Taking counts of bases from a moving train with guards asking for tickets etc is always prone to error, but Paul did a count from Lostock to Buckshaw and came up with figures which were so far from those on the spreadsheet that I'm scratching my head.
I suggest we do full counts of all sections north of Bolton next week and compare notes.
Dave, here's my count of bases as of last Monday April 4: (Up/Down)
Salford Cen-Cres 19/15 (excludes a few concrete platforms)
Ordsall Lane-Windsor Bridge S 4/10 (none east of Oldfield Road bridges on either route)
Salford Cres-Clifton 9/13 (none north of Agecroft North Jn)
Clifton-Bolton-Lostock NIL
Lostock-Horwich 40/45
Horwich-Blackrod 20/19
Blackrod-Adlington 47/43 (bases) plus 5 masts on the Down
Adlington-Chorley 61/55
Chorley-Buckshaw 9/15
Buckshaw-Euxton Jn 0/1
Counting will get more difficult with the summer vegetation growth!
I jot these down in the empty space in timetable booklets and I'm running out of room...
--- old post above --- --- new post below ---
Base for Bases
Has anyone spotted the new contractors' base or bases?
On Liverpool-Manchester BB had a substantial one at Edge Hill, Buckingham likewise at Roby and there was a stock store on Chat Moss.
The people working on bases, masts and wiring have to put their kit and caboodle somewhere, it ain't trivial.
BB also had a Manchester base in the Middlewood Locks zone when they did the Victoria approaches, but that's gone (replaced by the Ordsall Chord project site).
I haven't seen any sign of a logistics base yet (or even confirmation of the contractor), though I haven't been east of Victoria for a while.