• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Blackpool - Manchester Electrification

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

LDECRexile

Established Member
Joined
30 Jan 2014
Messages
2,149
Location
Southport, UK

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
Press release

https://www.networkrail.co.uk/feeds...about-upgrades-between-preston-and-blackpool/

Residents living near the railway between Preston and Blackpool North are invited to a series of drop-in events over the next month to find out more about the next phase of upgrade work.

As part of Network Rail’s £1bn+ Great North Rail Project, work continues to complete the upgrade and electrification of the railway between Preston and Blackpool. For safety reasons some work has to be carried out at night when trains aren’t running which includes piling work to install foundations and the steel masts which will carry electric wires to power greener and quieter electric trains.

Noel Connolly, head of programme management for Network Rail, said: “This work forms part of our Railway Upgrade Plan and will deliver better, greener and more efficient services for passengers in the north.

“I appreciate that the work could be disruptive, so I’d like to thank local residents for their patience while we carry this out. We will take all possible measures to keep disruption to an absolute minimum.”

These drop in sessions form part of a regular series of events along the route where local residents are invited to speak to Network Rail staff who will be on hand to answer questions and provide more detail on the work being carried out:

Wednesday 26 July 16:00-19:00 at Kirkham Community Centre, Mill Street, Kirkham, PR4 2AN
Monday 31 July 16:00-19:00 at Poulton Civic Centre, Breck Road, Poulton-le-Fylde, FY6 7PU
Monday 21 August 16:00-19:00 at The Lund Vicarage Church Hall, Clifton, PR4 0ZE
Tuesday 22 August 16:00-19:00 at Ashton Methodist Church, Wellington Road, Preston, PR2 1BU
Tuesday 29 August 14:00-18:00 at Blackpool North station, Talbot Road, FY1 3AZ

To find out more about this work please visit our website at www.networkrail.co.uk/blackpool

Any residents who cannot make the drop in and have any questions can call our 24 hour national helpline on 03457 11 41 41.
 
Joined
8 Aug 2014
Messages
77
On a trip between the Blackpool and Preston yesterday, I noticed that a decent number poles between Staining and Kirkham have received their cantilever bits and bobs. Was sat wrong side both ways but probably about 20-30 in total, and I suspect that will have increased last night...
 

Codville

Member
Joined
25 Jan 2013
Messages
60
Not sure if it has been mentioned yet but the plans for Kirkham and Wesham station are up on Fylde Borough's planning portal.

Edit: It looks like Kirkham Tip LC will be getting a bridge.
 

Attachments

  • 17_0201-PROPOSED_F002_GENERAL_ARRANGEMENT-786387.pdf
    972.1 KB · Views: 102
  • 17_0201-SHEET_1_OF_4-786625.pdf
    1.2 MB · Views: 52
  • 17_0201-SHEET_2_OF_4-786627.pdf
    984.6 KB · Views: 31
  • 17_0201-SHEET_3_OF_4-786384.pdf
    765.4 KB · Views: 29
  • 17_0201-SHEET_4_OF_4-786385.pdf
    289.1 KB · Views: 31
Last edited:

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,902
Location
Mold, Clwyd
Unless they build the extensions, the platforms are staying at 183m.
That's roughly 8x23m. Not long enough for Pendolinos.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
Press release

https://www.networkrail.co.uk/feeds...ng-bolton-station-improvement-work-in-august/

As work continues to provide a better railway between Manchester and Preston, Bolton passengers are being reminded of changes to train services this August.

For 16 days between Saturday 12 August and Sunday 27 August 2017, Network Rail’s orange army will continue work to upgrade the railway through Bolton in preparation for electric trains running on the line.

As a result, the majority of train services will not run in or out of Bolton until the first service on Monday 28 August 2017. However, trains will still run from Bolton to Blackburn and Clitheroe during weekdays and bus replacements will also be in use. Passengers are being urged to plan their journey ahead and check before they travel on www.nationalrail.co.uk.

The upgrade forms part of the £1bn+ Great North Rail Project which will see faster, electric trains between Manchester and Preston.

Mark Killick, chief operating officer for Network Rail, said: “These essential improvements will ensure the station is fit for use for many years to come as the demand on train services increase. The work will allow more trains to run between Manchester and Preston, enabling faster and more frequent journeys for passengers in Bolton.

“I understand the work will cause disruption for some people and I apologise but in the long term, the enhancement of the station will improve the passenger experience.”

Liam Sumpter, regional director for Northern, comments: “Great improvements are coming for our customers in the north west, and particularly those travelling through Bolton, with quicker journeys, longer trains and more frequent services. Before we can deliver that, essential large scale engineering work has to take place and we thank our customers for their patience while this happens.”

Work taking place includes: restoring an unused platform, modifying existing platforms and canopies as well as remodelling track, upgrading signalling and installing overhead line equipment.

Passengers can plan their journey and check before they travel at www.nationalrail.co.uk.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,604
Location
Nottingham
Of what? my screen says 160; you need a bigger screen.

On my screen your post pushed us onto page 320! Normal PC with whatever the default settings are for viewing the forum, as I wouldn't know how to change them. I assume there is a setting somewhere for number of posts per page and yours is set to twice what mine is.
 

Greybeard33

Established Member
Joined
18 Feb 2012
Messages
4,335
Location
Greater Manchester
On my screen your post pushed us onto page 320! Normal PC with whatever the default settings are for viewing the forum, as I wouldn't know how to change them. I assume there is a setting somewhere for number of posts per page and yours is set to twice what mine is.

See User Control Panel > Settings & Options > Edit Options > Thread Display Options > Number of Posts to Show Per Page. The "forum default" appears to be 15 posts per page, at least on my PC and phone.
 

Jamesrob637

Established Member
Joined
12 Aug 2016
Messages
6,057
So on a slightly more serious note, I took a trip Manchester to Bolton last night and progress is definitely there. Hopefully many more masts will go up in the Bolton blockade next month.

(I wonder why they don't do a blockade of the line throughout August so that they can get more stuff done during the school summer holidays? Divert as many services as possible through Golborne and Wigan, and send some others though Burnley)
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,472
Location
Preston Lancs
So on a slightly more serious note, I took a trip Manchester to Bolton last night and progress is definitely there. Hopefully many more masts will go up in the Bolton blockade next month.

Indeed and good news. It has worried me for a while that the slowest progress "appears" to be on this section. I naively thought once the serious civil engineering - aka Farnworth Tunnel was done it would progress faster than it has. I just hope the blockade does indeed produce an avalanche of progress. I will be in the USA until Thanksgiving (4th Thursday in November for those of you not in the know), so hopefully by then it will be just what lengths of wire/catenary needs doing. I am home next weekend for a lightning quick trip home and I will be traveling from the airport to Preston so I will have a butchers.
 

SodTheDrummer

Member
Joined
14 May 2015
Messages
201
Location
Bolton

A great site indeed.. Shame to see wonderful Victorian structures like the 13 arches unused and overgrown. It would be nice to see it being used for something if not transport..
Poulton looks pretty much the same! I'll be there at w/e visiting folks so will look for any changes and take pics.
 

driver9000

Established Member
Joined
13 Jan 2008
Messages
4,556
The connecting line at the west end of Bolton station is abandoned from this weekend. Are they slewing track across where it sits or is it just removing redundant equipment?
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,636
I was on the Blackpool branch today, plenty of masts up, and loads of foundations too.
 

driver9000

Established Member
Joined
13 Jan 2008
Messages
4,556
A short section of catenary and return Conductor has been installed at Euxton Junction
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
Of what? my screen says 160; you need a bigger screen.

It won't be size of the screen that's the difference, it'll be you've changed the forum settings for your account to 50 posts per page instead of the default 25, so you'll scroll more than the rest of us. ;)
 
Last edited by a moderator:
Status
Not open for further replies.

Top