swt_passenger
Veteran Member
- Joined
- 7 Apr 2010
- Messages
- 34,240
I think a lot more than that. In round figures the shuttering is probably approaching 2 x 4 m. With normal concrete density being around 2.3 tonnes per cubic metre, I think you could be in much high single figures, perhaps 6 or 7 depending on depth - say 50 cm?From that frame the pads would be in the 1-1.5 tonne range before the steelwork is included.