• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Block instrument failure on an Absolute Block line

Status
Not open for further replies.

Dieseldriver

Member
Joined
9 Apr 2012
Messages
1,019
I’m a Driver but I’ve never worked trains over AB lines. In the S5 module of the rule book, it states that one of the occasions you may proceed at up to 50mph after passing a signal at danger with authority is during a failure of a block instrument on an Absolute Block line.
Obviously I understand how AB lines operate, I’m just curious as to why you are permitted to travel at up to 50 in that circumstance rather than at caution.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

bengley

Established Member
Joined
18 May 2008
Messages
1,987
Without checking the signallers' rule book for AB I'm assuming there will be other safeguards in place between signaller A and signaller B.

Some AB sections can be many miles long (20+ in some places) so it's not something you'd want to be doing at caution.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,087
Location
West Wiltshire
Without checking, the key is the words with Authority
From memory wouldn't be given authority unless can proceed to next home signal (plus its overlap)

Clearly not going to be told to proceed at max 50mph if can't clear the signals as there is something unknown ahead, eg wires down where tree might have fallen.
 

cin88

Member
Joined
16 Oct 2015
Messages
273
Location
WCML
If the line ahead is clear to the clearing point of the box in advance and said box has therefore accepted you then there's no need for a caution. You're simply passing the section signal at danger due to it being held by the block instrument being stuck at "Train on Line". The fault is simply with the Block Instrument rather than anything to do with the signals or track.
 

Ken H

Established Member
Joined
11 Nov 2018
Messages
6,718
Location
N Yorks
If the block instruments fail but the bell works that can do. Or if there is a telephone that can be used to keep the block system going. Only if there is no communication between the boxes do they resort to time interval working, but that comes with a severe restriction that the driver must drive within what he can see.
 

Llanigraham

On Moderation
Joined
23 Mar 2013
Messages
6,487
Location
Powys
Althought the Block Instrunent might have failed (hopefully) the bells will still work, so before you will be allowed to pass the Section signal the signaller will know that the section is clear up to the clearing point of the Home signal at the next Box. Therefore your 50mph speed is perfectly safe.
We went through a whole spate of these on the Down from Bromfield to Woofferton Junct and no matter what S & T did it kept re-occuring. Eventually newer bits were acquired from the Severn Valley. The fault didn't re-occur before I retired.

It gets more "fun" when the bells fail as well, then everything is done over the phone and very carefully recording in the TRB. And yes we had that once!
 

Ken H

Established Member
Joined
11 Nov 2018
Messages
6,718
Location
N Yorks
Althought the Block Instrunent might have failed (hopefully) the bells will still work, so before you will be allowed to pass the Section signal the signaller will know that the section is clear up to the clearing point of the Home signal at the next Box. Therefore your 50mph speed is perfectly safe.
We went through a whole spate of these on the Down from Bromfield to Woofferton Junct and no matter what S & T did it kept re-occuring. Eventually newer bits were acquired from the Severn Valley. The fault didn't re-occur before I retired.

It gets more "fun" when the bells fail as well, then everything is done over the phone and very carefully recording in the TRB. And yes we had that once!
Isnt there the possibility of using a public phone too?
 

The Lad

Member
Joined
22 Jan 2015
Messages
408
Mmm, I have a recollection of using a coinbox phone to do just that, albeit on staff and ticket.
Long into history!
 

CAF397

Member
Joined
15 Sep 2010
Messages
1,095
Location
Lancashire
It was explained to me that it's an old rule regarding block failure, that the line side telegraph poles could've fallen on the railway. The 50mph restriction was a safety restriction.
 

rower40

Member
Joined
1 Jan 2008
Messages
579
If the lineside poles are already down, then running a train into them (especially a steam-loco-hauled train - bear in mind when these rules were written!) isn't going to cause a huge host of EXTRA work...
 

Ashley Hill

Established Member
Joined
8 Dec 2019
Messages
5,585
Location
The West Country
I don't recall seeing it in the Rule Book, nor being taught it at Signalling School, nor it ever being mentioned at the Quarterly Briefing tests.
I seem to remember it was still referred to I the 1988 rule book. Mainly to do with train failure and passing signals at danger.
 

Tomnick

Established Member
Joined
10 Jun 2005
Messages
5,933
My understanding is that it's a relatively recent change recognising that there's still a form of mitigation in that the Absolute Block mode of signalling will still be being observed between the two signallers (either by bell or by phone), and thus less risk of a train inadvertently being let into an occupied section.

There's still a risk of talking one past the section signal without the permission of the box in advance and/or with the previous train still in section, and presumably 50mph was chosen so as to still provide sufficient mitigation against this risk.

That said, in my experience, the block "failure" is more often than not merely a symptom of another fault!
 

Efini92

Established Member
Joined
14 Dec 2016
Messages
2,137
I’m a Driver but I’ve never worked trains over AB lines. In the S5 module of the rule book, it states that one of the occasions you may proceed at up to 50mph after passing a signal at danger with authority is during a failure of a block instrument on an Absolute Block line.
Obviously I understand how AB lines operate, I’m just curious as to why you are permitted to travel at up to 50 in that circumstance rather than at caution.
I think 50 is the magic number for degraded working. Not sure why they say 50 for TBW or SLW in the wrong direction either.
 

Sunset route

Established Member
Joined
27 Oct 2015
Messages
1,224

Didn’t that disappear from the rule book in the 1990s?

I don't recall seeing it in the Rule Book, nor being taught it at Signalling School, nor it ever being mentioned at the Quarterly Briefing tests.

I seem to remember it was still referred to I the 1988 rule book. Mainly to do with train failure and passing signals at danger.

I was taught “Time Interval Working” when I was at signalling signalling school in 1989 and I believe it was removed from the Signalling Regulations by 1992/93.
 

MK88

Member
Joined
6 Oct 2022
Messages
5
Location
Cornwall
Without checking, the key is the words with Authority
From memory wouldn't be given authority unless can proceed to next home signal (plus its overlap)

Clearly not going to be told to proceed at max 50mph if can't clear the signals as there is something unknown ahead, eg wires down where tree might have fallen.
Incorrect. A block failure has nothing to do with something unknown ahead. Most of the time it's either some cut cables, stolen cables, or some cleaning needing to be done inside the block instrument.

Axle Counter Failure, TC Failure or Signalling failures are different to what the OP has said.
 
Status
Not open for further replies.

Top