• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Blackpool - Manchester Electrification

Status
Not open for further replies.

LDECRexile

Established Member
Joined
30 Jan 2014
Messages
2,149
Location
Southport, UK
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

snail

Established Member
Joined
16 Jun 2011
Messages
1,910
Location
t'North
I can't help but think that an opportunity was lost to concentrate all services on one station by moving the Wallgate platforms to the other side of the road and havving a common station entrance in between the two lines as at Perth/Stone etc.
And how much would that cost?
 

Joseph_Locke

Established Member
Joined
14 Apr 2012
Messages
1,878
Location
Within earshot of trains passing the one and half
A pair of platforms and a "modular" building on the site of the present car park?

Plus potential land purchase and earthworks, signalling alterations (WW101/102 would be in the middle of the new platform), a rather tricky Derogation for placing new platforms on a 1 in 88 gradient and a 360m radius, works to Foggy Lane footbridge ...
 

QueensCurve

Established Member
Joined
22 Dec 2014
Messages
2,195
Plus potential land purchase and earthworks, signalling alterations (WW101/102 would be in the middle of the new platform), a rather tricky Derogation for placing new platforms on a 1 in 88 gradient and a 360m radius, works to Foggy Lane footbridge ...

You are so impressively knowledgeable.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,902
Location
Mold, Clwyd
Rail is reporting (#786, p6) that Network Rail has not yet signed a contract with Carillion to complete NW electrification (as of October 14).
Who's doing the alterations at Ordsall Lane then, linked to the Ordsall Chord?
 

Joseph_Locke

Established Member
Joined
14 Apr 2012
Messages
1,878
Location
Within earshot of trains passing the one and half
Rail is reporting (#786, p6) that Network Rail has not yet signed a contract with Carillion to complete NW electrification (as of October 14).
Who's doing the alterations at Ordsall Lane then, linked to the Ordsall Chord?

Rail is 14 days behind the curve.

The Chord is a JV of BAM, Skanksa, Aecom and Mott MacDonald with Siemens, Amey Sersa et al delivering the Rail Systems stuff - I guess that Carillion would pick up the OLE for this too, but I'd have to check.
 

CAF397

Member
Joined
15 Sep 2010
Messages
1,095
Location
Lancashire
Network Rail has been pushing the remodelling of Oxford Road and Piccadilly on Twitter, are they linked to the Ordsall Curve works? They've given a start date of 2016 and a completion of the end of 2018. Just wondering if they were original projections, and if so they shouldn't be affected by any delay in the Ordsall affair.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,902
Location
Mold, Clwyd
Network Rail has been pushing the remodelling of Oxford Road and Piccadilly on Twitter, are they linked to the Ordsall Curve works? They've given a start date of 2016 and a completion of the end of 2018. Just wondering if they were original projections, and if so they shouldn't be affected by any delay in the Ordsall affair.

The corridor works haven't even had their public inquiry yet, so it's too early to tell if it will be a long-drawn-out affair like the Chord.
There are some significant objectors (Manchester University for instance).
The heritage issues should be less than the Chord, although a greater number of people/businesses along the route will be impacted.
There are some big housing developments near Oxford Road too, the lineside landscape changes every week as new towers go up.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
The corridor works haven't even had their public inquiry yet, so it's too early to tell if it will be a long-drawn-out affair like the Chord.
There are some significant objectors (Manchester University for instance).
The heritage issues should be less than the Chord, although a greater number of people/businesses along the route will be impacted.

The inquiry has opened and is apparently due to close on Friday. Nobody is opposed to the principle of the scheme, just aspects of it that affect them.

http://manchester-piccadilly.persona-pi.com/
 
Last edited:

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,902
Location
Mold, Clwyd
The inquiry has opened and is apparently due to close on Friday. Nobody is opposed to the principle of the scheme, just aspects of it that affect them.
http://manchester-piccadilly.persona-pi.com/

The NR closing statement looks quite positive, and there do not look like being major objections.
They make reference to a 35-day blockade in August 2019, presumably to commission the new infrastructure.
Thankfully they are doing away with the footbridge (and canopies) at Oxford Road!
 

LDECRexile

Established Member
Joined
30 Jan 2014
Messages
2,149
Location
Southport, UK
Paul and I went to see Fillie today.

We arrived 11:15-ish with madame sticking out by about three metres*. Proof positive that she must have been aligned correctly.

We went away after a while and when we came back 13:30-ish she was a good metre further out.

Early stage dismantling preparations appeared to be taking place, eg erecting scaffolding, including inside her.

Photos later.

*amateur estimates
--- old post above --- --- new post below ---
I've added Paul's shots to his album here:

https://www.flickr.com/photos/127646831@N03/albums/72157649792560381

and our joint efforts to the Combined Volume here:

https://www.flickr.com/photos/127646831@N03/albums/72157648767927083

Thank you Paul

PS: please compare the first two shots
 
Last edited:

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,661
The NR closing statement looks quite positive, and there do not look like being major objections.
They make reference to a 35-day blockade in August 2019, presumably to commission the new infrastructure.
Thankfully they are doing away with the footbridge (and canopies) at Oxford Road!

Interested to see how they keep Trafford Park Terminal open.

Also surely it might be better beginning in mid July 2019 to minimise disruption to the football season and to coincide with the summer holidays
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,474
Location
Preston Lancs

LDECRexile

Established Member
Joined
30 Jan 2014
Messages
2,149
Location
Southport, UK
Outstanding. This thread has become a must read just like the Liverpool-Manchester electrification was. Really looking forward to base, mast, danglies, wires count.

I am home xmas -New Year - must take a day out of my schedule.

Good to hear from you, thanks for your comments.

I also hope we can have a jingling jaunt.

Will Blackpool-Manchester be TGBU-free I wonder? The Progressometer's been stuck for too long for comfort.
 

Chrisyd

Member
Joined
16 May 2015
Messages
210
Aside from being 4 days late, the Bolton News articles announcing the break through also confirms that Fillie starts to be removed from site this Saturday and that the road closures between 8pm and 6am on the A666 (which have occurred over October for other reasons) will now continue for another week (possibly longer) for the large wagons required.

http://www.theboltonnews.co.uk/news...the_tunnel_after__breakthrough__at_Farnworth/

Edited to add clarity
 
Last edited:

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
The Bolton News must be reading Twitter. Same delay, same pictures.

To be exact, it says that some more overnight lane closures will be required, not that the previous overnight road closures will continue. I imagine only the left-hand southbound lane will be affected, as that's where the access is.

It also says a short closure of the entire railway will be required, details to come later.
 
Last edited:

geoffk

On Moderation
Joined
4 Aug 2010
Messages
3,926
Location
Exeter
If this work means doing away with bay platform 5 at Oxford Road then better use must be made of the rarely-used platform 1. Currently the lifts don't serve it.
 

Howardh

Established Member
Joined
17 May 2011
Messages
9,770

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,237
If this work means doing away with bay platform 5 at Oxford Road then better use must be made of the rarely-used platform 1. Currently the lifts don't serve it.

Drawings in the public inquiry evidence suggest three lifts at Oxford Rd, and completely re-designed stairs and footbridge, with stairs in both directions onto P1 and P2/3.

Faintly reminiscent of Reading, but on a smaller scale.

Figures 5.3a, 5.3b of this file for example:

(Warning, it's a large pdf and quite slow to download)

http://bailey.persona-pi.com/Public...roofs-of-Evidence/2/PoE_NR_2.3 Appendix A.pdf
 