My impression today is that a lot more steelwork has gone up between Farnworth tunnel and Agecroft.
Many masts Lostock-Buckshaw are bristling with attachments.
I suspect many of the "vacant" bases are redundant.
There are certainly places where they have been avoided using TTCs from the opposite side.
Still some real gaps though.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

childwallblues

Established Member
Joined
3 Jul 2014
Messages
3,810
Location
Liverpool, UK

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
Yet another Blackpool press release, about yet more drop-in sessions:

https://www.networkrail.co.uk/feeds...way-revolution-between-blackpool-and-preston/

Residents living near the railway in Blackpool and passengers who travel between the seaside resort and Preston are being invited to find out more about the current phase of upgrade work.


The drop in sessions, which will take place throughout December and into spring next year, provide an opportunity to get the latest information and ask the project team any questions.

The drop in events will take place on:

  • Tuesday 5 December: 4pm – 7pm, at Poulton Civic Centre, Breck Road, Poulton-le-Fylde, FY6 7PU
  • Thursday 7 December: 2pm – 6pm, at Blackpool North station, Talbot Road, Blackpool, FY1 2AB
  • Monday 11 December: 4pm – 7pm, at St Walburges Church Hall, Weston St, Preston PR2 2QE
  • Wednesday 20 December: 4pm – 7pm, T Kirkham community Centre, Mill Street, Kirkham, PR4 2AN
 

Mollman

Established Member
Joined
21 Sep 2016
Messages
1,698
Location
Preston
It wouldn't surprise me if there were weekend closures throughout January and early Feb to get the Manchester - Preston route done. I seem to remember that this was how Liverpool - Manchester / Wigan was completed
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,474
Location
Preston Lancs
Just seen on the Preston Area Facebook page ----

Notice up at work....OLE switches to live from Fylde Jn to Salwick on 27th Dec
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
Just seen on the Preston Area Facebook page ----

Notice up at work....OLE switches to live from Fylde Jn to Salwick on 27th Dec

Great news!

I imagine they're aiming to complete all work between Preston and Kirkham (and the non-electrification works between Kirkham and Blackpool South) by 29th Jan, when the South line is due to reopen.

The Twitter feed has pictures of OLE work at Pedder Street, Preston, which I think is the limit of present (1970s) wires towards Blackpool:

https://twitter.com/TheGNRP/status/935423915127648256

There's a press release about a drop-in event at Lostock about de-vegging between Bolton and Blackrod:

https://www.networkrail.co.uk/feeds/drop-in-event-to-present-vegetation-management-plans-in-lostock/

Network Rail is inviting residents to find out more about upcoming railway vegetation work on the railway between Blackrod and Bolton.

Last year across Britain, around 1,000 trains collided with fallen trees or large branches – a number Network Rail is keen to reduce.

Cutting vegetation back a safe distance from the tracks enables train drivers to clearly see signals – the traffic lights of the railway – and to spot potential hazards as soon as possible.

Network Rail staff will be on hand to explain why this work is so important and answer any questions at:
  • Lostock Parish Centre, Tempest Road, Lostock, BL6 4EL; between 4pm and 7pm on Tuesday 5 December 2017
A spokesperson for Network Rail said: “Vegetation management is an essential part of railway maintenance and this work is crucial to keeping both trains and passengers safe on the network.

“We encourage our lineside neighbours to come along to understand the work we are doing and any impact it will have on them.

“Our project team will be there to answer any questions from residents and address any concerns they may have.”

The work, taking place between Monday and Friday and mainly during daylight hours, will continue until February 2018. Where work has to take place at night when trains are not running residents will be individually notified.

For further information contact Network Rail’s national helpline on 03457 114 141.

Vegetation removal – the facts

In 2013 incidents caused by vegetation cost the railway industry £100m. Storm, rain and wind events resulted in approximately 1,500 incidents in 2013-14 where trees caused disruption to the network.

With 20,000 miles of track and an estimated 2.5 million trees growing on the lineside, managing vegetation on the railway is not just a full-time job but one of our most important safety issues. Our climate, variety of trees and train frequency mean that the railway in Great Britain faces more serious challenges than most other countries.

Lineside vegetation can obscure signals, get blown onto the tracks, or grow to an extent where our staff do not have a safe place to wait whilst trains pass.

We will be removing lineside trees and plants which pose a significant safety or performance risk. Vegetation management also helps to prevent leaves falling on the track which can hamper train acceleration and braking.

Areas are assessed on a case-by-case basis, however all sites will see a clear six-metre wide corridor created (where available) on either side of the track, along with the removal of leaf fall species (for example ash and sycamore) and any trees tall enough to fall into the path of a train or onto other parts of the railway infrastructure.

Before works start Network Rail or our representatives carry out an ecological survey. Any protected species or nesting birds are identified and appropriate methods of working are put into place. Although the works do not require the submission of a planning application, where appropriate we will notify your local authority and any relevant statutory bodies.

To undertake these works, we will use a variety of equipment that can include chainsaws, flail machines, chipping machines or handsaws. Where suitable, logs and branches will either be left to create a safe habitat for wildlife; chipped and spread evenly; or will be completely removed from site.

Works will often be required to take place when trains are not running, but every effort is made to keep controllable noise to a minimum and our staff are briefed on working responsibly in the local community.

Network Rail is very aware of the impact removing trees and vegetation can have on local communities. We particularly know that this can come as a something of a shock for people who have become accustomed to lines of trees or hedges near their homes or workplaces. However, for the safety of our passengers and employees we have no option but to take action to reduce the risk posed in order to operate a safe and reliable railway.
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,474
Location
Preston Lancs
Great news!

I imagine they're aiming to complete all work between Preston and Kirkham (and the non-electrification works between Kirkham and Blackpool South) by 29th Jan, when the South line is due to reopen.

I agree - that makes sense. Dave and I did see huge progress on our trip Friday Nov 24th
 

driver9000

Established Member
Joined
13 Jan 2008
Messages
4,556
It's not to Salwick it's only for the first 714 metres to install a neutral section like they have done at Euxton Junction.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,608
Location
Nottingham
It's not to Salwick it's only for the first 714 metres to install a neutral section like they have done at Euxton Junction.
I assume they prioritised that bit so they can turn the main line back on for start of service on the 27th.
Good job we've got Google! :lol:
If you'd been exiled from Derbyshire (not sure about Lancashire or the East Coast) you would have known that


mi duck.
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,474
Location
Preston Lancs
So the Twitter post is about installing wiring/ neutral bits and the closure is to connect the non neutral bit to the WCML?
 

Elecman

Established Member
Joined
31 Dec 2013
Messages
3,571
Location
Lancashire
I would think so then they can connect the wire runs up beyond the Neutral Section without having to turn the WCML off in due course
 

mwmbwls

Member
Joined
14 Dec 2009
Messages
682
We established on here some years ago, possibly on this very thread, that the rebuild of the flying arches at the time allowed for OLE supports simply to be bolted to them when ready. So there will be no bases or steelwork to look out for in this area - it will go straight to "danglies". I don't recall what solution was chosen for the tunnel.

The article shows the post rebuild /pre-electrification position:
http://www.lancashiretelegraph.co.uk/news/chorley/13376918.display/
 

superkev

Established Member
Joined
1 Mar 2015
Messages
2,856
Location
west yorkshire
Nodrog has posted a couple more YouTube vids inc one of a huge crane looking to be renewing squresgate bridge on the south line. I wonder if it will have clearances for any future wiring.
K
 

Chrism20

Established Member
Joined
27 Feb 2013
Messages
1,398
I’m down visiting my folks for a few days and walked over Squires Gate Bridge this afternoon.

The entire road surface is gone and you can now see straight down onto the rail tracks underneath. I had a look at the Network Rail board at the side of the bridge which explained what’s happening. There was no mention of electrification or future proofing that I could see.

On the subject of bridges on the South Fylde I noticed that Harrowside Bridge is closed as well. Is work planned here as well during the closure?

On the way to Blackpool yesterday the RRB took just over forty minutes at half past three which I thought was quite impressive.

The amount of work that has been done so far at Blackpool North is amazing. It’s also quite good that the regular passengers on the route can actually see something happening. This is definitely not one of those “you’ve shut the line and nothing is being done” scenarios.
 

LDECRexile

Established Member
Joined
30 Jan 2014
Messages
2,149
Location
Southport, UK
Ey up

I went to Whaley Bridge from Southport today, naturally I used "our" line. I'll do the Jeremiah bit and say:

1. the work I could see last week on the western entrance to the foot crossing immediately south of the M60 bridge was to erect a permanent-looking spiky-topped fence to block it off. Has it been closed?
2. I could see no evidence of work on bases next to Platform 2 at Salford Crescent.

I'll let the following proclaim the good news:

1. Bill Morton sent a shot of Anderton Hall crossing's replacement footbridge which he says looks close to ready to be opened.

I've added Bill's photo to his album here:

https://www.flickr.com/photos/127646831@N03/albums/72157650900509369

2. Reg sent six shots of the new masts in the Burnden and Bolton station areas

I've added them to his album here:

https://www.flickr.com/photos/127646831@N03/albums/72157671732263863

3. Wrinkley sent shots of these masts from platform and train level, plus shots of de-veging on the Wigan line near Lostock

I've added them to his album here:

https://www.flickr.com/photos/127646831@N03/albums/72157654034635234

As always, I've added the lot to the Combined Volume here:

https://www.flickr.com/photos/127646831@N03/albums/72157661069863633

Thank you Bill, Reg and Wrinkley.

BOZERexile
 

Sheepy1209

Member
Joined
26 Oct 2011
Messages
204
On the subject of bridges on the South Fylde I noticed that Harrowside Bridge is closed as well. Is work planned here as well during the closure?

Harrowside bridge has been closed for several months - the council originally planned to do some minor remedial work but then found it was in a dangerous state (reinforced concrete beams 40% corroded) so closed it immediately and scheduled it for replacement during the closure of the line. Both bridges are due to be complete by March 2018 but I suspect they'll deal with Squires Gate Lane first as it's on a major route.

(There's some information on the issues with Blackpool's bridges here: http://www.lancashirelep.co.uk/lep-priorities/transport-and-connectivity/blackpool-bridges.aspx .
It's a couple of years old and quite a lot's changed since then.)
 

Chrism20

Established Member
Joined
27 Feb 2013
Messages
1,398
Harrowside bridge has been closed for several months - the council originally planned to do some minor remedial work but then found it was in a dangerous state (reinforced concrete beams 40% corroded) so closed it immediately and scheduled it for replacement during the closure of the line. Both bridges are due to be complete by March 2018 but I suspect they'll deal with Squires Gate Lane first as it's on a major route.

(There's some information on the issues with Blackpool's bridges here: http://www.lancashirelep.co.uk/lep-priorities/transport-and-connectivity/blackpool-bridges.aspx .
It's a couple of years old and quite a lot's changed since then.)

Thanks
 

swanhill41

Member
Joined
8 Nov 2016
Messages
253
Location
Fleetwood
Both Harrowside and Squires Gate have the dreaded concrete cancer..Both were in effect unsafe...Diversions are to say the least complicated as I think need to go back to Waterloo Road bridge to go around...Good point leads you straight onto Yeadon Way and M55
 
Joined
8 Aug 2014
Messages
77
Harrowside bridge has been closed for several months - the council originally planned to do some minor remedial work but then found it was in a dangerous state (reinforced concrete beams 40% corroded) so closed it immediately and scheduled it for replacement during the closure of the line. Both bridges are due to be complete by March 2018 but I suspect they'll deal with Squires Gate Lane first as it's on a major route.

(There's some information on the issues with Blackpool's bridges here: http://www.lancashirelep.co.uk/lep-priorities/transport-and-connectivity/blackpool-bridges.aspx .
It's a couple of years old and quite a lot's changed since then.)

Harrowside Bridge is not being replaced, it is however having significant repairs and strengthening work to it. There are a number of "properties" under the approach on the sea-side which ended up with the quote for complete replacement being somewhere around £10m!
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
Status