Blackpool - Manchester Electrification

Status
Not open for further replies.

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,594
Location
Nottingham
Classy shots as always, thank you.

They reinforce my puzzlement why the crossing was closed for months until the bridge opened. The bridge is offset by several yards from the crossing, as can clearly be seen from a number of shots. The fine precedent for minimal pedestrian disruption was set by the new footbridge between Kearsley station and Farnworth tunnel, where the crossing remained open throughout preparation and building work.
Sometimes the crossing is deemed to be high risk and closed because with replacement imminent it's not worth implementing any special mitigations. However from this (very comprehensive) set of photos the sighting distances, which are the main thing driving the risk assessment, don't look to be a problem.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

reg

Member
Joined
15 Mar 2015
Messages
70
Location
Bolton
Bolton-new masts installed either side Trinity St bridge (platform 4) prep work seen north of Newport St. difficult area, including new scrapes and rebar cages waiting installation.
 
Last edited:

bramling

Veteran Member
Joined
5 Mar 2012
Messages
20,310
Location
Hertfordshire / Teesdale
I was struck by the windswept unwelcome look of Blackpool north despite all that money spent

That will go nicely with the unwelcoming and hostile station staff there. One presumes the modified station will keep the notorious doors.

Over the last few years Blackpool really has managed to provide a horribly unwelcoming atmosphere for people arriving by train.
 

tom1649

Member
Joined
5 Jul 2010
Messages
989
That's why I always take the slower route to Blackpool South. Blackpool North has a very unhappy feel to it.
 

Elecman

Established Member
Joined
31 Dec 2013
Messages
3,567
Location
Lancashire
That will go nicely with the unwelcoming and hostile station staff there. One presumes the modified station will keep the notorious doors.

Over the last few years Blackpool really has managed to provide a horribly unwelcoming atmosphere for people arriving by train.

Yes no alterations have been carried out to the building at all.
 

42626

Member
Joined
9 May 2011
Messages
130
Location
Horwich
Classy shots as always, thank you.

They reinforce my puzzlement why the crossing was closed for months until the bridge opened. The bridge is offset by several yards from the crossing, as can clearly be seen from a number of shots. The fine precedent for minimal pedestrian disruption was set by the new footbridge between Kearsley station and Farnworth tunnel, where the crossing remained open throughout preparation and building work.

Apart from this, my other gripe was that NR applied for Bolton Council to close the footpath and proceeded to do nothing for so long that the council notice actually expired months later and had to be extended - they still took ages to start anything, then once it was complete it still remained closed.
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,853
Location
Beeston (Notts)
GSoP Post 4.0
Manchester Victoria - Preston; State of Play, week beginning 30th April 2018.


All mileages from Manchester Victoria. Bridge mileages are approximated where noted.

1. Man Vic Station (West End) - Man Vic West Jct - Deal Street Jct; 0m 0ch to 0m 32ch
Fully wired 2013-15.

2. Deal Street Jct - Salford Central (East End); 0m 32ch to 0m 59ch
Fully masted, wired half way as overlap.

3. Salford Central; 0m 59ch
Fully masted, most SPS (Small Part Steelwork e.g. dangly bits) up. No wires.

4. Salford Central (West End) - Windsor Bridge South Jct; 0m 59ch to 1m 46ch
All bases in place, mostly with masts, no wires.

5. Windsor Bridge South Jct - Windsor Bridge North Jct (inc. Salford Crescent); 1m 46ch to 1m 70ch
No wires. No bases in Salford Crescent P2, though Orangemen were out & about spraying fresh paint on the small retaining wall on April 23rd; these may be potential positions for new masts, huzzah!
Both tracks to the east of Salford Crescent (the Up & Down Bolton thru P1, and the Up Bolton immediately to the east of that) are completely bedanglied through the station.
S Jct looks ready for wiring, but mast gaps still present at N Jct. Lots of SPS up immediately north of Salford Cres.; all stalactites up beneath the bridge at the south end on all lines.

6. Windsor Bridge North Jct - Clifton (South End); 1m 70ch to 4m 57ch
Many bases in place, some with masts, no wires.
At Pendleton (the Old Station site), just north of Broughton Rd Bridge (2m 26ch), the Pendleton retaining wall has been cut back in several places to make room for bases (which are all now in).
Between Frederick Rd & Broughton Rd (2m 26ch) bridges, most masts are up, except on the "problem bases" around Broughton Rd. The 3 bases, between Broughton Rd Bridge & Cockrobin Bridge (approx. 2m 51ch) have all now been driven home.
The "problem base" north of Cockrobin Bridge may be a TTC (Twin Track Cantilever) on the s'bound side (see photo A020m).
Dangly bits up near Agecroft, but no work on missing bases in the walled stretch north of Agecroft Rd.
Structure going up between Agecroft Rd bridge and Clifton, nr Lumns Lane.
Lot of masts with SPS up on the southern approach to Clifton.

7. Clifton Station; 4m 57ch
All bases in place, 1 boomed TTC, no wires. SPS up on the TTC.

8. Clifton (North End) - Kearsley (South End); 4m 57ch to 7m 57ch
Most/all bases in place, large no. of masts, no wires.
Concrete slab base curing north of the former Dixon Fold station site (around the new footbridge, approx. 6m 00ch); most/all masts up there, with lots of stovepipes up.

9. Kearsley Station; 7m 57ch
All bases in place, no masts, no wires.

10. Kearsley (North End) - Farnworth (South End); 7m 57ch to 8m 31ch
All masts (almost all with booms), no wires. Dangly bits starting to appear at the Kearsley end. Farnworth tunnel (8m 25ch) has all its registration arms in place.

11. Farnworth Station; 8m 31ch
All bases in place, 1 or 2 masts, no wires.

12. Farnworth (North End) - Moses Gate (South End); 8m 31ch to 9m 06ch
A pair of bases & squat masts are up between Farnworth Station footbridge and Rawson St Bridge (approx. 8m 44ch).
Fully boomed and partially bedanglied TTCs up between Rawson St & the Balustraded Bridge (approx. 8m 56ch).
The Gravity "Base of the century" just south of the Squeeze Belly Entry footbridge (approx. 8m 67ch) is now curing away nicely, with shuttering removed.

13. Moses Gate Station; 9m 06ch
Fully masted, no wires

14. Moses Gate (North End) - Bolton (South End); 9m 06ch to 10m 50ch
Many bases, many masts, no wires. SPS and Tensorex drums appearing on some masts/cantilevers around Burnden Jct (10m 09ch). Weston St to Moses Gate looks almost ready for wiring.

15. Bolton Station; 10m 50ch
Many bases, some masts; P1 & P5 among them. New bases have gone in at the NW end of P3. The TTC up over P1/2 has now been bedanglied. Platforms 98% open to public; the 2% not open is a fenced-off section of canopy support to the right of signal "MP9239". P2 buffers look finished. Canopies look complete.

16. Bolton (North End) - Lostock (South End); 10m 50ch to 13m 52ch
More masts (approx. 11, with 2 more awaiting installation) up between Bolton Stn and Newport St bridge; Newport St bridge has now had studs/brackets of some kind drilled in.
Bullfield Tunnels bedanglied throughout, with 2 concrete gravity pad foundations at the southern end (one of which is masted) Just north of those, a 3rd base is currently curing. Aerial Earth Wire (AEW) brackets up in both tunnels. Cable ducting troughs laid between New St & Black Horse St on the Down side, in the cess.

Also, masts (including 2 TTCs) and bases in place on the line to Blackburn as far as Bradshawgate Tunnel.

Most masts up around Dean Clough Bridge (12m 26ch), with cantilever assembles affixed (and folded out of place). 2 "failed" driven pile bases on the southbound side now have formwork for concrete gravity pad replacements in position, awaiting the concrete pour.

Just south of Lostock, outstanding short, fat bases are being driven, augered out, rebarred and then concreted; this process is also being used on the overrun for the Wigan lines, via Lostock Jct (13m 39ch). Masts are starting to appear immediately south of Lostock; at the extreme southern end of the station, a twin track portal with SPS has been erected. 3 "failed" protruding, uncapped pile bases are on the Wigan Line; one assumes that gravity pad replacements will eventually be in the offing.
A UTX has been installed in the "vee" in Lostock Jct, for buried service access.
Work currently going on with stacks of cable ducting on the Wigan Line - possibly from the substation?

17. Lostock Station; 13m 52ch
Some bases in place, no masts, no wires. Switchgear box delivered 6th April '18.

18. Lostock (North End) - Horwich Pkwy (South End); 13m 52ch to 15m 50ch
Two more UTXs have been installed in the "vee" between the two lines, to the north of the station.
For a mile between the stations, all wires up from the "Golf Course" Footbridge (approx. 14m 04ch) to half a mile south of Horwich Pkwy. All masts appear to be in place with SPS for the remaining sections between the two, including the A6027/De Havilland Way overbridge, which now has dangly bits mounted on the walls.

19. Horwich Parkway Station; 15m 50ch
Some bases in place, no masts, no wires.

20. Horwich Pkwy (North End) - Blackrod (South End); 15m 50ch to 17m 14ch
All bases in place, mostly with masts. Earth/AT wires linking 9 masts together between the 2 stations, heading north (on the Up side) from immediately north of the M61 bridge (approx. 16m 29ch). 5 short lengths of earth & AT wiring (3 on the Up, 2 on the Down; none linking more than 10 masts) between Horwich and Buckshaw. SPS appearing on portals near Blackrod. Work has stopped on the footbridge that will replace Red Moss foot crossing.

21. Blackrod Station; 17m 14ch
Some more bases in place, no masts, no wires. Empty mast base at the southern end (not the northern end, as was writ in error).

22. Blackrod (North End) - Adlington (South End); 17m 14ch to 19m 15ch
Lots of masts up just north of Blackrod. Some base replacement work occurred over 17th/18th Feb to replace failed bases. Successful bases have masts up with SPS on.

23. Adlington Station; 19m 15ch
Some bases in place, 1 mast up (Down side), no wires.

24. Adlington (North End) - Chorley (South End); 19m 15ch to 22m 20ch
2 short stretches of wire on the s'bound track.
Bespoke mast fixings going up on Yarrow Viaduct (21m 26ch at the southern end); 3 of the 4 are in place. The southern pair are now in; work on the northern pair has stopped after the alleged discovery of large void within the structure.

25. Chorley Station; 22m 20ch
Some bases in place, no masts, no wires.

26. Chorley (North End) - Buckshaw Pkwy (South End); 22m 20ch to 24m 39ch
Many bases, some masts, 1 or 2 wires. Roof brackets affixed in Chorley Tunnel (23m 20ch to 23m 25ch), and at least 6 dangly bits/SPS are up in the Flying Arches cutting. All bases on top of the retaining wall at the northern are mastless.

27. Buckshaw Parkway Station; 24m 39ch
Some bases in place, 2 masts up (both on Down side), no wires.

28. Buckshaw Pkwy (North End) - Euxton Jct; 24m 39ch to 25m 31ch
Almost fully masted; about half the wires up until halfway to Euxton, then fully wired the rest of the way.

Do let me know if I've missed anything!
 
Last edited:

The_Engineer

Member
Joined
24 Mar 2018
Messages
524
I see that the Preston to York trains are now starting back at Blackpool North from today. That's now 2 trains per hour between Preston and Blackpool North.
 

superkev

Established Member
Joined
1 Mar 2015
Messages
2,856
Location
west yorkshire
There's 2 new YouTube videos from paul Wilkinson showing cab rides from Blackpool north to kirkham and kirkham to preston.
I was struck by the windswept unwelcome look of Blackpool north despite all that money spent and the fairly low line speeds although perhaps I missed some signs. Is 70mph the maximum?
K
Apart from my disappointment with Blackpool north station facilities watching the cab rides again unless I've missed something it seems little opportunity has been taken to increase the line speeds despite the new signalling and flat mostly straight line to Preston. Looks to me like 70max with some 50's and 60's and a slow 35 through Poulton. Have I missed something.
K
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,594
Location
Nottingham
I wasn't aware that the Emergency TSR boards were known as "Daleks" too! The GSoP has been altered to say UTX alone.
The gadgets in the power stations that automatically open (or used to) the doors on MGR coal hoppers are/were also known as Daleks.
 

deltic08

On Moderation
Joined
26 Aug 2013
Messages
2,898
Location
North
59CosG95, or anybody, can you explain what a stovepipe is please as fitted between Clifton and Kearsley?
 
Last edited by a moderator:

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,228
A stovepipe is the vertical round or square section tube coming down from a cantilever or portal, usually with the insulator and registration arm mounted horizontally from it. Not considered small part steelwork AFAIK. Some stovepipes extend upwards to carry other wires (such as autotransformer feeders) if they are not mounted directly on extended uprights.

Some drawings use the term ‘drop tube’ - probably the correct term with stovepipe being more of a nickname.
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,457
Location
Preston Lancs
A stovepipe is the vertical round or square section tube coming down from a cantilever or portal, usually with the insulator and registration arm mounted horizontally from it. Not considered small part steelwork AFAIK. Some stovepipes extend upwards to carry other wires (such as autotransformer feeders) if they are not mounted directly on extended uprights.

Some drawings use the term ‘drop tube’ - probably the correct term with stovepipe being more of a nickname.

Photos later
 

LDECRexile

Established Member
Joined
30 Jan 2014
Messages
2,149
Location
Southport, UK
Apart from my disappointment with Blackpool north station facilities watching the cab rides again unless I've missed something it seems little opportunity has been taken to increase the line speeds despite the new signalling and flat mostly straight line to Preston. Looks to me like 70max with some 50's and 60's and a slow 35 through Poulton. Have I missed something.
K

One thing you may have missed is the 90 degree bend on which Poulton-le-Fylde stands. As most trains stop there anyway I think raising the speed limit above 35 mph there would be a challenge.

http://maps.nls.uk/geo/explore/#zoom=14&lat=53.8461&lon=-2.9905&layers=1&b=1

A second thing you may have missed is that raising the line speed by much west of Poulton would be of little benefit as there is a dead end at Blackpool and a level crossing between. Gralistair and I travelled the route together today and agreed that this section felt quicker than before, but we make no claim that this was scientific.

Finally, as mentioned in recent discussions upthread, raising the line speed from Fylde Junction to Poulton approaches to (say) 85 instead of (I think) 75 looks and sounds a lot, but in fact it would shave only about a minute off the journey time, which would be worthwhile if it cost nowt, but I fear it wouldn't. Raising the speed through Kirkham and Wesham from approx. 30 mph (I don't know exactly what it was) to 70 or 75 will save much more than that. As a general rule of thumb, if you want to go faster, don't go slower.

Gralistair has some sample calculations which show the effects of raising speeds by different amounts, they are striking and counterintuitive. He may get a chance to post them.
 

driver9000

Established Member
Joined
13 Jan 2008
Messages
4,556
The use of the word DALEK is duplicating its other railway use.
DALEK is used to denote an Emergency Speed Restriction indicator.

That's a slang term, their real name is Emergency Speed Indicator so it's not really a duplication in terminology.
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,457
Location
Preston Lancs
Gralistair has some sample calculations which show the effects of raising speeds by different amounts, they are striking and counterintuitive. He may get a chance to post them.

I will post later but meanwhile I will use a reductio ab absurdio approach. I will simplify without being condescending. 60 mph is 1 mile in 60 seconds. 120 mph is 1 mile in 30 seconds. 20 mph is 1 mile in 180 seconds. 30 mph = 1 mile in 120 seconds and 40 mph is 1 mile in 90 seconds. So if you increase from 20 to 30 mph ( usually low cost ) you save 60 seconds. Whereas if you go from 60 mph to 120 mph ( usually horrendous cost) you only save 30 seconds. All the time savings come from spending relatively small amounts of money to raise the very slow speed limits NOT increasing high speeds to even higher speeds.
 

driver_m

Established Member
Joined
8 Nov 2011
Messages
2,248
Exactly You could make mega savings by raising the speed to 15 or 20 in Birmingham New St from its present 10. But the non existent overlaps kind of prevent that. And you also need sustained stretches of straight rail to make a big difference such as on the WCML. What would enable the eastern stretches of the route though, to get the speed up to say 85-90mph?
 

LDECRexile

Established Member
Joined
30 Jan 2014
Messages
2,149
Location
Southport, UK
I've received a load more photos from Gralistair and an interesting one from Reg.

I've added Reg's to his album here:

https://www.flickr.com/photos/127646831@N03/albums/72157671732263863

and Gralistair's to his album here:

https://www.flickr.com/photos/127646831@N03/albums/72157651259517065

I've added them all to the Combined Volume here:

https://www.flickr.com/photos/127646831@N03/albums/72157661069863633

Graham's shots A084h and A084g are clear examples of "stovepipes" as discussed recently.
 
Last edited:

deltic08

On Moderation
Joined
26 Aug 2013
Messages
2,898
Location
North
Thank you all for the explanation of stovepipe.
I think the planners have been very conservative with linespeeds between Blackpool and Preston when linespeed between Manchester and Preston will be 90mph. Electric trains can accelerate one mph per second so after one minute are travelling 60mph. Switches at Blackpool station throat appear to 50 mph from the new cab video so trains can leave on max power and easily accelerate to 90mph before slowing for Poulton regardless of level crossings. There are level crossings on 100mph+lines so what is different about this one?
I was told by experts looking at Ripon-Harrogate reinstatement that to prepare for 90mph linespeed was relatively easy but for 100mph was more difficult and much more costly. Even through Kirkham the curvature is easy and Salwick in one direction.
When Pacers are replaced and electrics replace 156s the slowest trains will be 90mph 158s on the Blackpool-Yorks. Maybe increased to 90mph then.
 
Last edited by a moderator:

LeylandLen

Member
Joined
28 Oct 2013
Messages
779
Location
Leyland Lancs
Paul Wilkinson has just added the return journey from Preston to Blackpool North...


Thanks for that. I am able to run the videos at double speed , so the run is very impressive!
one thing I noticed about BPN. The canopies over the platforms have not been extended. Unfortunately it does rain in Blackpool and the wind can blow a bit coming off the sea. No doubt its all done to cost; such is life !!!
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,853
Location
Beeston (Notts)
Thanks for that. I am able to run the videos at double speed , so the run is very impressive!
one thing I noticed about BPN. The canopies over the platforms have not been extended. Unfortunately it does rain in Blackpool and the wind can blow a bit coming off the sea. No doubt its all done to cost; such is life !!!
I suspect that a total rebuild of the station would have made the project even costlier, with a longer total closure and more risk of going over-budget/running late etc....
One shudders to imagine how up in arms the residents would be if their station was closed for all of 2018, if not part of 2019 too, to rebuild the station completely!
 