northwichcat
Veteran Member
A while back I suggested a Blackpool to London service could take the form of a Blackpool-Bolton-Manchester Airport-London service and in the past few days someone else suggested Blackpool-Wigan-Liverpool-Crewe-London. Both times the criticism against such ideas is the end to end times would be longer than changing at Preston. However, what's not been taken in to consideration is who would use the service.
When the long intercity services used to run between Blackpool and London they were seen as non-economically viable as few business travellers travelled between Blackpool and London and the only time they were well used was during political conferences.
Then NWT introduced a 158 operated service, which had mainly standard class, obviously operated at 90mph top speed (compared to the 110mph that Virgin services had at the time) and followed a less direct route with more stops. These proved popular and were only withdrawn due to Virgin applying for competition protection. The services were due to be upgraded to larger class 180 trains.
Now if the main traffic is holiday makers they'll probably prefer a direct train taking a longer time over changing, while if it's business travellers they'll prefer the fastest journey time. I can't see there being much of a business market for London to Blackpool, so is the fast direct train really the best option or would using a less direct route and giving places such as Bolton a direct London service work out better overall?
When the long intercity services used to run between Blackpool and London they were seen as non-economically viable as few business travellers travelled between Blackpool and London and the only time they were well used was during political conferences.
Then NWT introduced a 158 operated service, which had mainly standard class, obviously operated at 90mph top speed (compared to the 110mph that Virgin services had at the time) and followed a less direct route with more stops. These proved popular and were only withdrawn due to Virgin applying for competition protection. The services were due to be upgraded to larger class 180 trains.
Now if the main traffic is holiday makers they'll probably prefer a direct train taking a longer time over changing, while if it's business travellers they'll prefer the fastest journey time. I can't see there being much of a business market for London to Blackpool, so is the fast direct train really the best option or would using a less direct route and giving places such as Bolton a direct London service work out better overall?
