This start/ed as a reply in the NW Electrification Thread, but grew too big and off topic so it's here instead now.
There has been talk in the NW Electrification threads about services overtaking at Bolton now, as you may know there is not currently facility at Bolton Staiton to be able to acceive this. So, there are a few things that could be done to alleviate this.
Platform 5:
Put Platform 5 back into use again, it wouldn't be too much effort to simply lay track and have it as a loop of platform 4, but with a bit more thought and re-modelling it could be a hell of a lot better than this.
The northern approaches from Lostock would remain broadly the same with a crossover before reaching Bolton Station. From Blackburn though I'd propose a significant change.
I'd model the station initially on the Lostock Approaches, as this sees 7tph as apposed to the 1/2 tph on the blackburn route, it would approach as 2 track with a crossover, then have the track split for platforms 4/5 and 1/3, with an additional crossover between the tracks for platforms 3 and 4. The line from blackburn would approach as it does now for platform 1, but would join into the line for platform 3, prior to the 3/4 crossover, so that services for blackburn could use platforms 1, 3 or 4. all of these being bi-directional. To the south the layout would merge pt. 1/2 into one line immediately south of pt. 2, with a similar crossover again between 3/4 before the lines merge into the unidirectional layout to the south with an additional crossover. All platforms would be unidirectional.
This brings me onto what I think is currently the biggest problem with Bolton Station, the Car Park, it's dreadfully inadequate, and re-building platform 5 would destroy it. I would propose building a new multi-storey car park close to the current station, there is plenty of land. There would be a charge for using this station, but would be discounted for rail users to a token amount, of a flat daily rate, such as 50 pence. This could be leased and contracted to NCP who would make more money from non-rail passengers.
Platform 6...?
This is a rather silly or not idea, but have another platform, with it's face against the big wall opposite platform 5, and operate it as an additional bi-directional loop for platform 5.
Trams?
Now, back in the days of the 'manchester crossrail' or whatever the hell it was called, there was an idea to have high quality trains to Bolton via Radcilffe, now there is no reason why this cannot be done with the current metrolink network, linked into the Bury Line at Radcliffe and using for most part the old permanent way to Bolton (With some on street running), including some of the disused bridges, it would need to be run around Asda and Halfords, but could then link into the current NR Network at Bolton (Tram/Train anyone?).
This could use Platform 2 that is rarely used anyway and if the station was layed out as described above would be even less used, or, run on street a bit more and have it on street level near the entrance, or even in a new pair of bay platforms at the Manchester end of 4/5 (not as hard as it sounds as Light Rail bridges are a lot easyer and bendyer then heavy rail ones, and there is enough space on the PWay to do this). There would then be able to have 8 trams per hour from Bolton and 8 Trams per hour from Bury, 3tph shuttling between (Wigan?) - Bolton - Bury - (Castleford/Rochdale?) and the existing 5tph from bury in addition to a new 5tph from Bolton to Victoria, now this sounds like a lot to push through the city zone, simple, have a couple of bays (or 4 platforms) for trams at Victoria, the lines into there can easily take 15tph (5ea from Rochdale/Oldham, Bury, Bolton), will leave that for discussion. But then I'd be wanting Metrolink to be part of ATOC...
Some more bits with less detail:
A loop at Westhaughton to enable Crescent - Walkden - Atherton - Lostock - Bolton services?
Walkden - Tyldsley - Leigh? / Wigan? new express route, trackbed is still there...
Walkden - Bolton? (Making it two 2track routes from Manchester to Bolton)
Chat Moss Line (Weaste) - Walkden
Tired fingers now, discuss.....
There has been talk in the NW Electrification threads about services overtaking at Bolton now, as you may know there is not currently facility at Bolton Staiton to be able to acceive this. So, there are a few things that could be done to alleviate this.
Platform 5:
Put Platform 5 back into use again, it wouldn't be too much effort to simply lay track and have it as a loop of platform 4, but with a bit more thought and re-modelling it could be a hell of a lot better than this.
The northern approaches from Lostock would remain broadly the same with a crossover before reaching Bolton Station. From Blackburn though I'd propose a significant change.
I'd model the station initially on the Lostock Approaches, as this sees 7tph as apposed to the 1/2 tph on the blackburn route, it would approach as 2 track with a crossover, then have the track split for platforms 4/5 and 1/3, with an additional crossover between the tracks for platforms 3 and 4. The line from blackburn would approach as it does now for platform 1, but would join into the line for platform 3, prior to the 3/4 crossover, so that services for blackburn could use platforms 1, 3 or 4. all of these being bi-directional. To the south the layout would merge pt. 1/2 into one line immediately south of pt. 2, with a similar crossover again between 3/4 before the lines merge into the unidirectional layout to the south with an additional crossover. All platforms would be unidirectional.
This brings me onto what I think is currently the biggest problem with Bolton Station, the Car Park, it's dreadfully inadequate, and re-building platform 5 would destroy it. I would propose building a new multi-storey car park close to the current station, there is plenty of land. There would be a charge for using this station, but would be discounted for rail users to a token amount, of a flat daily rate, such as 50 pence. This could be leased and contracted to NCP who would make more money from non-rail passengers.
Platform 6...?
This is a rather silly or not idea, but have another platform, with it's face against the big wall opposite platform 5, and operate it as an additional bi-directional loop for platform 5.
Trams?
Now, back in the days of the 'manchester crossrail' or whatever the hell it was called, there was an idea to have high quality trains to Bolton via Radcilffe, now there is no reason why this cannot be done with the current metrolink network, linked into the Bury Line at Radcliffe and using for most part the old permanent way to Bolton (With some on street running), including some of the disused bridges, it would need to be run around Asda and Halfords, but could then link into the current NR Network at Bolton (Tram/Train anyone?).
This could use Platform 2 that is rarely used anyway and if the station was layed out as described above would be even less used, or, run on street a bit more and have it on street level near the entrance, or even in a new pair of bay platforms at the Manchester end of 4/5 (not as hard as it sounds as Light Rail bridges are a lot easyer and bendyer then heavy rail ones, and there is enough space on the PWay to do this). There would then be able to have 8 trams per hour from Bolton and 8 Trams per hour from Bury, 3tph shuttling between (Wigan?) - Bolton - Bury - (Castleford/Rochdale?) and the existing 5tph from bury in addition to a new 5tph from Bolton to Victoria, now this sounds like a lot to push through the city zone, simple, have a couple of bays (or 4 platforms) for trams at Victoria, the lines into there can easily take 15tph (5ea from Rochdale/Oldham, Bury, Bolton), will leave that for discussion. But then I'd be wanting Metrolink to be part of ATOC...
Some more bits with less detail:
A loop at Westhaughton to enable Crescent - Walkden - Atherton - Lostock - Bolton services?
Walkden - Tyldsley - Leigh? / Wigan? new express route, trackbed is still there...
Walkden - Bolton? (Making it two 2track routes from Manchester to Bolton)
Chat Moss Line (Weaste) - Walkden
Tired fingers now, discuss.....