What page or group is this picture on facebook.
Can't find it now
I had thought that Bolton Trams had posted it, or maybe in the BR:Bolton Railway group, but not there now.
What page or group is this picture on facebook.
Can't find it now
I had thought that Bolton Trams had posted it, or maybe in the BR:Bolton Railway group, but not there now.
Did you have a camera or mobile with you?
Were the few more masts scattered all over the place or in any particular locations?
Hear hear to your best wishes to the Orange Army.
Ha, if only I knew how to work the camera on my phonesadly not but I'll try for pics when I go along said stretch just after it reopens
With regards to the concrete base you mention, is that the one in the carriage sidings on the line which has been relaid?Red Face Time
I'm afraid I've confused my brain cell on my run today, with the outcome that I can't allocate proper numbers of masts and bases between Preston and Kirkham, so I'll have to give a narrative summary, which is relatively easy, as it looks very good.
1. I saw no scrapes between Fylde Junction and Milepost 7, which is the southern limit of the Kirkham and Wesham station working area. "No scrapes" means every base appeared to be in place, with the sole exception of Tulketh Viaduct, where the method of erecting masts isn't yet obvious. Approximately a third of these bases bears a mast, a few of which have arms attached.
2. I saw no electrification work per se between MP7 and the northern limit of the Kirkham station area north of Kirkham North Junction.
3. From that point (approx MP8 3/4) to the southern limit of Poulton station's erstwhile working area (approx MP14) I saw a mere 16 scrapes, the rest being a full house of bases, approx a third of which bore masts, some with arms.
4. From Poulton signalbox to the outer edge of Blackpool North station working area there was a handful of scrapes, otherwise a full house of bases, including Layton station. I didn't see any masts in this stretch.
This was very encouraging. There is no obvious impediment to sinking bases at Poulton station. There are still semaphore signals from Poulton to Blackpool, but bases have been sunk without fouling signal wires.
There are a lot of new signal bases up and down the route, plus surface signal wiring here and there. i can't judge how much signal work remains to be done.
There is a lot of preliminary work in progress at Blackpool North, a substantial concrete base (for electrical gear?) has been installed and there is an amount of yellow plant on show. I saw no Orangemen anywhere in the route.
Yippee!
With regards to the concrete base you mention, is that the one in the carriage sidings on the line which has been relaid?
If yes, this is the base for the new carriage washer.
ALX400 and Reg have sent photos of progress.
I've added Reg's to his album here:
https://www.flickr.com/photos/127646831@N03/albums/72157671732263863
I've added ALX400's to his album here:
https://www.flickr.com/photos/127646831@N03/albums/72157651121057352
and all of them to the Combined Volume here:
https://www.flickr.com/photos/127646831@N03/albums/72157661069863633
Thank you Reg and ALX
Signal gantry at Burnden sidings removed this morning.Pics to follow
It's a pity the bridge over the Chorley line wasn't an inch or two lower, or it would have got replaced in the same style.
Is there still going to be a 'weak bridge' weight restriction on the lostock bridge once them work's been completed?