member
Joined
4 Dec 2006
Messages
4,493
Location
DTOS A or B
All MML platforms at STP are wired, and they are at Bedford to. The distance is just short of 50 miles (49m53ch)

not 100% correct the wires on the up and down fast stop a good 100m meters south of the platforms (although a 319 has ended up in the down fast platform at bedford :lol:)
--- old post above --- --- new post below ---
Because current trains can't switch from 3rd rail to overheard without a total reboot whilst stopped.

It can be done of course - just not with existing new stock.

again not 100 % true older units can go from dc to ac with no trouble at all.
--- old post above --- --- new post below ---
If it can't be done on the move, won't pax be unhappy to have their Journey times made around 5 minutes longer? Also I'm not sure FCC will be happy if every EMT train calls at Bedford...

dropping the pan on the move is ok but only in certain situations, never put the pan up on the move otherwise you will bring it straight back down again, although i think euro* used to do it on the move.
 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,664
Well it's been said the government want MML electrification for this very reason the 222's can be converted cheaply(relatively), build all the panto's in one go to make it cheaper and then transfer to 222's steadily as electrifcation increases. Surely as soon as it goes to leicster you can convert all as all stop there so.... NR have been asked to do a study for corby first. They want to be seen to be green without doing GWML as that would cost more with infrastrucutre and stock.

You never know this in my eyes looks like quite a nice proposition for government to take up, they need green credntials in the modern world.
 

Pumbaa

Established Member
Joined
19 Feb 2008
Messages
5,022
Because current trains can't switch from 3rd rail to overheard without a total reboot whilst stopped.

It can be done of course - just not with existing new stock.

350/1s certainly can do it on the move - just not permitted.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,051
Location
Reston City Centre
So that is a minimum of say 200 miles per diagram per day under the wires which could in theory be removed. Call it 20 (Meridan) diagrams - 4000 miles per day under the wires.

It certainly adds up.

...same with the half hourly Voyagers from Birmingham to Manchester, the half hourly Voyagers from York to Newcastle, the "non Chester" Virgin services...
 

ukrob

Established Member
Joined
15 Jan 2009
Messages
1,810
Because current trains can't switch from 3rd rail to overheard without a total reboot whilst stopped.

It can be done of course - just not with existing new stock.

again not 100 % true older units can go from dc to ac with no trouble at all.

I didn't say otherwise.

Maybe I was ambiguous. SOME current stock which has been built within the last 5-10 years can not do it without shutting down and a reboot.

The POINT I was making is that the system needs designing so that it CAN be done. I didn't say it couldn't be done.
 

route:oxford

Established Member
Joined
1 Nov 2008
Messages
4,949
I do wonder if the £300M bill would be subject to a hefty discount if the jigs were going to be put to more extensive use...

Would be handy if an "off-the-shelf" HST replacement could operate as far as Reading on the cross-rail infrastructure and actually make use of the knitting. Timing would be about right too.

What happens with the Diesel engines when the unit is running under the wires? Are they kept warm with heaters? Or just as efficient to keep a few running in a cycle to supply "hotel" power?
 

asylumxl

Established Member
Joined
12 Feb 2009
Messages
4,260
Location
Hiding in your shadow
In support of ukrob's post above, I'm pretty sure (though I may be totally wrong) that the Electrostars have to stop in order to switch over, and I'd imagine that if the 22x class used the same train management system, they too would have to stop.
 

Pumbaa

Established Member
Joined
19 Feb 2008
Messages
5,022
In support of ukrob's post above, I'm pretty sure (though I may be totally wrong) that the Electrostars have to stop in order to switch over, and I'd imagine that if the 22x class used the same train management system, they too would have to stop.

You're entirely correct - they often break completely during the changeover too. Another example of high quality Derby engineering.
 

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,072
Location
Redcar
I'm 100% sure they did.

High Speed One has much higher tension in the wires than the rest of the domestic OHLE so tends to be a bit of a special case. I seem to recall someone on here (might have been OT or OLL) saying that if you raised the panto on the move it would quite possibly cause a de-wirement on most OHLE.
 

LE Greys

Established Member
Joined
6 Mar 2010
Messages
5,389
Location
Hitchin
Have to say once again that the idea is excellent. If both manufacturer and operator want it, then they should get the new vehicles built and the conversions done as soon as possible. Still, you have to wonder what took them so long.
 

cyclebytrain

Member
Joined
11 Jul 2009
Messages
311
I thought they changed whilst stationary at Ashford and Ebbsfleet?

There are peak services that don't stop at Ebbsfleet that change whilst moving (and from personal experience it really is whilst moving, not a stop without opening the doors)
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
High Speed One has much higher tension in the wires than the rest of the domestic OHLE so tends to be a bit of a special case. I seem to recall someone on here (might have been OT or OLL) saying that if you raised the panto on the move it would quite possibly cause a de-wirement on most OHLE.