Blackpool - Manchester Electrification

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

HowardGWR

Established Member
Joined
30 Jan 2013
Messages
4,981
Seats installed between Platforms 2 and 3, towards Bolton southern end.
I see that NR are still installing bum freezer seats - pity. At least these under the canopy won't be wet, as well, when it rains.
Thanks for all your photos and those of colleagues.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,597
Location
Nottingham
Until I saw the mast just beyond the signal in these shots:

https://www.flickr.com/photos/127646831@N03/39780904915/in/album-72157661069863633/
https://www.flickr.com/photos/127646831@N03/40634074562/in/album-72157661069863633/

I thought exactly what you say, but that mast has me baffled. What job will it do in that position?
"No wires beyond the signal" may actually mean "suitable for electric trains to run up to the signal but not beyond". So the first mast beyond the signal will locate the wires above the track before the signal, and after that the wires will dive off to one side to terminate on another mast - possibly the next one visible on that shot, although I don't see any sign of a backstay.
 

themiller

Established Member
Joined
4 Dec 2011
Messages
1,380
Location
Cumbria, UK
"No wires beyond the signal" may actually mean "suitable for electric trains to run up to the signal but not beyond". So the first mast beyond the signal will locate the wires above the track before the signal, and after that the wires will dive off to one side to terminate on another mast - possibly the next one visible on that shot, although I don't see any sign of a backstay.
Just a suggestion, but could there be another mast to plant where the black plastic sheet is to take the end of the wire run? It looks like there's a foundation to the left of it (stud bolts just sticking up) if you zoom in.
 

LDECRexile

Established Member
Joined
30 Jan 2014
Messages
2,149
Location
Southport, UK
Post #6447, which is from a very strong source, explicitly says no wires beyond the signal, hence no gap after the current most northerly base, which is more or less opposite the end of the coffee bar. Please look to the left of the train here:

https://www.flickr.com/photos/127646831@N03/40634074042/in/album-72157661069863633/

Posts #6450, #6453 and #6454 state or imply that there is to be a wire over the P1 line beyond the signal, for whatever purpose - trailing off, giving overlap or whatever.

If #6447 is as it reads, then what is the purpose of the mast north of the bridge just beyond the signal, standing next to the Platform 1 line? (and the possible base beyond that as pointed out in #6454?)
If #6450, #6453 and #6454 are onto something, then how will the wire get from the "Coffee Bar" mast-to-be to the mast just beyond the signal? This question arises because to my lay eyes 1. the distance is long and 2. there is a heck of a curve, which would seem to take a straight wire up against the bridge side.

As always, I ask out of naivete and puzzlement.
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,853
Location
Beeston (Notts)
Post #6447, which is from a very strong source, explicitly says no wires beyond the signal, hence no gap after the current most northerly base, which is more or less opposite the end of the coffee bar. Please look to the left of the train here:

https://www.flickr.com/photos/127646831@N03/40634074042/in/album-72157661069863633/

Posts #6450, #6453 and #6454 state or imply that there is to be a wire over the P1 line beyond the signal, for whatever purpose - trailing off, giving overlap or whatever.

If #6447 is as it reads, then what is the purpose of the mast north of the bridge just beyond the signal, standing next to the Platform 1 line? (and the possible base beyond that as pointed out in #6454?)
If #6450, #6453 and #6454 are onto something, then how will the wire get from the "Coffee Bar" mast-to-be to the mast just beyond the signal? This question arises because to my lay eyes 1. the distance is long and 2. there is a heck of a curve, which would seem to take a straight wire up against the bridge side.

As always, I ask out of naivete and puzzlement.
It could be that the mast that's bagged over (as stated in #6454) won't be the only fixture for OLE; I wouldn't be surprised if they didn't drill a cantilever in the retaining wall behind the sign in picture 9680k. That would keep the wires in alignment.
Thus, the sign would only imply that electric trains couldn't run north from P1 at this stage, with the overrun being provided in case of a braking fault and a unit becoming stranded.
Of course, Joseph_Locke knows better than I do with regards to this specific project, so I'm willing to be corrected here.
 

wrinkley

Member
Joined
6 Feb 2015
Messages
130
Reg's photos have arrived as promised. I've added them to his album here:

https://www.flickr.com/photos/127646831@N03/albums/72157671732263863

I went by train from Southport to Salford Crescent and back today, stopping off at Bolton.

Action on the overlap onto the Wigan line. All bar two bases are now driven into the ground, several have masts.
Orangemen and yellow kit in action on the ziggurat at Lostock.
Masts towards Blackburn, as Reg says, but this exposes a suspected base gap opposite Bolton Platform 1, northern end, please see photo captions.
Re. the missing mast, is it possible that the wires will be attached to the underside of Trinity Street bridge?
 

LDECRexile

Established Member
Joined
30 Jan 2014
Messages
2,149
Location
Southport, UK
Yesterday I reported that "5 TTCs in place between the station footbridge and Rawson St, Farnworth, making that section look fully masted. Rawson St to Balustraded bridge baseless as far as I could see." Wrinkley has pointed out that I'm back to front, I should have written "5 TTCs in place between Rawson St and the Balustraded bridge in Farnworth, making that section look fully masted. but from the station footbridge to Rawson St remains baseless as far as I could see." Apologies.

Wrinkley has been out and about today. He sent this report to accompany his photos:

"Kearsley to the tunnel, no change as far as masts are concerned since my last photos.
Still a gap just north of the balustraded bridge.
Still bases with no masts between Bolton station and Newport Street. Two on the P4 line and one on the P3 line.
Nothing between Newport Street and the next bridge,
The second big base just before Great Moor Street Bridge is complete. There is a small pile at the side of the up line next to these bases, which would seem to be redundant
A second small base between Great Moor Street and Moor Lane.

Apart from the bases on the Wigan line I can’t see any real change between the golf course bridge at Lostock and Dean Clough since before Carillion went down.
No sign of the car park closing at Lostock when the substation unit are brought in."

I've added the photos to his album here:

https://www.flickr.com/photos/127646831@N03/albums/72157654034635234

and to the Combined Volume here:

https://www.flickr.com/photos/127646831@N03/albums/72157661069863633

Thank you Wrinkley.
 

reg

Member
Joined
15 Mar 2015
Messages
70
Location
Bolton
Bolton-2 TTC have been installed on the Blackburn line just before Bradshawgate tunnel.A new mast is also in place just beyond the northern end of Plat.5.Pics to follow.
 

Joseph_Locke

Established Member
Joined
14 Apr 2012
Messages
1,878
Location
Within earshot of trains passing the one and half
It could be that the mast that's bagged over (as stated in #6454) won't be the only fixture for OLE; I wouldn't be surprised if they didn't drill a cantilever in the retaining wall behind the sign in picture 9680k. That would keep the wires in alignment.
Thus, the sign would only imply that electric trains couldn't run north from P1 at this stage, with the overrun being provided in case of a braking fault and a unit becoming stranded.
Of course, Joseph_Locke knows better than I do with regards to this specific project, so I'm willing to be corrected here.

Mr Locke feasts on humble pie - there will be stovepipes and bridge arms three to conduct the ... conductor under the bridge and northwards. Apologies for any confusion, the design changes when you're not looking.
 

LDECRexile

Established Member
Joined
30 Jan 2014
Messages
2,149
Location
Southport, UK
Bad news.

I believe a road-rail wiring vehicle has crashed into a field somewhere between Kirkham and Wesham and Blackpool North.

The saving grace is that the driver is OK and no-one is injured.

I have no further info at this stage, such as what implications, if any, this has for the timeliness of the project.
 
Last edited:

LDECRexile

Established Member
Joined
30 Jan 2014
Messages
2,149
Location
Southport, UK
The vehicle is being retrieved tonight; if possible it will be repaired and put to work for tomorrow's and Sunday's shifts.

A second saving grace is if the vehicle is beyond speedy repair, then the wheels-free week will give a chance to get a replacement without too much loss of time.

Good luck to all concerned.
 

LDECRexile

Established Member
Joined
30 Jan 2014
Messages
2,149
Location
Southport, UK
1. Reg has kindly sent more shots of steel round the Blackburn lines at Bolton, plus one of danglification in the Burnden area.

I've added them to his album here:

https://www.flickr.com/photos/127646831@N03/albums/72157671732263863

and to the Combined Volume here:

https://www.flickr.com/photos/127646831@N03/albums/72157661069863633

Thank you Reg.

2. Readers are reminded to keep an eye on the albums linked to the very first photo in the Combined Volume. "Blackpoolbeach" for example frequently adds quality shots of electrification work in the Blackpool area.

3. Thank you Joseph Locke for clarifying the current state of play on the Blackburn lines at Bolton.
 

LDECRexile

Established Member
Joined
30 Jan 2014
Messages
2,149
Location
Southport, UK
Is this "baseless speculation"? :D

No, Wrinkley's photos show it to be baseless fact, in fact as bassless as a girl's school choir. This recalls the Oxford University Philosophy question "Is this a question?" to which the answer "No, this in an answer" won a Starred First.
 

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,661
Mr Locke feasts on humble pie - there will be stovepipes and bridge arms three to conduct the ... conductor under the bridge and northwards. Apologies for any confusion, the design changes when you're not looking.

Keep your beady eyes glued on those pesky architects we don't need any more screw ups ;)
 

Inox

Member
Joined
2 Jan 2011
Messages
137
new coping stones at adlington being installed this weekend? at least on the up platform.
 

SodTheDrummer

Member
Joined
14 May 2015
Messages
201
Location
Bolton

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,597
Location
Nottingham
"Bespoke megabase" sounds like the lair of a Bond villain. Perhaps Blofeld is hiding out in one of those abandoned mineworkings, pressing a button that triggers a flow of sand somewhere new just when NR think they have go on top of things...
 

LDECRexile

Established Member
Joined
30 Jan 2014
Messages
2,149
Location
Southport, UK
I have been told that the road-rail vehicle accident I reported in posts #6464 and #6465 did not take place on railway land. No damage to the railway occurred. No-one was hurt.

I have no further information on this incident or the vehicle or the implications for the project, if any. If and when I learn more I will pass it on.
 