I'm not a native to that area so I'm not really up to date with the Bolton works, so what's missing there?
I posted this summary on Salford Crescent to Euxton Jct on or about 8th December. I've added the bits in italics since. I'm disappointed by LNW-GW Joint's post #5766 from his trip yesterday, in particular the lack of orange on show, though I take the point about holidays and resources switched to other time-critical projects.
I reckon the remaining gaps (ie no bases on both sides or only side), from the north, are:
1. Chorley Arches
evidence of work reported 30 Dec
2. Chorley tunnel (unknown)
3. Chorley tunnel southern approach cutting
evidence of work reported 30 Dec
4. Viaduct short distance south of Chorley
5. Tunnel approaching Bolton (unknown)
6. Bridges south of this tunnel
evidence of work reported just before Xmas, with photos
7. Bolton, east side between Platform 2 buffers and Orlando Street bridge
8. Bolton, west side between north end of Platform 5 and Orlando St bridge
9. Unclear stretches between Squeeze Belly Entry footbridge and Farnworth station, there are
some bases
evidence of work reported just before Xmas, with photos
10. Farnworth tunnel (unknown)
11. Unclear between Farnworth tunnel and Kearsley, there are
some bases
evidence of work reported just before Xmas
12. Quarter mile or thereabouts immediately north of Agecroft Road bridge
13. Two, possible three masts-worth of bases missing between Cock Robin Bridge and site of Pendleton Old station
evidence of work reported just before Xmas
14. Salford Crescent Platform 2
I will be delighted to be shown that I'm wrong, uninformed or out of date on any of these.
I might be able to get out and about by rail along this stretch tomorrow (1 Jan), fingers crossed.
If anyone can get lineside, preferably with camera, to any of these locations it would be especially helpful, but all material is very welcome.
In addition to the above, which are "pure" electrification issues, there remain four bridge issues unresolved, at least in the public domain, ie:
Three foot crossings, one between Horwich and the M61 and one either side of the M60 bridge. Al three are currently fenced off, but not permanently closed as far as anyone has reported here.
Lever Street footbridge in Bolton, about which it's gone very quiet. Is it to be retained (it looks knackered to this layman) replaced or closed and removed?
I've lost track of Anderton Hall Crossing's new footbridge, is it open to pedestrians yet?