Blackpool - Manchester Electrification

Status
Not open for further replies.

furnessvale

Established Member
Joined
14 Jul 2015
Messages
4,897
I am truly amazed with the progress with the Preston to Blackpool work.

Pity the same can't be said for between Ordsall Lane Junction to Euxton Junction.
It does demonstrate what can be achieved with a complete blockade as opposed to 5 hours a night and part weekends.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,902
Location
Mold, Clwyd
Maybe they need to do the same with Manchester to Preston, given that it's more than a year overdue already.

You might ask why more was not done in the several extended blockades that the route has had already (eg for the Farnworth/Chorley tunnel works).
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
Farnworth wasn't exactly a blockade, the mousehole was open on weekdays for trains in both directions.
 

Halish Railway

Established Member
Joined
26 Apr 2017
Messages
2,173
Location
West Yorkshire / Birmingham
I am truly amazed with the progress with the Preston to Blackpool work.

Pity the same can't be said for between Ordsall Lane Junction to Euxton Junction.
I have to agree with you. It seems amazing how long it has taken to do the Bolton Corridor.

Speaking of Bolton, what's the progress on that? Are there any masts up?
 

Elecman

Established Member
Joined
31 Dec 2013
Messages
3,571
Location
Lancashire
By testing I assume they mean height and stagger, certainly no HV short circuit testing required as it is the same cb as the original overrun wiring
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,474
Location
Preston Lancs
OK I am doing a full Fylde Jct to Blackpool photography run tomorrow with LDECRexile which will in effect double up as a progressometer run if Dave is game. Just in case we get rained-snowed-sleeted-hailstoned off etc, I made hay while the sun shone and the little wifey was out shopping and borrowed my daughters car and did a Fylde Jct to Spen Lane partial run today. I have sent photos to Dave who may or may not publish them depending on his schedule and the fact we are doing a run tomorrow. Here is my progress report.

1. Salwick Station Bridge not raised but road closure posted in January and I bet it will get done then as Carr Lane, Lea Lane, Darkinson, and others have been raised by putting larger coping stones on.
2. Wires fully complete to the start of Tom Benson Way from Fylde Jct
3. No wires on Tom Benson Way!!
4. Wires (2) from just east of UCLAN sports complex all the way to about Lea Lane
5. Wires (1) to just east of Spen Lane
6. Lots of new live signals - and as widely reported no Salwick Box
7. I tried to play “ spot the start of the neutral section” as live copper wire is - well copper colored - neutral section would be different. Looks to be Tulketh Viaduct area.
8. They are doing something about the wall on St Marks road as the wall is low and built with engineering bricks and 25kV is very very close!
9. Most important - I spotted zero missing masts on my trip.
 
Last edited:

QueensCurve

Established Member
Joined
22 Dec 2014
Messages
2,195
Last edited:

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
OK I am doing a full Fylde Jct to Blackpool photography run tomorrow with LDECRexile which will in effect double up as a progressometer run if Dave is game.
If you get time, don't forget that there are bridgeworks on the South branch too!

Just in case we get rained-snowed-sleeted-hailstoned off etc, I made hay while the sun shone
...
Many thanks for that fantastic list of observations!
 

Malay States

Member
Joined
24 Jan 2017
Messages
56
OK I am doing a full Fylde Jct to Blackpool photography run tomorrow with LDECRexile which will in effect double up as a progressometer run if Dave is game. Just in case we get rained-snowed-sleeted-hailstoned off etc, I made hay while the sun shone and the little wifey was out shopping and borrowed my daughters car and did a Fylde Jct to Spen Lane partial run today. I have sent photos to Dave who may or may not publish them depending on his schedule and the fact we are doing a run tomorrow. Here is my progress report.

1. Salwick Station Bridge not raised but road closure posted in January and I bet it will get done then as Carr Lane, Lea Lane, Darkinson, and others have been raised by putting larger coping stones on.
2. Wires fully complete to the start of Tom Benson Way from Fylde Jct
3. No wires on Tom Benson Way!!
4. Wires (2) from just east of UCLAN sports complex all the way to about Lea Lane
5. Wires (1) to just east of Spen Lane
6. Lots of new live signals - and as widely reported no Salwick Box
7. I tried to play “ spot the start of the neutral section” as live copper wire is - well copper colored - neutral section would be different. Looks to be Tulketh Viaduct area.
8. They are doing something about the wall on St Marks road as the wall is low and built with engineering bricks and 25kV is very very close!
9. Most important - I spotted zero missing masts on my trip.
Salwick Station Bridge was replaced on 24th February 2013 (I was there), so there should be no more to do to it. There is a road closure for about 4 days in January but I don't know why.
 

LDECRexile

Established Member
Joined
30 Jan 2014
Messages
2,149
Location
Southport, UK
Warm thanks for the bouquets; I'll wear my MBE with pride and a smile. I thank everyone who has taken the trouble to send films and photos in a timely manner with enough to go on to make captions and locations doable.

This thread and Liverpool-Manchester Electrification have three consistent attributes which make it work for me:

Civility, goodwill and lack of whingeing
Strongly sourced material
Variety of sources, ranging from skilled internet surfers through observant amateurs to professional Orangemen and women past and present


Gralistair has seized the sunshine to go out and about today, camera at the ready. Let's hope our long-planned jaunt tomorrow is not kyboshed by the weather.

I've added his shots to his album here:

https://www.flickr.com/photos/127646831@N03/albums/72157651259517065

and to the Combined Volume here:

https://www.flickr.com/photos/127646831@N03/albums/72157661069863633

Thank you Graham
 

LDECRexile

Established Member
Joined
30 Jan 2014
Messages
2,149
Location
Southport, UK
Salwick Station Bridge was replaced on 24th February 2013 (I was there), so there should be no more to do to it. There is a road closure for about 4 days in January but I don't know why.

Indeed there SHOULD be nowt more to do to it, but since the rebuild the rules re parapet heights have been changed, leading, for example, to Sidgreaves Lane and Lea Lane bridges having their parapets raised (see photos over the past couple of months). The Salwick bridge looks as if it will need different forms of surgery with the green cladding.

The closure may be for a completely different reason, of course....
 

LDECRexile

Established Member
Joined
30 Jan 2014
Messages
2,149
Location
Southport, UK
I am not so optimistic. I think around late April/ May bank holiday to test the whole line, because there is still a lot to do around Kirkham. My understanding was that Manchester-Euxton wiring teams were separate (Carillion) from Preston to Blackpool (Volker Rail). I also predict bad news soon on the Manchester - Euxton work before publication of the May timetable. Maybe a controversial blockade between Bolton and Manchester to complete the work in the early summer with electric working Bolton - Blackpool? This could allow stock cascades for May timetable change to go ahead as planned.

Oh dear, that would be very disappointing. I have been encouraged by the gap-filling I've seen over the past month south of Bolton, but they aren't all plugged, eg Salford Crescent Platform 2. I've always maintained that getting bases in is critical, not only because no base=no mast=no wire, but because it removes unknowns. Once bases are in the teams can get stuck in. I do not minimise the skill needed or size of the task when installing masts, danglies and wires, but they are working with known quantities under human control.
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,474
Location
Preston Lancs
Salwick Station Bridge was replaced on 24th February 2013 (I was there), so there should be no more to do to it. There is a road closure for about 4 days in January but I don't know why.

And Lea Lane was done AFTER it, but still, about 1 month ago new coping stones much higher were used to replace the 2013 versions. Don’t be too sure. Watch this space

As Dave points out in his posts above.

I do hope you are right and I am wrong though
 
Last edited:

QueensCurve

Established Member
Joined
22 Dec 2014
Messages
2,195
Remediation of old, shallow, unmapped mining works has caused delays to other projects including Edinburgh to Glasgow.

This would seem likely to be an issue for the Chase Line too. And South Wales.

Dayton Superior Corp in the USA. My rough math says 5 metric tonnes minimum even allowing for the rebar.

Dayton Superior Corp sounds a bit like "good food at the bar". Presumably no business would call itself the Dayton Inferior Corp

I must admit I had to smile when I saw the words Balfour Beatty on various occasions during this video !

Perhaps Network Rail should have taken advice from Balfour Beatty rather than sack them off.

Yes, it's just a short stretch, about a quarter of a mile from the main WCML.

It has only taken 45y to get that far. Who knows how quickly they can reach Blackpool.
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,474
Location
Preston Lancs
Had a great day out today with Dave - did Blackpool to Fylde Jct. Photos will follow when Dave gets chance and an updated progressometer possibly too. My highlights are as follows:
1) major progress at Blackpool with steelwork up apart from Station area itself. Contractors/Orange army working hard
2) Some progress at Layton masts all up and mainly endanglied
3) Many masts up out in the country
4) Poulton Station semaphores gone and box still standing. Loads of steelwork up and work still to do on Station
5) Poulton to Kirkham loads of steelwork up
6) Kirkham area - about 400 meters of steel work up on the Blackpool South Line and some up heading to BPN itself. Work progressing nicely on the Station. Track looks laid and just needs Ballasting - electrical switch gear cabin in place. Many bases in place
7) The gap I saw between Kirkham Station and Carr Lane Bridge Treales on December 23rd has been filled - steelwork - mainly TTCs is now in place.
8) Not much further progress between Tom Benson Way and Salwick but work is in evidence
9) There are not many masts missing

A wonderful day out and not much that worries me regarding progress.
 

Malay States

Member
Joined
24 Jan 2017
Messages
56
Had a great day out today with Dave - did Blackpool to Fylde Jct. Photos will follow when Dave gets chance and an updated progressometer possibly too. My highlights are as follows:
1) major progress at Blackpool with steelwork up apart from Station area itself. Contractors/Orange army working hard
2) Some progress at Layton masts all up and mainly endanglied
3) Many masts up out in the country
4) Poulton Station semaphores gone and box still standing. Loads of steelwork up and work still to do on Station
5) Poulton to Kirkham loads of steelwork up
6) Kirkham area - about 400 meters of steel work up on the Blackpool South Line and some up heading to BPN itself. Work progressing nicely on the Station. Track looks laid and just needs Ballasting - electrical switch gear cabin in place. Many bases in place
7) The gap I saw between Kirkham Station and Carr Lane Bridge Treales on December 23rd has been filled - steelwork - mainly TTCs is now in place.
8) Not much further progress between Tom Benson Way and Salwick but work is in evidence
9) There are not many masts missing

A wonderful day out and not much that worries me regarding progress.
One thing in particular does concern me. Preston to Blackpool South is due to open one month today. Kirkham station is nowhere near ready. They have still to build two lift towers, install the lifts, build a bridge and link it all to the booking office, tidy up and finish off. In 4 weeks? No. It has been supposed on this thread that trains ex Blackpool South will have to use the new up platform at Kirkham, so what will happen? They could make temporary access from the north side of the line through the access site, or they could use the old up (new down) platform and run 'wrong line' to Preston, effectively a single line Preston to Blackpool South with Kirkham being a loop. Could they do that? Doesn't seem likely to me. Brace yourselves for an announcement about a week before reopening is due that it is delayed x weeks/months due to any old reason except the true one, incompetence.
Anyone know anything?
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,604
Location
Nottingham
They don't necessarily have to have everything finished at Kirkham, as long as there is some sort of access to the platform(s) to be used for the South service. Doesn't have to be fully accessible at this stage unless the old station was.
 

Shaw S Hunter

Established Member
Joined
21 Apr 2016
Messages
3,486
Location
Over The Hill
One thing in particular does concern me. Preston to Blackpool South is due to open one month today. Kirkham station is nowhere near ready. They have still to build two lift towers, install the lifts, build a bridge and link it all to the booking office, tidy up and finish off. In 4 weeks? No. It has been supposed on this thread that trains ex Blackpool South will have to use the new up platform at Kirkham, so what will happen? They could make temporary access from the north side of the line through the access site, or they could use the old up (new down) platform and run 'wrong line' to Preston, effectively a single line Preston to Blackpool South with Kirkham being a loop. Could they do that? Doesn't seem likely to me. Brace yourselves for an announcement about a week before reopening is due that it is delayed x weeks/months due to any old reason except the true one, incompetence.
Anyone know anything?

That's an incredibly negative post. Many of the structures you mention are subject to a degree of off-site pre-fabrication. Every chance that stuff appears on site and is in final position in well under 4 weeks.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,902
Location
Mold, Clwyd
Surely they only need partial completion of Kirkham to run an hourly Blackpool South service?
New track and signalling from Preston onto the branch, with a loop at Kirkham using the old platforms should be sufficient.
The new platform would not be necessary, nor any wiring (though I expect they will try to complete that beforehand).
Presumably they will want to run doubled-up trains to meet the demand with only Blackpool South open.
 

Elecman

Established Member
Joined
31 Dec 2013
Messages
3,571
Location
Lancashire
They don't necessarily have to have everything finished at Kirkham, as long as there is some sort of access to the platform(s) to be used for the South service. Doesn't have to be fully accessible at this stage unless the old station was.

It certainly wasn’t after they banned the use of the PWay access gate and path.
 

LDECRexile

Established Member
Joined
30 Jan 2014
Messages
2,149
Location
Southport, UK