I have occasion to drive through mid-Wales quite often, and for the last 8 months or so, there have been some traffic lights next to a new automated barrier and equipment at Caersws. And never any workmen.
And sometimes you get a collision of lights then barrier timings causing big tailbacks on the main trunk road through mid-Wales.
While grumbling about them to someone in Aber, they told me about big facebook group about these lights.
Bear with me - the full magnitude of Network Rail law-flouting must be fully understood to be believed!
Anyway, someone had posted in that group a report from the local paper which suggested the lights were permanent, because Network Rail had illegally sited a barrier and permanent portakabin of equipment. Due to reduced visibility for traffic joining the main road, there had been a nasty accident, and the police said that the barrier and portakabin were sited without consideration of this.
I couldn't believe it was true. So finally, after lots of chasing, I've just spoken to the chief of highways in this area. She sounded exhausted of being asked this same question - at first I think she thought I was from the press, because she said "and can you tell you colleagues that when they write about this, it is NOT our fault". When I explained I was just an irate motorist, she then went on to say that basically, they had tried to reason with Network Rail, but apparently, Network Rail can do what the hell they want, when and where they want. It sounds like it's cost the council £1000's so far, and for all intents and purposes, these temporary lights on the main trunk road are now permanent, Network Rail won't pay anything towards them, no one even consulted with the highways agency before the work started, and Network Rail have just given the council a big "screw you" in reply. (I hasten to add that weren't her exact words!).
Does anyone else think this is just wrong in the extreme? It appears that there really is nothing that can be done - the upheaval of moving a control equipment shed that some pillock plonked in the line of view of a main road is apparently too much. So we all have to suffer ad infinitum.
Oh, and do you want to know the best part? It appears that this is the same Siemens system which has been so unreliable in Germany, and is so fully automated that a person still needs to be employed to get out of a box and push a button, the only difference being that the barriers close 5 minutes before the train, instead of the old 2 minutes.
Bravo. Money well spent there.
Wrong kind of planning on the line?
By the way, if anyone knows more on this, I'd love to know. I want to get more media involved in this.
And sometimes you get a collision of lights then barrier timings causing big tailbacks on the main trunk road through mid-Wales.
While grumbling about them to someone in Aber, they told me about big facebook group about these lights.
Bear with me - the full magnitude of Network Rail law-flouting must be fully understood to be believed!
Anyway, someone had posted in that group a report from the local paper which suggested the lights were permanent, because Network Rail had illegally sited a barrier and permanent portakabin of equipment. Due to reduced visibility for traffic joining the main road, there had been a nasty accident, and the police said that the barrier and portakabin were sited without consideration of this.
I couldn't believe it was true. So finally, after lots of chasing, I've just spoken to the chief of highways in this area. She sounded exhausted of being asked this same question - at first I think she thought I was from the press, because she said "and can you tell you colleagues that when they write about this, it is NOT our fault". When I explained I was just an irate motorist, she then went on to say that basically, they had tried to reason with Network Rail, but apparently, Network Rail can do what the hell they want, when and where they want. It sounds like it's cost the council £1000's so far, and for all intents and purposes, these temporary lights on the main trunk road are now permanent, Network Rail won't pay anything towards them, no one even consulted with the highways agency before the work started, and Network Rail have just given the council a big "screw you" in reply. (I hasten to add that weren't her exact words!).
Does anyone else think this is just wrong in the extreme? It appears that there really is nothing that can be done - the upheaval of moving a control equipment shed that some pillock plonked in the line of view of a main road is apparently too much. So we all have to suffer ad infinitum.
Oh, and do you want to know the best part? It appears that this is the same Siemens system which has been so unreliable in Germany, and is so fully automated that a person still needs to be employed to get out of a box and push a button, the only difference being that the barriers close 5 minutes before the train, instead of the old 2 minutes.
Bravo. Money well spent there.
Wrong kind of planning on the line?
By the way, if anyone knows more on this, I'd love to know. I want to get more media involved in this.
Last edited: