The photo shows the bridges over both the Chorley and Wigan routes. Will both be worked on, I wonder?
The planning application only shows the Wigan line bridge.
The photo shows the bridges over both the Chorley and Wigan routes. Will both be worked on, I wonder?
seems bizarre to just replace one? both are knackered and have load limiting bollards on them. Can't see them having another period of closre to replace the Preston line bridge...
This seems to be a significant development! The "LETTER" at 42626's link makes clear that this is neither routine asset renewal, nor works necessary for Phase 4 of the electrification (the route via Chorley), but works necessary for Phase 7 (Lostock-Wigan), for which I thought there was no firm go-ahead yet!
However they are going ahead with the bridge work now.Look at the date of the letter and the date of the permission such as it is. It predates the postponement of Wigan Lostock
Been for a bit of a wander today, there's not much progress i can see recently around Blackrod Adlington or Chorley regarding steelwork, troughs And signalling work yes, I'd be really suprised if it's complete for December there just seems far to much work still to do, what's everyone's thoughts ?
My bet is that full route Manchester - BLACKPOOL will be ready for the May 2018 timetable.
Earlier today Paul and I did a road tour from Horwich to Euxton Jct followed by a trip to Salwick. These points doubtless overlap with other peoples' recent contributions. Photos later.
National Grid Overhead wires south of the M60
National Grid Overhead wires south of the M60
Dave as well as being home for 10 days for the USA Independence Day week of July 4th when we have our jaunt - I am also home May 25 to 29th.
I am going to concentrate on (photos) Fylde Jct - Salwick and possibly Treales and Kirkham. I trust this does not overlap with anything you have planned.![]()
Where exactly? Between the M60 and Clifton?
I think so, I'm following JL's portents some months ago which I have not yet seen allayed.
I think the risks are things like wires carrying Grid Power coming down on wires carrying 25kV with a train carrying 250 people beneath.
I could be up a gumtree.
I think the risks are things like wires carrying Grid Power coming down on wires carrying 25kV with a train carrying 250 people beneath.
The sharp-eyed amongst you may have noticed that the new vertical members for the canopy trimming are installed for nearly the whole length of Platform 3 at Bolton now, in preparation for cutting the extra bit off.
As to ENW oversails, they need moving because the separation between the new OLE and the existing transmission lines isn't enough to allow one to be worked on while the other is live (or in the case of the oversail between Lostock and Horwich because they would touch).
Only the Westhoughton line deck (aka LCN/1) is being rebuilt. for Reference 350mm is a lot when the deck is full of services and the entire bridge is the summit of a hill already.