Last edited:
Words fail me as to how BB can describe NR as "difficult". NR are top-flight by comparison ...
Sounds like the classic non-meeting of minds.
Well I entered a prize draw at work to go to the tunnel of joy and I won. So expect some close up photos of the tunnel and Fillie to be appearing next week! We are actually going inside the tunnel so be interesting to see how far they have got!
. Quite happy with the new camera! We didnt get to inside due to paperwork issues! Pretty disappointed. I wondering if when it is complete and before the rails go down they might arrange a trip to walk through for the locals. Apparently if you are a resident they are more than happy to take you down if you arrange it.Hi Snowball, I was thinking that LDEC might have linked up before me, Ive sent them to him for his collection and anyone else not on SSC. Quite happy with the new camera! We didnt get to inside due to paperwork issues! Pretty disappointed. I wondering if when it is complete and before the rails go down they might arrange a trip to walk through for the locals. Apparently if you are a resident they are more than happy to take you down if you arrange it.
The rearmost part of the gubbins towed by Fillie is 11 concrete rings in, that's 15.4 metres. To that has to be added the unknown distance from there to the cutting edge - maybe 20m??? So maybe 35m progress in about 25 days?? So 235m still to go?
Or could the distance between the front of Fillie and the back of the towed stuff be significantly greater??
I've now received 24 fascinating photos from Geeves. I've also received two sets of in-laws, with children, so I have not yet been able to give the shots the attention they deserve.
However, I have added them to Geeves's album here:
https://www.flickr.com/photos/127646831@N03/albums/72157651833403490
and to the Combined Volume here:
https://www.flickr.com/photos/127646831@N03/albums/72157648767927083
I will strive to annotate them properly as family commitments allow over the next couple of days.
Thank you Geeves.
Two sets of in-laws?hock: My sympathies!
More seriously: Geeves has provided some great photographs.
What is the square pit that is being dug just outside the northern portal?
(https://www.flickr.com/photos/127646831@N03/20301009033/in/album-72157648767927083/)
As reg says it's a reception pit for Fillie to arrive in when she's finished.What is the square pit that is being dug just outside the northern portal?
As reg says it's a reception pit for Fillie to arrive in when she's finished.
Look at how much lower her starting pit at the Kearsley end is compared with the adjacent track. The reception pit replicates that.
As reg says it's a reception pit for Fillie to arrive in when she's finished.
Look at how much lower her starting pit at the Kearsley end is compared with the adjacent track. The reception pit replicates that.
The tunnel boring machine is a one use specially designed product and unfortunately there are no more tunnels being built in Manchester any time soon! The TBM will be scrapped and its reusable parts sold
The internal cutting head is of a similar design to the ones used to bore out tunnels too small or complicated for TBMs - e.g. the cross-passages at the bored Crossrail stations - so it can be relatively easily replaced in future.
Any further news on replacement contractors for Balfour Beatty and possible cancellation of any of the different phases?