I thought the redundant bore at Farnworth was to be overspill storage for the Strategic Steam Reserve? 
A proposal by the British Pig Breeders Association is to use it to nurture young breeding males.
--- old post above --- --- new post below ---
Joe Callaghan has kindly sent a shot of track laying between Farnworth and Moses Gate.
I've added it to Joe's album here:
https://www.flickr.com/photos/127646831@N03/sets/72157651953947345
and to the Combined Volume here:
https://www.flickr.com/photos/127646831@N03/sets/72157648767927083
Thank you Joe.
I would hope so.
I'm sure someone will know more about it than me.
Manchester -Preston, Preston-Blackpool, have BB walked from both these schemes? Is so the timescale for Mcr-Preston must be in doubt as NR will have to re tender the work via an European Journal advert which is seriously time consuming !
I should think they will re-award NW to one of the others, who will hopefully pick up the local resources.Six geographic framework contracts have been awarded, with each having a defined workbank of schemes to be delivered.
This approach has been endorsed by the supply chain and industry groups such as the Railway Industry Association, said Network Rail..
The companies involved are Balfour Beatty, AmeyInabensa, CarillionPowerlines and ABC Electrification
Possibly the wrong thread but it's good to catch JL when he's being talkative.
Can we be confident that the "pause" on TP electrification doesn't include NW phase 5, Stalybridge?
I've added it to Joe's album here:
https://www.flickr.com/photos/127646831@N03/sets/72157651953947345
and to the Combined Volume here:
https://www.flickr.com/photos/127646831@N03/sets/72157648767927083
Thank you Joe.
No wonder rail projects are over budget when all companies involved want a cut. Surely one company doing everything would be cheaper because there must be some overlapping duplication of resources and manpower?
Is it more economical for contractors to be used versus Network Rail employing their own engineers?
Not all companies have the same experience and capabilities. For example in that list the first three are civil engineering constructors of various types, the next three are civils designers and the last two systems engineers.
I understand NR have to contract out as they do not have inhouse facilities, but there must be duplication of expertise, and cost, by employing more than one company?
Joe Callaghan has sent two more topical shots of progress at Farnworth. I share his puzzlement over the kink which seems to have moved since last weekend.
Joe Callaghan has sent two more topical shots of progress at Farnworth. I share his puzzlement over the kink which seems to have moved since last weekend.
I've added them to Joe's album here:
https://www.flickr.com/photos/127646831@N03/sets/72157651953947345
and to the Combined Volume here:
https://www.flickr.com/photos/127646831@N03/sets/72157648767927083
Thank you Joe.
Dave, the kink in 4496M looks like it's the section of track shown in 4492M. That section looks like it's made up with steel, timber and concrete sleepers. Strange; maybe as a cost saving measure it was a demonstrator or sample, stolen from Railtex after the show.
As far as the kink when installed, although it's probably at the limit of misalignment, but final tensioning can pull joggles like that out, just look at the photos showing the third track near Roby whilst it was being laid. I don't remember it being like that when we did the line, my camcorder wouldn't have covered the shake from that in a 185 at 80+!
As part of the rebuild of the platforms at Farnworth are they being lengthened and what will the new lengths be please.