1. Farnworth tunnel (could be fully kitted out with danglies for all I know)
2. the tunnel and bridges immediately north of Bolton
3. Chorley tunnel and approach cuttings
4. Broughton Rd bridge to Agecroft N Jct
5. Agecroft Road bridge and approaches from N and S
6. Yarrow viaduct
7. Farnworth Stn to Squeeze Belly Entry bridge
8. Bolton Platform 5
9. Burnden, West side
10. Several stations

Bolton Blockade for platform reinstatement and junction realignment is 12th to 27th August so likely work will be done then.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,902
Location
Mold, Clwyd
I did a run round today, but can't add anything significant to the recent detailed reports.
There are now more masts up (c40) between Kirkham and Poulton than there are between Fylde Jn and Salwick (c30), and there are plenty more at the lineside on both stretches, ready to go up.
I am only guessing, but I suspect the Blackpool line will not be fitted out for autotransformer operation (the masts don't look right).
Big machinery working on the ballast of the old avoiding lines at Kirkham.
Plenty of added components throughout the Bolton route (ATF kit, autotensioners etc), but very hard to judge progress.
Certainly more concrete bases Farnworth-Agecroft, and more masts/cantilevers Bolton-Lostock.
Good to see most of the steelwork up at Salford Crescent.
Some masts/reg gear going up on the Ordsall Chord too.
It was a slow-motion run between Bolton and Clifton with signalling problems reported, some trains diverted via Golborne.

Not directly on the route, but I was surprised to see all the work on the WCML between Springs Branch and Euxton Jn for the new AT feed.
This has required some new masts in places and a lot of new "gubbins".
The AT wire (2 runs in places) is not quite continuous, but most of it is up.
I don't know if the two projects are linked, but they are certainly using similar skills and components.
 

Elecman

Established Member
Joined
31 Dec 2013
Messages
3,569
Location
Lancashire
As Preston Blackpool won't have a Track Section cabin other than the existing one at Fylde Junction there won't be a need for an AT Feeder, same with Windermere if it ever get wired
 

Greybeard33

Established Member
Joined
18 Feb 2012
Messages
4,335
Location
Greater Manchester
Aiirport to Blackpool/Barrow turns up on time at Preston, after diversion via Golborne.
Then has to wait 30 mins waiting for crew to come via Bolton. :o

Someone mentioned on another thread that the ex-TPE Blackpool crews don't sign the Chat Moss, while the original Northern crews don't sign the 185s. And it's only 15 months since the franchise remapping! :roll:
 

CAF397

Member
Joined
15 Sep 2010
Messages
1,095
Location
Lancashire
Someone mentioned on another thread that the ex-TPE Blackpool crews don't sign the Chat Moss, while the original Northern crews don't sign the 185s. And it's only 15 months since the franchise remapping! :roll:

Northern (ex-TPE) Blackpool & Barrow crews DO sign Chat Moss, and Wigan-Westhoughton-Bolton. They don't sign via Atherton.

Northern (original) Blackpool crews don't sign Chat Moss, nor I believe Westhoughton or Atherton. Wigan and Victoria crews I reckon sign everything.

Further compounded, as you state, by Northern (original) crews not signing 185s. Plus Northern drivers can not cross cover each other's work (e.g. Ex-TPE driver can not drive an original Northern working, nor can a Northern originial driver drive an ex-TPE train even if they sign the traction.

The guards have an agreement that they can crosscover, but Northern (original) crews do not sign 185s.

This is all pending harmonisation.
 
Last edited by a moderator:

Whistler40145

Established Member
Joined
30 Apr 2010
Messages
6,149
Location
Lancashire
I'm not sure if it's just Saturdays, but the 03:37 Blackpool North to Manchester Airport is booked via Wigan North Western and Bolton
 

Greybeard33

Established Member
Joined
18 Feb 2012
Messages
4,335
Location
Greater Manchester
Northern (ex-TPE) Blackpool & Barrow crews DO sign Chat Moss, and Wigan-Westhoughton-Bolton. They don't sign via Atherton.

Northern (original) Blackpool crews don't sign Chat Moss, nor I believe Westhoughton or Atherton. Wigan and Victoria crews I reckon sign everything.

Further compounded, as you state, by Northern (original) crews not signing 185s. Plus Northern drivers can not cross cover each other's work (e.g. Ex-TPE driver can not drive an original Northern working, nor can a Northern originial driver drive an ex-TPE train even if they sign the traction.

The guards have an agreement that they can crosscover, but Northern (original) crews do not sign 185s.

This is all pending harmonisation.

Yes, my bad. I mis-remembered this post by Scrapy.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
Does this mean that e.g. there's a power outage or routine maintenance that the whole line is isolated?
Yes, I can't see any reason why that would be a bad thing. I think the average distance between track sectioning cabins etc on the WCML is about 14 miles; Fylde Junction to Blackpool North is only a little more than that.
 

LDECRexile

Established Member
Joined
30 Jan 2014
Messages
2,149
Location
Southport, UK
Last edited:

Geeves

Established Member
Joined
6 Jan 2009
Messages
2,617
Location
Rochdale
They certainly aren't messing around as those sleepers were only delivered last night, as I observed the two trains around 22:00 and 22:20 passing the Crescent.
 

Trackman

Established Member
Joined
28 Feb 2013
Messages
4,252
Location
Lewisham
Sweepstake, playing safe, May 2018, everything in all one go.

Thanks Reg for the photos from Bolton.
Anyone know where the crossover will be for P5 at Bolton?
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,902
Location
Mold, Clwyd
I think both blackpool and bolton line projects will open more or less at the same time, i`m going for the may 2018 timetable change.

The Blackpool line reopens in March after the remodelling/electrification work.
Supposedly it will be diesel-worked until the May timetable change.
I think you would need to have some electric running from the March date to be able to go all-electric in May (on wired routes).
Presumably the same applies to the Salford-Euxton route too.
The rate of introduction of class 319s out of Liverpool in 2015 was painfully slow, even though the wires to Manchester/Wigan/Warrington were up and ready.
It took 12 months before some diesel diagrams were replaced (and even then the times were still based on Pacer performance - basically they still are).
 
Last edited:

jonesy3001

Established Member
Joined
13 Jul 2009
Messages
3,317
Location
Otley, West Yorkshire
The Blackpool line reopens in March after the remodelling/electrification work.
Supposedly it will be diesel-worked until the May timetable change.
I think you would need to have some electric running from the March date to be able to go all-electric in May (on wired routes).
Presumably the same applies to the Salford-Euxton route too.
The rate of introduction of class 319s out of Liverpool in 2015 was painfully slow, even though the wires to Manchester/Wigan/Warrington were up and ready.
It took 12 months before some diesel diagrams were replaced (and even then the times were still based on Pacer performance - basically they still are).

That's my prediction out of the window going for the may 2019 timetable change for the blackpool line and December 2018 for the preston to manchester via Bolton line.
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,467
Location
Preston Lancs
Anecdotal and other sources STRONGLY say Preston- Blackpool will comfortably be ready for May 2018 timetable change/electric services/driver training etc.

I think I speak for many of us when I say Euxton Jct - Manchester by Dec 2017 is the more challenging deadline - which is why I say May 2018 timetable but electric running/testing/driver training etc. before then. If some enterprising organization were to run a coaches top and tailed by a class 92 Manchester area to Blackpool excursion in that time period, I would pay good money to be on it.
 

Elecman

Established Member
Joined
31 Dec 2013
Messages
3,569
Location
Lancashire
Not sure how much drivervtraining on 319s/Pendos will be required after energisation, but some refamiliarisation will be required for all drivers surely after a 4 month total closure and remodelling/resignalling
 

DJH1971

Established Member
Joined
10 Jun 2012
Messages
1,751
Location
St Helens, Merseyside
Anecdotal and other sources STRONGLY say Preston- Blackpool will comfortably be ready for May 2018 timetable change/electric services/driver training etc.

I think I speak for many of us when I say Euxton Jct - Manchester by Dec 2017 is the more challenging deadline - which is why I say May 2018 timetable but electric running/testing/driver training etc. before then. If some enterprising organization were to run a coaches top and tailed by a class 92 Manchester area to Blackpool excursion in that time period, I would pay good money to be on it.

That's why I'm thinking around the February/March ballpark
 

BMIFlyer

Member
Joined
13 Mar 2017
Messages
723
Not sure how much drivervtraining on 319s/Pendos will be required after energisation, but some refamiliarisation will be required for all drivers surely after a 4 month total closure and remodelling/resignalling

Some but not much.

Main changes on the Blackpool line are obviously OHLE, new signalling, higher speeds, plus the new layout of 3 platforms (currently 2) at Kirkham along with platform 1 and 2 at that station being bi-directional.

Northern Blackpool drivers start class 319 training shortly I believe.
 

driver9000

Established Member
Joined
13 Jan 2008
Messages
4,556
Some but not much.

Main changes on the Blackpool line are obviously OHLE, new signalling, higher speeds, plus the new layout of 3 platforms (currently 2) at Kirkham along with platform 1 and 2 at that station being bi-directional.

Northern Blackpool drivers start class 319 training shortly I believe.

Blackpool Drivers are mostly (if not all) trained on 319s now and a start has been made on the ex-TPE Drivers recently.
 

Whistler40145

Established Member
Joined
30 Apr 2010
Messages
6,149
Location
Lancashire
Some but not much.

Main changes on the Blackpool line are obviously OHLE, new signalling, higher speeds, plus the new layout of 3 platforms (currently 2) at Kirkham along with platform 1 and 2 at that station being bi-directional.

Northern Blackpool drivers start class 319 training shortly I believe.
Presumably, Northern Blackpool drivers will utilise the 319s that stable at Preston?
 