SodTheDrummer
Member
I don't know about anyone else, but I love seeing a 30 year old southern cast off train (319) passing through Bolton! Something with a pan!! Can't wait for the new stock when it eventually arrives.
Thought the 323's were going to West Midlands?Are the 323s likely to go on the bolton line or will they stick to the glossop/hadfield,south manchester and liverpool chat moss lines?
The West Midlands are getting rid of them in exchange for 350's & Aventra's. Their only realistic home is with Northern.Thought the 323's were going to West Midlands?
The West Midlands are getting rid of them in exchange for 350's & Aventra's. Their only realistic home is with Northern.
Slightly off topic to this thread I know, but a bit strange they have not been repainted in the new livery.
Slightly off topic to this thread I know, but a bit strange they have not been repainted in the new livery.
I think the 769's will struggle more off the overhead.As there’s been discussions about the 319s hardly stunning performance, will they actually get anywhere near 100mph on the Preston - Bolton - Manchester route?
I think the 769's will struggle more off the overhead.
I think the 769's will struggle more off the overhead.
As there’s been discussions about the 319s hardly stunning performance, will they actually get anywhere near 100mph on the Preston - Bolton - Manchester route?
Were you on a stopping service or on the Blackpool express that Northern insist on sticking 319's on?Think people need to get out on the Bolton line an experience the 319s for themselves. Those speaking of sluggish driving or slow traction, well not that I've experienced, we absolutely flew down there!
100mph on the Bolton line is 100mph, wherever the train is going from or to. If they are maintained and driven properly, the 319s will do 100mph, (linespeed permitting).Were you on a stopping service or on the Blackpool express that Northern insist on sticking 319's on?
I think the issue is that on a stopping service they might not have time to reach 100mph before having to slow down for a station.100mph on the Bolton line is 100mph, wherever the train is going from or to. If they are maintained and driven properly, the 319s will do 100mph, (linespeed permitting).
Surely the question is, do 319s accelerate faster or slower than the 150s they are replacing?I think the issue is that on a stopping service they might not have time to reach 100mph before having to slow down for a station.
Surely the question is, do 319s accelerate faster or slower than the 150s they are replacing?
I wonder if those instructions will be modified once new timetables come out realising the potential of these units? At the moment, pushing harder will only mean more waiting time en route.Yes, significantly, but not if driven as Northern instruct their drivers to.
Transpennine bi-modes will eventually make that journey, presumably in electric mode as far as Victoria.Will there be any planned EMU services from Deansgate to Man Vic or is that just for diversions ECS's etc
Transpennine bi-modes will eventually make that journey, presumably in electric mode as far as Victoria.
Yes, significantly, but not if driven as Northern instruct their drivers to.
The issue discussed in the 319 thread was that they take a long distance to reach 100mph. 80-100mph performance is poor apparently.
When TPE 350s were replaced by Northern 319s on the Manchester - WNW route, on my GPS I never saw a 319 reach 100mph on the WCML. The 350s had no problem, their acceleration all the way to 100+mph was very impressive, although they are 110mph units of course.
The first Virgin Class 390 empty stock movement (electric-powered) via Bolton operated earlier this afternoon, 5P93 Longsight to Blackpool North.
http://www.realtimetrains.co.uk/train/O86944/2019/02/28/advanced
Not the best of days for photographs unfortunately. Operated by 11-car 390115.