edwin_m
Veteran Member
Sounds like responsibility might involve a wrangle between lawyers and insurers.
I've had two helpful emails from ALX400 about the Moses Gate problems. He wrote:
[snip]
...and later he continued...
"There's an image of the bridge on the NR twitter feed, it says they will carry out emergency repairs tonight."
From what I've seen there appears to be no provision for Electrification of P5. Am I missing something?
From what I've seen there appears to be no provision for Electrification of P5. Am I missing something?
There most definitely will be, and its STCs on the west side IIRC, but I'd suggest that getting the track in first is exactly the right thing to do; the platform copings, then the STC bases, then the monster ATF duct route, then the infill canopy section, then the masts. and wires The bases and onwards can all be done after the blockade.
Even if P5 wasn't wired for operational reasons, the over-run provision would extend to north Orlando Street bridge anyway (it is a very curious calculation) so by time you'd brought it out of running and anchored it you'd be in the platform ...
So not 185s.New speed limits from 27th August, 2017 ... for MU only (multiple Units) 90/95/100 mph from around Dean Clough overbridge to near Chorley for MU only,
I doubt that will make up for it ...there are some minor speed changes for other trains.
This sounds like more is to come, because I doubt much will get from 75 at Kearsley to 100 and then back to 20 through Bolton. This bit of increase is almost certainly because it is what Bolton is designed to accommodate, rather being the final answer, and it's easiest just to do it all in one go.include 90 or 100 mph from near Kearsley to near Bolton for MU only.
An Orangeman has kindly sent an authoritative layout-to-be for the Bolton remodelling.
I've added it to the Combined Volume here:
https://www.flickr.com/photos/127646831@N03/albums/72157661069863633
Thank you Citric Gentleman.
New speed limits from 27th August, 2017 (or there abouts) include 90 or 100 mph from near Kearlsey to near Bolton for MU only (multiple Units) 90/95/100 mph from around Dean Clough overbridge to near Chorley for MU only, there are some minor speed changes for other trains.
So no practical change then, as if the few 185s on the route can't use the differentials, there is no other MU stock capable of exceeding 75mph at the moment.
But within a couple of years the route will see 319s, 331s and possibly 195s too, all of which are capable of 100mph.
So no practical change then, as if the few 185s on the route can't use the differentials, there is no other MU stock capable of exceeding 75mph at the moment.
Am I being a bit thick, I thought that 185s are multiple units, if so why are they not allowed to use the new speed limits.
Perhaps it's for turning round shuttles from Manchester?
An Orangeman has kindly sent an authoritative layout-to-be for the Bolton remodelling.
I've added it to the Combined Volume here:
https://www.flickr.com/photos/127646831@N03/albums/72157661069863633
Thank you Citric Gentleman.
An Orangeman has kindly sent an authoritative layout-to-be for the Bolton remodelling.
I've added it to the Combined Volume here:
https://www.flickr.com/photos/127646831@N03/albums/72157661069863633
Thank you Citric Gentleman.
... is the right answer. You can turn back south off any platform.
Am I being a bit thick, I thought that 185s are multiple units, if so why are they not allowed to use the new speed limits.
Because they are fat boys and not allowed to use differentials.
If it looks like a DMU, sounds like a DMU and operates like a DMU, it is a DMU (unless its a 185).
Apparently, despite being RA5 (same as a class 43 - an HST can run as MU) it isn't allowed to operate at the MU speeds. A 350 can, but a 185 can't. Rolling Stock Acceptance Board (RSAB) have spoken.
edit: if you read "heavy" for "fat" then Msr. Planner he speak true (but only 18.5t per axle)
See page 14 of the current LNWN sectional appendix, available Network Rail's website